The Baotou–Yinchuan high-speed railway is a high-speed railway in China. It will be 420.2 kilometres (261.1 mi) long and has a design speed of 250 kilometres per hour (160 mph). A branch from Yinchuan to Alxa Left Banner will be 111.1 kilometres (69.0 mi) long and has a design speed of 200 kilometres per hour (120 mph).[1]
History
On 16 August 2018, construction began on the section from Yinchuan to Huinong South.[2] On 17 May 2022, construction of the remaining section between Huinong South and Yinchuan began.[3]
On 17 July 2024, non-revenue service trains started running on the section between Yinchuan and Huinong South.[4]
Route
The railway roughly follows the Baotou–Lanzhou railway.
Stations
- Baotou
- Baiyanhua West
- Urat Front Banner West
- Wuyuan East
- Linhe West
- Dengkou West
- Jiangui East
- Wuhai Haibowan
- Wuhai South
- Huinong South
- Shuizuishan
- Shahu
- Yinchuan
Bayanhaote branch:
See also
References
- ^ "包银高铁最新进展!将新建10个高铁站". hhht.news.163.com. 2020-09-07. Retrieved 2020-12-30.
- ^ "包银高铁宁夏段正式开工建设_滚动新闻_中国政府网". www.gov.cn. Retrieved 2020-12-30.
- ^ "包银高铁——吹响西北发展冲锋号". 高铁网. 2022-05-26. Retrieved 2022-05-26.
- ^ "包银高铁惠银段首趟动车组列车"上线"-新华网". www.xinhuanet.com. Retrieved 2024-08-09.
You must be logged in to post a comment.