The Fall River/New Bedford Line (formerly the Middleborough/Lakeville Line) is a commuter rail line of the MBTA Commuter Rail system in southeastern Massachusetts, United States. It runs south from Boston to Taunton, where it splits into branches to Fall River and New Bedford. There are 10 intermediate stations on the combined section and one on each branch.
Most of the line originated as the Fall River Railroad, which opened in segments between Fall River and South Braintree via Middleborough in 1845 and 1846. At South Braintree, it met the Old Colony Railroad, which provided a connection to Boston. The two railroads merged in 1854 to form the Old Colony and Fall River Railroad. While the Dighton and Somerset Railroad largely replaced the line as a Boston–Fall River route in 1866, it remained busy with commuter and Boston–Cape Cod traffic. Mergers brought it under the Old Colony Railroad in 1872 and the New York, New Haven and Hartford Railroad in 1893.
Commuter service peaked in the early 20th century and began to decline in the 1910s. Service on the Fall River–Middleborough segment ended in 1931. After two decades of attempts to end Old Colony Division service, the New Haven terminated it in 1959. Planning for the Massachusetts Bay Transportation Authority to restore service on the Middleborough line began in the 1970s. Construction began in 1993 and service on the Middleborough/Lakeville Line began in 1997. Seasonal CapeFlyer excursion service began using the line in 2013. The line was extended and renamed in 2025 as part of the first phase of the South Coast Rail project. An extension from Middleborough to Buzzards Bay or Bourne is proposed.
Operation

The northern portion of the line follows the Middleborough Main Line, which runs approximately north–south from Boston to Middleborough. The northernmost section from South Station through Boston, Quincy, and Braintree is shared with the Kingston Line and Greenbush Line.[2]: 47 The line continues south through Randolph, Holbrook, Avon, Brockton, West Bridgewater, East Bridgewater, and Bridgewater. Intermediate stations are served at JFK/UMass, Quincy Center, Braintree, Holbrook/Randolph, Montello, Brockton, Campello, and Bridgewater.[2]: 3
In downtown Middleborough, it turns west at Pilgrim Junction just north of Middleborough station. It follows the Middleboro Secondary west to Cotley Junction in southern Taunton, then the New Bedford Main Line southeast to Myricks via East Taunton station. From Myricks, the New Bedford Branch follows the New Bedford Main Line to New Bedford station via Church Street station, while the Fall River Branch follows the Fall River Secondary to Fall River station via Freetown station.[2]: 48
Like the rest of the MBTA Commuter Rail system, the line operates using push-pull trains with diesel locomotives. Maximum speeds are 79 miles per hour (127 km/h) south of Braintree and 59 miles per hour (95 km/h) to the north.[3]: 12 [2]: 53 The line is mostly single track with passing sidings; there is some double track in Boston, Quincy, Braintree, and Brockton, and between Cotley Junction and Myricks Junction.[3]: 11 [2]: 52 Layover yards for the line are located in Fall River and New Bedford, plus an older yard in Middleborough.[2]: 7, 47 All stations are accessible with full-length high-level platforms.[3]: 10 [2]: 56–58
As of March 2025, the portion between East Taunton and Boston has 16 round trips on weekdays and 13 on weekends. These trips are split approximately equally between the Fall River and New Bedford branches. On weekdays, most Boston trains have a shuttle train serving the other branch, with a cross-platform transfer at East Taunton. Typical running times for through trains are 92 to 98 minutes.[4] The CapeFlyer operates one daily round trip between Boston and Hyannis on Friday evenings, Saturdays, and Sundays during the summer tourist season (typically Memorial Day weekend in late May to Labor Day weekend in early September). It uses the portion of the line north of Middleborough with stops at Braintree and Brockton.[5]
History
Previous service
Old Colony Railroad

