Gundavali metro station

Gundavali

गुंदवली
Entrance B of Gundavali metro station
General information
Other namesAndheri (East)
LocationAndheri East, Mumbai, Maharashtra 400053
Coordinates19°06′54″N 72°51′19″E / 19.11502°N 72.85517°E / 19.11502; 72.85517
Owned by Mumbai Metropolitan Region Development Authority
Operated by Maha Mumbai Metro Operation Corporation Ltd.
Lines
Platforms2 side platforms
Connections Blue Line 1 at WEH
Construction
Structure typeElevated
ParkingNo
AccessibleYes Disabled access
Other information
Station code713
History
Opened20 January 2023; 3 years ago (2023-01-20)
Services
Preceding station Mumbai Metro Following station
Mogra
712
towards Ovaripada
Red Line 7 Terminus
Terminus Red Line 7A
(under construction)
Airport Colony
Location
Map

Gundavali is the elevated southern terminal metro station on the North-South corridor of the Red Line 7 of Mumbai Metro in Mumbai, India. This metro station was inaugurated on 20 January 2023 by Prime Minister Narendra Modi. [1][2][3]

Gundavali is connected to the Western Express Highway station on Line 1 through a 58 metre long foot overbridge.[4]

Station layout

2nd Floor Side platform Disabled access
Platform 1 Alighting only →
Platform 2 ← towards Ovaripada (Mogra)
Side platform Disabled access
1st Floor Mezzanine Fare control, station agent, Metro QR ticket vending machines, crossover
Ground Street level Exit/Entrance

Power and signaling system

Like all other stations and railways of Mumbai metro, Gundavali station also uses 25,000 volt AC power system by overhead catenary to operate the trains.

See also

References

  • UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.