Çamlıkule (İzmir Metro)

Çamlıkule
General information
Location220/39 Sk., Çamlıkule Mah., 35390
Buca
Coordinates38°22′14″N 27°10′16″E / 38.370556°N 27.171111°E / 38.370556; 27.171111
Systemİzmir Metro rapid transit station
Owned byİzmir Metropolitan Municipality
Operated byİzmir Metro A.Ş.
Line
  M2
Platforms1 island platform
Tracks2
Construction
AccessibleYes
History
Opening2027; 1 year's time (2027) (expected)
Services
Preceding station İzmir Metro Following station
Future service
Buca Koop.
towards Üçyol
M2 Gediz
towards Fuar İzmir
Location
Map

Çamlıkule is a proposed underground station on the Üçyol—Fuar İzmir Line of the İzmir Metro. It will be located beneath 220/39th Street in Çamlıkule, Buca.[1] Construction of the station, along with the metro line, began in 2024.[2] Çamlıkule was the original southern terminus of the line until August 2025, when the line was extended three station further to Fuar İzmir.[3]

References

  1. ^ "Üçyol-Buca Metrosu Çamlıkule'ye uzadı - son yenilikler, ne zaman başlıyor?". izmirlininsesi (in Turkish). 3 August 2016. Archived from the original on 5 November 2017. Retrieved 25 December 2017.
  2. ^ "Üçyol- Buca Metrosu'nun yapımına 2018'de başlanacak". ensonhaber.com (in Turkish). 13 July 2017. Retrieved 25 December 2017.
  3. ^ https://www.izmir.bel.tr/tr/Haberler/tugay-buca-metrosunu-fuar-izmir-e-kadar-uzatacagiz/56667/156