The Fall River Railroad was formed in March 1845[a] as the merger of three smaller railroads. It opened in phases from June 9, 1845 to December 21, 1846, forming a line between Fall River and South Braintree via Middleborough.[8][9] At South Braintree, it connected with the Old Colony Railroad, which had opened between Boston and Plymouth on November 10, 1845.[10]: 95 In 1847, the railroad opened a short extension to Fall River Wharf and began Fall River Line rail–steamboat service between Boston and New York.[6]: 403 The Cape Cod Railroad opened from Middleborough to Sandwich on Cape Cod in 1848, and to Hyannis in 1854.[6]: 411 The Old Colony and the Fall River merged in 1854 to form the Old Colony and Fall River Railroad. Schedules permitted commuting to Boston from as far south as Bridgewater from then onwards. North Bridgewater (later renamed Brockton) was a turnback point for short turn trains in the late 1850s and early 1860s.[10]: 95
The Dighton and Somerset Railroad, owned by the Old Colony and Newport (1863 successor to the Old Colony and Fall River), opened in September 1866. It connected to the Fall River Railroad line at Braintree Highlands and Somerset Junction, providing a shorter Boston–Fall River route that also served Taunton. The Dighton and Somerset became the railroad's primary Boston–Fall River route, but the older route remained busy with Cape Cod traffic.[6]: 393, 403 The Old Colony and Newport Railroad and the Cape Cod Railroad merged in 1872 to form the Old Colony Railroad. Campello in southern Brockton was a turnback point from the early 1870s on.[10]: 95
Continued traffic growth led the Old Colony to double-track several of their main lines in the 1880s and 1890s.[10]: 95 [b] Double track was extended south from South Braintree to Randolph in 1882, to Campello in 1883, to Bridgewater in 1884, and Middleborough in 1885.[11] Schedules were consistently suitable for commuting from Middleborough after the mid-1880s.[10]: 95 The West Bridgewater Branch, which connected the line with the Dighton and Somerset, was completed in 1888.[6]: 405 Double track was completed from Middleborough to Buzzards Bay in 1893.[12] Schedules permitted commuting from Cape Cod beginning in 1894.[10]: 95
New Haven Railroad
The New York, New Haven and Hartford Railroad leased the Old Colony in 1893.[6]: 393 A construction project lasting from 1894 to 1897 elevated the tracks through downtown Brockton to eliminate grade crossings.[13][14] Service on the Middleborough line was at its peak from about 1898 to 1914. In 1898, daily inbound service to Boston included six trains from Cape Cod, three from Fall River, six from Middleborough, seven from Campello, and one from Stoughton via the West Bridgewater Branch. There were also three trains from Montello to Boston that operated south from Montello through Brockton then used branchlines to reach Boston.[10]: 34, 96 [c] Numerous trains from the Old Colony Division's many branches used the mainline north of Braintree; many of them split and merged at Braintree.[10]: 96
The middle section of the original Fall River Railroad, between Middleborough and Myricks lost importance after the turn of the century, though commuter service from Fall River was available for several years beginning in 1915.[10]: 95 [6]: 403 Service levels began to decline during World War I when freight was given priority, and continued to decline thereafter. Commuter-suitable service was not always available from Cape Cod after 1919.[10]: 95–96 By 1924, inbound service included five trains from Cape Cod, one from Fall River, five from Middleborough, three from Bridgewater, eight from Campello, and one from North Easton via the West Bridgewater Branch (on which service ended in 1925).[15][10]: 96 Fall River service via Middleborough ended in 1931.[10]: 96
Abandonment

