Line 20 is a rapid transit line in the Shenzhen Metro system. The line connects Airport North with the Convention & Exhibition City.[2][3][4]

Construction started on 24 November 2016.[2] The National Development and Reform Commission approved the project in March 2020.[5] It opened on 28 December 2021,[6] after being delayed since 2018.[2]

Stations

Station name[7] Connections Nearby bus stops Distance
km
Location
English Chinese
Convention & Exhibition City 会展城 0.0 0.0 Bao'an
Shenzhen World North 国展北 12 B892 M515 Peak-time 81(高峰81) 1.6 1.6
Shenzhen World 国展 12 615 B892 M515 0.8 2.4
Shenzhen World South 国展南 M341 1.3 3.7
Airport North 机场北 11 Shenzhen Bao'an International Airport SZX
Shenzhen Airport North railway station SBA
4.4 8.1

Phase 2

  • Phase 2 of Line 20 will add 14 stations from Airport North to Futian Bonded Area South. The line is 24.9 km in length. Construction started on the section between Airport North and Baishizhou on 10 October 2023, and this section is expected to open in February 2029. The remaining section between Baishizhou and Futian Convention and Exhibition Centre is still under planning, and the section between Futian Convention and Exhibition Centre and Futian Bonded Area South has not been submitted for approval.
Station name Connections Location
English Chinese
Airport East 机场东 1 12 Bao'an
Hangcheng Hospital 航城医院
Hangcheng 航城
Xixiang Park 西乡公园  15 
Shangchuan 1st Road 上川一路
Xin'an Old Town 新安老城
Zhongshan Park West 中山公园西 Nanshan
Nantou Ancient City 南头古城 12
Shenzhen University 深大 1 13
Hi-Tech Park 高新园 1
Baishizhou 白石洲 1  29 
Down arrow Under Planning (Phase 2 remaining section) Down arrow
Window of the World 世界之窗 1 2 8 Nanshan
Xiangmihu West 香蜜湖西  14   22  Futian
Futian Convention & Exhibition Center 福田会展
Huanggang Checkpoint 皇岗口岸 7
Futian Checkpoint 福田口岸 4 10
Futian Bonded Area South 福保南  22 

Rolling stock

Line 20 train

Line 20 currently uses 9 sets of Size A subway trains in eight car sets (no. 2001–2009) with a maximum speed of 120 km/h (75 mph). It's the first time that Shenzhen Metro use GoA4 automatic train operation. The GoA4 construction standard is applied to Phase I of Shenzhen Metro Line 20, which can fully achieve the automatic operation of unattended trains after opening, and the trains can also automatically sleep, wake up and conduct self inspection. In addition, the train also has more than ten functions, such as train stop control, door platform door alignment isolation, etc.[8]

Type Date of manufacture Series Sets Serial number Assembly Notes
Type A 2020 - 2021 A-size stock 9 2001-2009 Tc+Mp+M+Mp+M+M+Mp+Tc Manufactured by CRRC Changchun Railway Vehicles

References