Jiahewanggang station

Jiahewanggang

嘉禾望岗
Guangzhou Metro
Platform 2
Chinese name
Simplified Chinese嘉禾望岗站
Traditional Chinese嘉禾望崗站
Transcriptions
Standard Mandarin
Hanyu PinyinJiāhéwànggǎng Zhàn
Yue: Cantonese
Yale RomanizationGāwòhmohnggōng Jaahm
JyutpingGaa1wo4mong6gong1 Zaam6
Hong Kong RomanizationKa Wo Mong Kong station
General information
LocationKonggang Avenue (空港大道) and Wanggang Avenue (望岗大道)
Baiyun District, Guangzhou, Guangdong
China
Operated byGuangzhou Metro Co. Ltd.
Lines
Platforms6 (3 island platforms)
Tracks6
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code224 325 1409
History
Opened     Line 2: 25 September 2010;
15 years ago
 (2010-09-25)
     Line 3: 30 October 2010;
15 years ago
 (2010-10-30)
     Line 14: 28 December 2018;
7 years ago
 (2018-12-28)
Services
Preceding station Guangzhou Metro Following station
Huangbian Line 2 Terminus
Baiyundadaobei
towards Haibang
Line 3 Longgui
towards Airport North (Terminal 2)
Pengbian
towards Lejia Road
Line 14 Baiyun Dongping
towards Dongfeng
Location
Map

Jiahewanggang Station (Chinese: 嘉禾望岗站; Jyutping: gaa1 wo4 mong6 gong1 zaam6; Cantonese Yale: Gāwòhmohnggōng Jaahm), formerly known as Jiahe Station (嘉禾站; gaa1 wo4 zaam6; Gāwòh Jaahm) during its planning stages, is an interchange station between Line 2, Line 3, and Line 14 of the Guangzhou Metro. It is also the northern terminus of Line 2, and the former southern terminus of Line 14 before Phase 2. It is located underground, just northwest of Lingnan New World Garden[1] in Baiyun District of Guangzhou.[2] It started operation on 25 September 2010. On 28 December 2018, Line 14 (Phase 1) opened. Jiahewanggang became the interchange station of Line 2, Line 3 and Line 14.

This station provides cross-platform interchange between Line 2 and Line 3, with Line 2 stopping on the inner platforms and Line 3 stopping on the outer platforms. The Line 14 platforms are located one level below the Line 2 and Line 3 platforms.

The station was the southern terminus of the Line 14 mainline until the phase 2 extension to Lejia Road opened on 29 September 2025.[3]

Station layout

G
Concourse
Lobby Ticket Machines, Customer Service, Police Station, Safety Facilities, Toilets
B1
Equipment Area & Concourse
Line 14 Lobby Customer Service, Vending machines, ATMs
- Station Equipment
Buffer Area Buffer area of Line 2 & 3
B2
Platforms
Platform 6 arrow for L  14  towards Lejia Road (Pengbian)
Island platform, doors will open on the left
Platform 5  14  towards Dongfeng (Baiyun Dongping) arrow for R
Platform 3 arrow for L  3  towards Haibang (Baiyundadaobei)
Island platform, doors will open on the right for  2  and left for  3 
Platform 2 arrow for L  2  towards Guangzhou South Railway Station (Huangbian)
Platform 1  2  termination platform arrow for R
Island platform, doors will open on the right for  2  and left for  3 
Platform 4  3  towards Airport North (Longgui) arrow for R

References

  1. ^ simplified Chinese: 岭南新世界花园; traditional Chinese: 嶺南新世界花園; pinyin: Lǐngnán Xīnshìjiè Huāyuán; Jyutping: Ling5naam4 San1sai3gaai3 Faa1jyun2; Cantonese Yale: Líhngnàahm Sānsaigaai Fāyún
  2. ^ 地铁二号线北延段新旧站名对比 (in Simplified Chinese). Archived from the original on 2010-06-15. Retrieved 2010-01-13.
  3. ^ 李天研 (2025-09-28). "广州地铁官宣:3条(段)城际铁路2条(段)地铁9月29日开通" [Guangzhou Metro officially announced: 3 intercity railway lines (sections) and 2 subway lines (sections) will open on 29 September]. Guangzhou Daily. Retrieved 2025-09-29.{{cite news}}: CS1 maint: deprecated archival service (link)

23°14′23″N 113°17′01″E / 23.2397°N 113.283656°E / 23.2397; 113.283656