The New Haven Railroad declared bankruptcy in 1935, setting off a 12-year-long reorganization process. The Old Colony lease was a major liability to the New Haven. It ended the lease in 1936 but was forced to continue operating the division.[16]: 499 [17]: 12 In the 88 stations case, the New Haven controversially closed 88 stations in Massachusetts on July 17, 1938.[17]: 13 [18] Three were on the Middleboro line and three more between Middleboro and the Cape Cod Canal.[d] In May 1939, the company proposed to abandon of all passenger service in the "Boston Group" – the primary group of lines into Boston, including the Greenbush, Plymouth, and Middleborough lines and the shared mainline north of Braintree.[16]: 501 [17]: 15 A revised proposal that September was to keep Boston–Braintree service plus limited commute-hour service as far as Campello, Whitman, and Hingham.[20][17]: 16
After further controversy, a compromise schedule took effect on March 31, 1940, with service cut nearly in half but no lines abandoned.[21][17]: 21 This schedule only required use of a single track and passing sidings south of Bridgewater; the second track between Bridgewater and Buzzards Bay was removed over the following two years.[17]: 22 On February 18, 1941, the Interstate Commerce Commission refused abandonment of the Boston Group, forcing the New Haven to continue operations on the Old Colony.[22] Additional traffic during World War II temporarily boosted the railroad's fortunes, but the postwar years again saw mounting deficits on the Old Colony Division. Sharp cuts in March 1949 removed most off-peak service; the Middleboro line was left with two inbound trains from Cape Cod and three from Middleborough.[10]: 13, 96 [23]: 17
Under the 1951–1954 presidency of Frederic C. Dumaine Jr., the New Haven increased passenger service, using new Budd Rail Diesel Cars to reduce costs.[10]: 13 [24]: 10 By April 1954, there were three daily inbound trains from Cape Cod, four from Middleborough, and six from Brockton.[10]: 96 However, Patrick B. McGinnis taking the railroad's presidency in 1954 resulted in deferred maintenance and cancelled plans for further service expansion.[24]: 12 The New Haven again proposed to abandon all Old Colony service. A temporary state subsidy was introduced in 1958 to continue Greenbush, Plymouth, Middleborough, and Cape Cod service for an additional year while the Southeast Expressway and other highways were under construction.[24]: 23 The final day of service was June 30, 1959, as the subsidy expired. Bus companies including the Eastern Massachusetts Street Railway and Plymouth and Brockton Street Railway expanded their South Shore commuter service.[25][24]: 26
1960s and 1970s

In early 1960, state and Cape Cod officials reached an agreement with the New Haven to operate Boston–Cape Cod and New York–Cape Cod service during the busy summer tourist season.[24]: 26 The New York trains, the Day Cape Codder and Neptune, operated as planned.[26] However, the wooden trestles of the drawbridge carrying the Old Colony main line over the Neponset River between Boston and Quincy burned on the night of July 22–23, 1960.[27] The New Haven collected insurance money but refused to rebuild the bridge, instead rerouting freight trains via Middleborough.[24]: 26 [28]: 19 For passengers, connections were provided between Shore Line trains and New York–Cape Cod trains at Attleboro. For the 1961 season, Boston–Cape Cod service ran via Stoughton.[24]: 26 The New York trains ran until 1964.[26] Freight service continued to use the Middleboro line.[6]: 404
The Massachusetts Bay Transportation Authority (MBTA) was formed in August 1964 as an expansion of the urban Metropolitan Transit Authority into the surrounding suburbs. The MBTA was intended to subsidize commuter rail service – and to replace much of it with rapid transit extensions.[10]: 13 The MBTA's first such project was a branch of the Red Line (Cambridge–Dorchester Line) following the Old Colony alignment to Braintree.[e] In November 1965, the MBTA purchased the Old Colony main line between Boston and South Braintree from the New Haven.[31][28]: 22 By 1966, the MBTA expected to eventually extend the line to Braintree Highlands or Holbrook on the Middleboro line, with a spur to Weymouth or Hingham.[28]: 24 The Red Line opened to Quincy Center station in September 1971 and Braintree station in South Braintree in March 1980.[5][24]: 36 Within Boston, a single freight track paralleled the new tracks. Although there was no freight service through Quincy, a single-track right-of-way was reserved for future freight use when the extension was built.[24]: 36 [28]: i, 1, 4
