The MBIR is a multi-loop research reactor capable of testing lead, lead-bismuth and gas coolants, and run on MOX fuel. MBIR intends to replace the old BOR-60 experimental fast reactor that started operations at RIAR's site in 1969. It will have a design life of 50 years.[3]
History
Construction has started in 2015.[4]
MBIR control assembly was installed in 2019.[5]
Reactor vessel was installed in 2023.[6]
Pilot fuel elements were produced in 2024. The MBIR is scheduled to begin operation in 2027.[3]
Estimated commissioning date is 2028.[2]
See also
- Generation IV reactor
- BN-800 reactor - generation IV sodium-cooled fast breeder reactor, operational since 2016
- BREST-300 - generation IV lead-cooled fast reactor, in construction since 2020
References
- ^ a b c "Fast Neutron Reactors". world-nuclear.org. Retrieved 31 August 2024.
- ^ a b c "MBIR reactor".
- ^ a b "Pilot fuel elements produced for MBIR fast neutron research reactor".
- ^ "Russia begins construction of MBIR". 16 September 2015.
- ^ "Russia starts installing MBIR control assembly".
- ^ "MBIR gets its reactor vessel".