Wuyangcun station

Wuyangcun

五羊邨
Guangzhou Metro
Platform 3 of Line 10 (towards Yangji East)
Chinese name
Chinese五羊邨站
Literal meaningWuyang (Five Rams) Estate station
Transcriptions
Standard Mandarin
Hanyu PinyinWǔyángcūn Zhàn
Yue: Cantonese
Yale RomanizationŃghyèuhngchyūn Jaahm
JyutpingNg5joeng4cyun1 Zaam6
Hong Kong RomanizationNg Yeung Chuen station
General information
LocationWest side of the intersection of Siyou New Road (寺右新马路) and Guangzhou Avenue (广州大道)
Dongshan Subdistrict, Yuexiu District, Guangzhou, Guangdong
China
Coordinates23°07′11″N 113°18′53″E / 23.1198°N 113.3147°E / 23.1198; 113.3147
Operated byGuangzhou Metro Co. Ltd.
Lines
Platforms4 (2 island platforms)
Tracks4
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code512 1011
History
Opened
  •      Line 5: 28 December 2009 (16 years ago) (2009-12-28)
  •      Line 10: 29 June 2025 (8 months ago) (2025-06-29)
Services
Preceding station Guangzhou Metro Following station
Yangji
towards Jiaokou
Line 5 Zhujiang New Town
Donghu
towards Xilang
Line 10 Yangji East
Terminus
Future Line 3 branch dismantling section
Donghu
towards Xilang
Line 10 Yangji East
Location
Map

Wuyangcun station (Chinese: 五羊邨站; Jyutping: ng5 joeng4 cyun1 zaam6; Cantonese Yale: Ńghyèuhngchyūn Jaahm), formerly Wuyang New Town station (五羊新城站; ng5 joeng4 san1 sing4 zaam6) during planning, is an interchange station between Line 5 and Line 10 of the Guangzhou Metro. It is located under the junction of Siyou New Road (寺右新马路) and Guangzhou Avenue (广州大道), in Wuyang New Town, Yuexiu District. It opened on 28 December 2009. On 29 June 2025, Line 10 started operations, and the station became an interchange station.[1]

Station layout

The station is divided into two sections, Line 5 and Line 10, both under Siyou New Road, with Line 5 on the east side and Line 10 on the west side. It is surrounded by Guangzhou Avenue Middle, Siyou New Road, Siyou 2nd Road, Wuyang New Town and other nearby buildings.

Line 5

The Line 5 station is a three-storey underground station. The ground level is the exit, the first floor is the concourse, the second floor is the equipment level, and the third floor is the platform for Line 5.

G - Exits A-D
L1
Concourse
Lobby Ticket Machines, Customer Service, Shops, Police Station, Security Facilities, Toilets, Nursery
Transfer passage towards Line  10  (U/C)
L2
Equipment Area
- Station Equipment
L3
Platforms
Platform 2 arrow for L  5  towards Jiaokou (Yangji)
Island platform, doors will open on the left
Platform 1  5  towards Huangpu New Port (Zhujiang New Town) arrow for R

Line 10

The Line 10 station is a five-storey underground station. The ground level is the exit, the first floor is the transfer level between the exits and concourse, the second floor is the transfer passage to Line 5, the third floor is the concourse, the fourth floor is the equipment level, and the fifth floor is the platform for Line 10.

G - Exits E and F
L1 Transfer level Towards concourse and exits
Station Equipment
L2 Transfer passage Towards Line  5  (U/C)
L3
Concourse
Lobby Ticket Machines, Customer Service, Shops, Police Station, Security Facilities, Toilets, Nursery
L4
Equipment Area
- Station Equipment
L5
Platforms
Platform 4 arrow for L  10  towards Xilang (Donghu)
Island platform, doors will open on the left
Platform 3  10  towards Yangji East (terminus) arrow for R

Concourse

The concourse is divided into two parts, Line 5 and Line 10, which are connected by a paid area transfer passage under construction. There are automatic ticket machines and AI intelligent customer service centers in both concourses. The Line 5 concourse also has convenience stores, lottery shops, other shops as well as self-service facilities such as automatic vending machines, shared charging stations and card vending machines.

There are elevators, escalators, and stairs in the fare-paid areas of the Line 5 and Line 10 concourses for passengers to reach the platforms.