The New Haven Railroad merged into Penn Central at the end of 1968.[10]: 15 In 1970, following revolts against freeways in the urban core, Massachusetts governor Francis Sargent placed a moratorium on new highway construction inside the Route 128 beltway. The resulting cancellation of the Southwest Expressway by the Boston Transportation Planning Review meant the already-overcrowded Southeast Expressway would continue to be the only highway into Boston from the south.[24]: 36 [10]: 16 In January 1973, the MBTA acquired most of Penn Central's suburban lines around Boston, including the Middleboro line as far south as Campello.[32][33][34]
Restoration
A 1974 state report evaluated potential service as far as Hyannis and Falmouth on Cape Cod. It estimated construction costs of $13.6 million to $23 million (equivalent to $65–111 million in 2023), plus $9.2 million ($44 million) for purchasing the tracks and $2.5 to $6.8 million ($12–33 million) for equipment.[35] On October 15, 1979, a special train ran from Braintree to Middleborough to publicize the state's plans for restored service.[36] In 1984, a state-directed MBTA study found that restoration of commuter rail service on the former Old Colony lines would be feasible.[37]: 4 During the summers of 1984 to 1988, the Cape Cod and Hyannis Railroad operated passenger service between Braintree station and Cape Cod. Intended partially as a precursor to full commuter rail service, it made five intermediate stops (Holbrook, Brockton, Bridgewater, Middleborough, and Wareham) between Braintree and Buzzards Bay.[38][39][40]
A Draft Environmental Impact Statement (DEIS) for restoration of service on the Middleborough, Plymouth, and Greenbush lines was released in May 1990.[41] In 1991, the state agreed to build a set of transit projects as part of the settlement of a lawsuit by the Conservation Law Foundation (CLF) over auto emissions from the Central Artery/Tunnel Project (Big Dig). Among these projects was the "Old Colony Commuter Rail Line Extension", to be complete by the end of 1996.[42] The Final Environmental Impact Statement for the Middleborough and Plymouth lines – often called the "Old Colony Lines" – was released in 1992.[43][f] Two station sites considered in the DEIS – Westdale in West Bridgewater and Middleborough/Route 44 in northern Middleborough – were dropped from consideration.[37]: 4
Construction of the $560 million project began in 1993, with service then expected to begin in late 1996.[44] Which stations to include on the shared mainline between Braintree and Boston proved controversial. Original plans called only for a stop at Braintree.[37]: 8 In September 1995, state governor Bill Weld announced that a platform would be built at Quincy Center instead.[45] Later that year, the MBTA agreed to build both stations.[46] In November 1996, the MBTA agreed to add a stop at JFK/UMass station as well.[47] Limited weekday service with four daily round trips each on the Middleborough/Lakeville Line and Plymouth/Kingston line began on September 29, 1997.[48][49] Full service began on November 30, 1997. The Middleborough/Lakeville Line had twelve round trips on weekdays and seven on weekends.[50][51] Weekend and some weekday trains began stopping at JFK/UMass on April 30, 2001.[5][47]
Service since 1997

In 2007, concrete ties used on the Old Colony Lines began to fail due to manufacturing errors. The rate of failures increased during the following two winters, affecting service and causing speed restrictions.[52] In 2010, the MBTA began a project to replace the 150,000 failing ties, which were part of a batch of 600,000 made in the 1990s, with wooden ties.[g] Some replacement work in Bridgewater and Middleborough took place in 2010.[53] Midday service on the Middleborough/Lakeville Line was replaced by buses from March 14 to June 6, 2011.[54][55] Weekend service on the line was replaced from March 26 to December 18, 2011, and March 17 to April 22, 2012.[56][54] The project was completed in May 2012 at a cost of $91.5 million.[57][58]
