

Nordsee-Ost offshore wind farm is an offshore wind farm in operation in the eastern part of the North Sea German sector. The project was developed by RWE Innogy, a subsidiary of RWE.
The wind farm consists of 48 turbines with a total capacity of 295 MW. The 6.15 MW turbines were provided by REpower.[2] Steel foundations for generators were supplied by Aker Verdal.[3][4] Power converters were supplied by Woodward Governor Company.[5] A consortium of Siemens and Prysmian built the high-voltage direct current submarine cable from the wind farm to the German transmission system operated by Transpower, a subsidiary of TenneT.[6]
Delays in power line construction by Dutch TenneT delayed its operational start.[7]
On 11 May 2015 the wind farm was officially put into operation.[8]
See also
References
- ^ a b c d "Nordsee Ost Offshore Wind Farm". 4coffshore.com. Retrieved 2017-03-05.
- ^ Backwell, Ben (2010-02-01). "REpower to supply 295MW of turbines for RWE's Nordsee Ost". ReCharge. NHST Media Group. Retrieved 2010-07-17.
- ^ "Aker wins deal at Nordsee Ost". ReCharge. NHST Media Group. 2010-06-17. Retrieved 2010-07-17.
- ^ "Aker Verdal wins wind project in Germany" (Press release). Aker Solutions. 2010-06-17. Retrieved 2010-07-17.
- ^ "Woodward power converters chosen for Nordsee Ost". ReCharge. NHST Media Group. 2010-04-15. Retrieved 2010-07-17.
- ^ Backwell, Ben (2010-07-16). "Siemens and Prysmian win €500m Nordsee-Ost wind farm contract". ReCharge. NHST Media Group. Archived from the original on 2012-02-24. Retrieved 2017-03-05.
- ^ David Crossland (6 March 2012). "German wind energy plans in the doldrums". thenational.ae. Retrieved 24 June 2015.
- ^ "G7-Energieministertreffen in Hamburg". Bundesministerium für Wirtschaft und Energie. 2015-05-11.
You must be logged in to post a comment.