Motilal Oswal - Malad West is an elevated metro station on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This station is located in Malad, Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), sponsored by Motilal Oswal and was inaugurated on 19 January 2023.[2][3][4]

History

Trial runs on section of 2A from Dahanukarwadi to Dahisar East has started from 31 May 2021. Dahisar East commercial operations began on 3 April 2022 with First phase of line 2A.

Station layout

G Street Level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Andheri West next station is Lower Malad
Platform 1
Northbound
Towards ← Dahisar East next station is Valnai
Side platform | Doors will open on the left Disabled access
L2

Power and signaling system

Like all other stations and railways of Mumbai metro, Malad West station also uses 25,000 volt AC power system by overhead catenary to operate the trains.

References

No tags for this post.