For the planned line to Chongming Island originally designated as Line 19, see Chongming line.
Line 19 is an under construction subway line on the Shanghai Metro. Its termini are planned to be Baoshan Railway Station and Hongjian Road. It is planned to be 46.2 km (28.7 mi) in length, with 34 stations. The line hopes to ease car congestion along Pudong South Road, as well as reduce crowding on the southern part of line 8, and the northern sections of lines 1 and 3.
The line was announced by the Municipal government in 2016 and is planned to finish construction between Baoshan Railway Station and Yierba Jinian Road in July 2027, and the rest of the line in 2031.[1][2]
You must be logged in to post a comment.