Rudbar Lorestan Dam (Persian: سد رودبار لرستان) is a hydroelectric dam on the Rudbar River, a tributary of the Dez River, in Iran's Lorestan Province with an installed electricity generating capability of 450 MW. It was scheduled to become operational in 2013.[2] Finally, the dam was completed on September 15, 2016.[3] The hydroelectric plant consisting of two 225-MW vertical Francis turbine-generator units has begun operating on May 31, 2017.[4]

See also

References


No tags for this post.