On May 24, 2013, the MBTA began operating CapeFlyer service between Boston and Hyannis over the Middleborough Main Line and Cape Main Line. Service consisted of one daily round trip on Friday evenings, Saturdays, and Sundays during the summer tourist season.[59][h] In 2013 and 2014, the Friday evening southbound train operated as an extension of a regular Middleborough/Lakeville Line train, while Saturday and Sunday service operated with a separate trainset. In 2015, Friday CapeFlyer service also began using a separate trainset.[59][61]
Substantially reduced schedules were in effect on the Commuter Rail system from March 16 to June 23, 2020, due to the COVID-19 pandemic.[5] Schedule changes effective November 2, 2020, added midday service with consistent 60–70 minute midday headways on the Middleborough/Lakeville Line, though a pilot of late-night service was discontinued.[62] Temporary reduced schedules were again put into place from December 14, 2020, to April 5, 2021.[63][64] By October 2022, Middleborough/Lakeville service was at 77% of pre-COVID ridership.[1]
South Coast Rail

In the 1980s — during the first expansion of commuter rail service in Massachusetts in decades — the restoration of service to New Bedford and Fall River (South Coast Rail) was proposed. Three routes were considered, including the Middleborough Main Line and Middleborough Secondary. By 1988, the MBTA was tentatively planning to use a route via Stoughton.[65] A 1995 feasibility study found that the limited capacity of the single track between Boston and Braintree could only support service to Fall River or New Bedford, but not both.[66] Planning for the Stoughton route continued until it was suspended in 2003.[67] Planning restarted several years later. The 2009 alternatives analysis report, 2011 draft environmental impact statement, and 2013 final environmental impact statement all chose the Stoughton route.[68][69][70]
In June 2016, the MBTA announced that the project cost had been revised to $3.42 billion, with completion not expected until 2030. The substantial delay and increase in cost caused officials to consider alternate plans, including an interim service to New Bedford via Middleborough. Some local and regional officials objected to that plan, as it would have reduced service to Middleborough/Lakeville station and potentially interfere with Plymouth/Kingston Line and Greenbush Line service.[71][72] In March 2017, the state announced a revised plan intended to provide service sooner for a total cost of $3.42 billion. The $1.1 billion Phase 1 would follow the Middleborough route and open in 2024 with service to both Fall River and New Bedford. Phase 2 would follow the Stoughton route (including electrification) and open in 2029.[73] Middleborough and Lakeville officials were critical of the possibility of abandoning Middleborough/Lakeville station — which had attracted transit-oriented development — or requiring its riders to take a shuttle train.[74]
By June 2017, the Phase 1 completion date was moved to 2022.[75] The draft supplemental environmental impact report was issued in January 2018. It analyzed three options for Middleborough: a reverse move to serve the existing station, a new Middleborough station with a rail shuttle between the existing station and Bridgewater, and a new Middleborough station with a bus shuttle from the developments at the existing station site. The third option was chosen for higher operational flexibility, lower travel times, and avoiding the need to add double track between Middleborough and Bridgewater.[2]: 19
The two main construction contracts for the project were awarded in May and August 2020. By then, service was expected to begin in late 2023.[76][77] Overall project completion reached the halfway point in mid-2022.[78] In September 2023, the MBTA indicated that revenue service would not begin until mid-2024.[79] In April 2024, the MBTA acknowledged that a midyear opening was unlikely, but did not provide a new schedule.[80][81] In June 2024, the MBTA announced that the planned opening had been delayed again to May 2025.[82][83] Service began on March 24, 2025. The line was renamed as the Fall River/New Bedford Line at that time.[84][85] Service on the main portion of the line increased from 14 round trips on weekdays to 16, and from 10 round trips on weekends to 13.[4][86]
