Sõda

MEEDIAVALVUR: algab „sõjalise erioperatsiooni“ teine etapp nimega „SÕDA“

Line 18 of the Shenzhen Metro is an express line under planning, which will connect across Shenzhen for 69.1 kilometers and 29 stations through the districts of Bao'an, Guangming, Guanlan, Pinghu, Longgang and Yantian.[1] The first phase of Line 18 originally entered Phase V planning in September 2022, and will run from Shajing in Bao'an District to Baihua in Guangming District, with 8 stations and 18.7 kilometers of track,[2][3] however planning has been put on hold since 31 March 2023. The line is proposed to use 6 car type A trains.

Stations (Phase 1)

Station name Connections Location
English Chinese
Shajing 沙井 11 Bao'an
Shangliao 上寮
Xinqiao 新桥
Genyu Road 根玉路 Guangming
Tianliao 田寮
Changzhen 长圳 6
Guangmingcheng 光明城  6B   13 
Baihua 白花

References

Kommenteeri