Toilets and a nursery room are located in both the Line 5 and Line 10 concourses. The Line 5 concourse toilets are located near Exit A, and the nursery room is located near Exit D within the unpaid area. The Line 10 concourse toilets and a nursery room are located next to the elevator in the paid area. There are also automated external defibrillators near Exit A for the Line 5 concourse and next to the station control center for the Line 10 concourse. It is worth mentioning that this station on Line 5 was the first underground station in Guangzhou to be equipped with toilets when it was first opened.[2]

Transfer method

The station is designed with transfers in mind during the design Line 10, and a transfer passage will be constructed between the Line 10 concourse and the west side of the Line 5 concourse near Exit A.[3] Due to the slow progress of the construction of the transfer passage, it could not be opened in the initial stage of the opening of Line 10, and the station needs to implement a virtual transfer via an out-of-station interchange (OSI).[4] Similar to Pazhou station, which implemented the virtual transfer method earlier, passengers can be regarded as transferring at the same station within 30 minutes after exiting the station through the blue turnstile dedicated to transfer and will not affect the calculation of fares. Holders of single-journey tickets and other types of tickets can also use virtual transfers, and one-way tickets will not be collected when exiting the dedicated turnstile. However, security checks are still required when you re-enter the station. The walking distance between Exit A of Line 5 and Exit F of Line 10 is around 6 minutes.[5]

Platforms

The station has island platforms for both Line 5 and Line 10, in which both are located under Siyou New Road.[6] Line 5 is located on the upper floor on the east side, and Line 10 is located on the lower floor on the west side.

Entrances/exits

Wuyangcun has 6 points of entry/exit. Line 5 has four (A-D) and Line 10 has two (E-F). Exits A and F are accessible via elevators.

History

Line 5

Wuyangcun Station under construction

In the 1997 "Guangzhou City Urban Rapid Rail Traffic Network Planning Research (Final Report)", the then Line 3 passed through Xicun and continued along West Huanshi Road to reach the area of Zhujiang New Town, and this station was set up on the way, which appeared as Wuyang New Town station at that time. Later, in the 2003 proposal, Line 3 was renumbered Line 5, and the station was confirmed to be one of the stations of the current Line 5, and construction was implemented.[7]

On 26 June 2006, construction of the station officially began with the full Line 5. On the eve of its opening, the station was named Wuyangcun station. On 28 December 2009, the station opened with the start of trial operation of Line 5.[8]

Line 10

In the early days of planning, Line 10 had a Siyou Xinmalu station on the west side of Yangji Estate. Due to the distance from Wuyangcun Station of Line 5, it was not designed as an interchange station. Later, the station was moved eastward to the east side of Yangji East, but because the demolition volume and construction restrictions of the scheme were large, the station continued to move eastward to its current location. Later, at the preliminary design review of Line 10, experts commented that the two stations should be considered for an interchange.[9] Subsequently, it was stated in the tender documents of the Line 10 EPC project that the Siyou Xinmalu station was located close to Wuyangcun Station of Line 5, and it was confirmed that there would be a transfer passage to connect the two stations.[3][10]

Line 10 station began to be enclosed in June 2019.[11] Construction of the first bored pile began in March 2020,[12] and construction of the enclosure structure began on 21 January 2021.[13] The station completed the "three rights" transfer on 21 April 2025.[14]

On 8 April 2025, the initial name of the stations on Line 10 was announced, and the station was regarded as an interchange station with the existing Wuyangcun Station of Line 5, therefore the name of Wuyangcun station was used.[15] However, due to the slow progress of the construction of the transfer passage, it is unable to be opened with the initial opening of Line 10, and the station needs to implement a virtual transfer via an out-of-station interchange (OSI).[4] On 21 May, part of the Line 5 concourse began to be enclosed to cooperate with the renovation works required for the implementation of the virtual transfer at the station. In the future, when the transfer passage is constructed, it is necessary to renovate Exit A, its attached toilets and re-configure the scope of the paid area of the Line 5 concourse.

On 29 June 2025, the Line 10 station was opened.[1]

