Line 16 of the Hangzhou Metro (Chinese: 杭州地铁16号线; pinyin: Hángzhōu Dìtiě shíliù hào xiàn)[3] is a metro line running east–west from Lvting Road in Yuhang District to Jiuzhou Street in Lin'an District. The total length is 35.12 km (21.82 mi).[1] The line is colored light orange on system maps. The line began construction in early 2016[4] and opened on 23 April 2020.
Route overview
This line has a total length of about 35.12 km and a total of 12 stations. The average distance between stations is about 3.13 km, including 8 underground stations and 4 elevated stations. Each station usually with one staff on the platform and 4 staff on concourse for security check,two per entrance. Elevated section starts from around 500m before Nanhu, and ends at halfway after Babaili. All stations in elevated section are equipped with 2 air-conditioned waiting rooms. All washroom are outside the gates,except Lvting Road. The length of the line is 20.7 km in Lin'an District, with 6 stations (4 underground stations); in Yuhang District, the length is 14.3 km, with 6 stations (4 underground stations). The maximum operating speed of the line design is 120 km/h (75 mph), acceleration process takes around 600m to complete, and the average operating speed is 60 km/h (37 mph),[5] about 38 minutes one way.[6] The line trains are powered by 4 B-type cars and a 1500 V DC overhead catenary. A comprehensive vehicle base is set up in Xiaquan Village, Lin'an District, and the control center is located in the control center of Hangzhou Metro. The project uses a 35kV decentralized power supply scheme.[7]
History
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Lvting Road — Jiuzhou Street | 23 April 2020 | 34.41 km (21.38 mi) | 12 | Phase 1 |
Stations

Station name | Connections | Distance km |
Location | |||
---|---|---|---|---|---|---|
English | Chinese | |||||
Jiuzhou Street | 九州街 | 0.00 | 0.00 | Lin'an | ||
Lin'an Square | 临安广场 | 3.68 | 3.68 | |||
Zhejiang A&F University | 农林大学 | 4.09 | 7.77 | |||
Qingshanhu | 青山湖 | 1.98 | 9.75 | |||
Babaili | 八百里 | 2.42 | 12.17 | |||
Qingshanhu Sci-tech City | 青山湖科技城 | 4.59 | 16.76 | |||
Nanfeng | 南峰 | 5.37 | 22.13 | Yuhang | ||
Nanhu | 南湖 | 2.08 | 24.21 | |||
Zhongtai | 中泰 | 3.06 | 27.27 | |||
Yuhang Road | 禹航路 | 2.62 | 29.89 | |||
Fengxin Road | 凤新路 | 2.17 | 32.06 | |||
Lvting Road | 绿汀路 | 3 5 | 2.35 | 34.41 | ||
Rolling stock
Stock | Class | Year built | Builder | Number built | Numbers | Formation | Depots | Line assigned | Notes |
---|---|---|---|---|---|---|---|---|---|
PM170 | B | 2019-2020 | CRRC Nanjing Puzhen | 84 (21 sets) | 16 001 - 16 021 (160011-160214) | TMc+Mp+Mp+TMc | Shangquan Depot | 16 |
See also
References
- ^ a b "杭州地铁16号线开通在即 余杭到临安不到38分钟". 2020-04-09.
- ^ "Fastest Hangzhou metro line enters into operation thanks to TST, Thales JV in China | Thales Group". 10 June 2020.
- ^ "官宣:杭临线正式更名为16号线!已经全线"洞通"!". 2019-09-16.
- ^ "杭州城际铁路临安线开工 未来杭州市区至临安1小时". 2016-01-04.
- ^ "杭州地铁16号线长啥样有多快?记者带你提前探营". 浙江新闻. 2020-04-10. Archived from the original on 2020-10-30. Retrieved 2020-04-10.
- ^ "从城西绿汀路站到临安 只要38分钟 杭州地铁16号线即将开通". 都市快报. 2020-04-10. Archived from the original on 2020-10-30. Retrieved 2020-04-10.
- ^ "杭州至临安城际铁路工程环境影响报告书" (PDF). Archived from the original (PDF) on 2016-03-03. Retrieved 2021-09-18.
You must be logged in to post a comment.