Ling Ao Nuclear Power Plant (岭澳核电站) is located on the Dapeng Peninsula in Longgang District, Shenzhen, Guangdong, China, about 60 km north of Hong Kong, 1 km north of Daya Bay Nuclear Power Plant. It is operated by China General Nuclear Power Group. The units on site are separated between phase I and phase II.

The plant was one of China's largest energy projects of the latter 1990s.[5]: 45 

Reactors

Ling Ao phase I has two nuclear reactors, 950 MWe PWRs Ling Ao I-1 and I-2, based on the French 900 MWe three cooling loop design (M310), which started commercial operation in 2002 and 2003.[6] The planned investment sum for phase I was ca 4 billion USD.[7]

In a Phase II development two CPR-1000 reactors, Ling Ao II-1 and II-2 (alternatively, units 3 and 4), were constructed in conjunction with Areva, based on the French three cooling loop design. Ling Ao II-1, China’s first domestic CPR-1000 nuclear power plant, was first connected to the grid on 15 July 2010,[8] having started criticality testing on 11 June 2010.[9] It started commercial operations on 27 September 2010.[10] Ling Ao II-2 was synchronized to the grid on May 3, 2011, with commercial operation beginning on August 7, 2011.[11]

Reactor data

The Ling Ao Nuclear Power Plant consist of 4 operational reactors.[12]

Unit Type Model Net
power
Gross
power
Thermal
power
Construction
start
First
criticality
Grid
connection
Operation
start
Notes
Ling Ao 1 PWR M310 950 MW 990 MW 2905 MW 1997-5-15 2002-02-04 2002-02-26 2002-05-28 [13]
Ling Ao 2 PWR M310 950 MW 990 MW 2905 MW 1997-11-28 2002-08-27 2002-09-14 2003-01-08 [14]
Ling Ao 3 PWR CPR-1000 1007 MW 1086 MW 2905 MW 2005-12-15 2010-06-09 2010-07-15 2010-09-15 [15]
Ling Ao 4 PWR CPR-1000 1007 MW 1086 MW 2905 MW 2006-6-15 2011-02-25 2011-05-03 2011-08-07 [16]

See also

References

  1. ^ a b c d e f g "LING AO-1". Power Reactor Information System, IAEA. 2022-08-27. Retrieved 2022-08-28.
  2. ^ a b c d e f g "LING AO-2". Power Reactor Information System, IAEA. 2022-08-27. Retrieved 2022-08-28.
  3. ^ a b c d e f g "LING AO-3". Power Reactor Information System, IAEA. 2022-08-27. Retrieved 2022-08-28.
  4. ^ a b c d e f g "LING AO-4". Power Reactor Information System, IAEA. 2022-08-27. Retrieved 2022-08-28.
  5. ^ Chen, Muyang (2024). The Latecomer's Rise: Policy Banks and the Globalization of China's Development Finance. Ithaca and London: Cornell University Press. ISBN 9781501775857. JSTOR 10.7591/jj.6230186.
  6. ^ "Fuel loading starts at new Chinese reactor". World Nuclear News. 22 April 2010. Retrieved 18 July 2010.
  7. ^ China Daily (2002-07-04). "Nuke Plant in Ling'ao Cuts Costs". China Internet Information Center. Retrieved 2020-01-04.
  8. ^ "First power at China's Ling Ao". Nuclear Engineering International. 16 July 2010. Archived from the original on 13 June 2011. Retrieved 17 July 2010.
  9. ^ "Reactor starts up at Ling Ao II". World Nuclear News. 11 June 2010. Retrieved 18 July 2010.
  10. ^ "New Ling Ao II unit enters into service". World Nuclear News. 27 September 2010. Retrieved 2 October 2010.
  11. ^ "Second Ling Ao II unit enters service". World Nuclear News. 8 August 2011. Retrieved 12 December 2012.
  12. ^ "Nuclear Power in China". www.world-nuclear.org. World Nuclear Association. Retrieved 2019-12-30.
  13. ^ "Ling Ao-1". Power Reactor Information System (PRIS). International Atomic Energy Agency (IAEA). 2019-12-29. Retrieved 2019-12-30.
  14. ^ "Ling Ao-2". Power Reactor Information System (PRIS). International Atomic Energy Agency (IAEA). 2019-12-29. Retrieved 2019-12-30.
  15. ^ "Ling Ao-3". Power Reactor Information System (PRIS). International Atomic Energy Agency (IAEA). 2019-12-29. Retrieved 2019-12-30.
  16. ^ "Ling Ao-4". Power Reactor Information System (PRIS). International Atomic Energy Agency (IAEA). 2019-12-29. Retrieved 2019-12-30.