References

  1. ^ a b 李天研 (29 June 2025). "两条地铁新线"抢闸"开通,滨江东街坊:终于等到你!" [Two new subway lines were opened at the first opportunity, and residents of Binjiang East said: We’ve finally waited for you!]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 29 June 2025. Retrieved 8 July 2025.
  2. ^ 李佳文 (16 December 2009). "地铁首设地下公厕 位于五号线五羊邨站" [The first underground public toilet in the metro is located at Wuyangcun Station on Line 5]. New Express Daily (in Simplified Chinese) – via Sina News.{{cite news}}: CS1 maint: deprecated archival service (link)
  3. ^ a b "广州市轨道交通十号线及同步实施工程总承包项目招标文件" [Guangzhou Metro Line 10 and Synchronous Implementation Project General Contracting Project Bidding Documents] (in Simplified Chinese). Guangzhou Public Resources Trading Center. 20 September 2018. Archived from the original on 22 September 2018. Retrieved 8 July 2025.
  4. ^ a b 李佳文 (22 May 2025). "广州地铁十号线年内开通,五羊邨站采取临时站外换乘" [Guangzhou Metro Line 10 will be opened this year, Wuyangcun Station will adopt temporary out-of-station transfer]. New Express Daily (in Simplified Chinese). Archived from the original on 22 May 2025. Retrieved 8 July 2025.
  5. ^ 李佳文 (29 June 2025). "新快报记者现场体验广州地铁十号线五羊邨站临时站外换乘通道,耗时约6分钟" [New Express Daily reporter experienced the temporary transfer channel outside the Wuyangcun Station of Guangzhou Metro Line 10, which took about 6 minutes]. New Express Daily (in Simplified Chinese). Archived from the original on 29 June 2025. Retrieved 8 July 2025.
  6. ^ "2005年度广州市地名命名更名变更(七)" [Name changes of Guangzhou places in 2005 (Part 7)]. Guangdong Provincial Department of Civil Affairs (in Simplified Chinese). 22 February 2006. Archived from the original on 19 February 2012.
  7. ^ 唐慧杰 (27 March 2004). "广州地铁五号线规划方案出台 站点揭开盖头" [Guangzhou Metro Line 5 planning scheme released, stations unveiled]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 7 March 2009. Retrieved 8 July 2025 – via Sina News.
  8. ^ 黄熹; 黄宙辉 (28 December 2009). "广州地铁五号线正式开通 约50万人受益" [Guangzhou Metro Line 5 officially opened, benefiting about 500,000 people]. Yangcheng Evening News (in Simplified Chinese). Archived from the original on 28 May 2022. Retrieved 8 July 2025 – via Sohu News.
  9. ^ 李天研 (5 June 2018). "十号线换乘站 8座拟变10座" [Transfer station for Line 10: 8 stations to be converted into 10]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 3 June 2022. Retrieved 8 July 2025 – via Sina News.
  10. ^ 郑慧梓 (25 October 2023). "地铁10号线天河路至西塱段今日全贯通!寺右新马路站拟设2个出入口" [Metro Line 10 Tianhe Road to Xilang section is now bored through! Siyou Xinmalu Station plans to have 2 entrances/exits]. Nanfang Daily (in Simplified Chinese). Archived from the original on 25 October 2023. Retrieved 8 July 2025.
  11. ^ 余秋亮 (3 June 2019). "广州地铁十号线寺右新马路站即将动工,如何绕行看这里!" [Guangzhou Metro Line 10 Siyouxinmalu Station is about to start construction. Here’s how to get around it!]. Nanfang Daily (in Simplified Chinese). Archived from the original on 7 January 2024. Retrieved 8 July 2025.
  12. ^ "开足马力抓生产,复工复产见成效" [Working at full capacity to ensure production, and resuming work and production has achieved results]. China Railway Construction Bridge Engineering Group Co., Ltd. (in Simplified Chinese). 13 March 2020. Retrieved 8 July 2025 – via Official WeChat Account.{{cite web}}: CS1 maint: deprecated archival service (link)
  13. ^ "寺右新马路站围护结构工程顺利开工" [The enclosure structure project of Siyou Xinmalu Station started smoothly]. Guizhou Geological and Mining Foundation Engineering Co., Ltd. (in Simplified Chinese). 22 January 2021. Retrieved 8 July 2025 – via Official WeChat Account.{{cite web}}: CS1 maint: deprecated archival service (link)
  14. ^ "广州10号线项目顺利通过验收并完成三权移交" [Guangzhou Line 10 project successfully passed the acceptance and completed the three-rights transfer]. China Railway 11th Bureau Group Electrical Engineering Co., Ltd. (in Simplified Chinese). 28 April 2025. Retrieved 8 July 2025 – via Official WeChat Account.{{cite web}}: CS1 maint: deprecated archival service (link)
  15. ^ 李天研 (22 April 2025). "地铁十号线换乘站有变:新增五羊邨站换乘,取消石溪站换乘" [The transfer station of Metro Line 10 has changed: Wuyangcun Station has been added, and Shixi Station has been cancelled]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 22 April 2025. Retrieved 8 July 2025.