Doddakallasandra is an elevated metro station on the North-South corridor of the Green Line of Namma Metro in Bengaluru, India.[2] This station was opened on 21 January 2021 to the public. The station was inaugurated along with five other stations, as a part of the Green Line extension.[3][4]

Station layout

Doddakallasandra track layout
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Silk Institute
Next Station: Vajarahalli
Platform 1
Northbound
Towards ← Madavara
Next Station: Konanakunte Cross
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits

There are 2 Entry/Exit points – A and B. Commuters can use either of the points for their travel.

  • Entry/Exit point A: Towards Doddakallasandra side
  • Entry/Exit point B: Towards Mantri Arena Mall side

See also

References

No tags for this post.