Cape Cod service proposals

In 2007, the Boston Region Metropolitan Planning Organization released a feasibility study of extending commuter rail service to Buzzards Bay, a portion of Bourne on the north side of the Cape Cod Canal. Intermediate stops were to be at Rock Village in southern Middleborough, County Road on the Rochester/Wareham border, and downtown Wareham.[87] The introduction of the CapeFLYER brought new attention to the possibility of extending the Middleborough/Lakeville Line to Buzzards Bay.[88] Later in 2013, the Wareham Chamber of Commerce and Buzzards Bay town selectmen both indicated support for Buzzards Bay commuter rail based on the success of the CapeFLYER, the Chamber supported the extension of commuter rail service to Buzzards Bay station.[89][90]
MassDOT and the Cape Cod Commission both studied the potential service in 2014–15. The studies estimated daily ridership of 800 to 875 if all Middleborough/Lakeville trains were extended to Buzzards Bay without intermediate stops.[91] Bourne voted to join the MBTA district in 2015 and began paying an assessment in mid-2016, although there was no guarantee that commuter rail service would be provided.[92] MassDOT began planning a possible trial service in October 2015. The service was to have shuttle trains between Bourne and Middleborough/Lakeville operated by Massachusetts Coastal Railroad.[93] The MBTA Fiscal Management and Control Board rejected the service proposal in April 2016.[94]
During the South Coast Rail project, Middleborough station was designed with space for a shuttle platform to be added later.[2]: 38 In 2021, MassDOT released a feasibility study of Cape Cod commuter rail service. Middleborough–Buzzards Bay shuttle service with seven daily round trips was expected to have 1,710 total daily boardings, while Middleborough–Bourne service with ten daily round trips (including two off-peak Boston round trips) was expected to have 2,540 total daily boardings. Service to Hyannis was not evaluated because the Bourne–Hyannis segment would require significant track and signal improvements to be suitable for commuter service.[95]
Stations
Fare zone | Location | Miles (km)[96] | Station | Connections and notes |
---|---|---|---|---|
1A | Boston | 0.0 (0.0) | ![]() |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
2.3 (3.7) | ![]() |
![]() ![]() ![]() ![]() ![]() | ||
1 | Quincy | 7.9 (12.7) | ![]() |
![]() ![]() ![]() ![]() |
2 | Braintree | 10.9 (17.5) | ![]() |
![]() ![]() ![]() ![]() |
3 | Randolph | 15.0 (24.1) | ![]() |
![]() |
4 | Brockton | 18.6 (29.9) | ![]() |
![]() ![]() |
20.0 (32.2) | ![]() |
![]() ![]() | ||
5 | 21.9 (35.2) | ![]() |
![]() | |
6 | Bridgewater | 27.7 (44.6) | ![]() |
|
8 | Lakeville | 35.6 (57.3) | ![]() |
Station closed for commuter rail service on March 24, 2025; still used for seasonal CapeFlyer service |
8 | Middleborough | 34.5 (55.5) | ![]() |
![]() |
Taunton | 42.8 (68.9) | ![]() |
![]() | |
Fall River Branch | ||||
8 | Freetown | 51.2 (82.4) | ![]() |
![]() |
Fall River | 56.6 (91.1) | ![]() |
![]() | |
New Bedford Branch | ||||
8 | New Bedford | 57.4 (92.4) | ![]() |
![]() |
60.0 (96.6) | ![]() |
![]() | ||
Closed stations |
Notes
- ^ Until August 1846, its name was the United Corporation of the Middleborough Railroad Corporation with the Fall River Branch Railroad Company and the Randolph and Bridgewater Railroad Corporation.[6]: 403 [7]
- ^ The Boston–Braintree main line was double-tracked in 1848; the northern portion was quadruple-tracked in the early 20th century.[10]: 95
- ^ Two trains used the West Bridgewater Branch and Stoughton Branch; one used the Bridgewater Branch and the Plymouth main line. Six additional trains operated from Bridgewater to Boston using the Bridgewater Branch.[10]: 34, 96
- ^ Those on the Middleboro line were Matfield, Westdale, and Stanley – all between Brockton and Middleboro. Rock, South Middleboro, and Tremont were all between Middleboro and Wareham.[19][17]: 19
- ^ Part of the Cambridge–Dorchester Line had previously been constructed along a section of the main line plus the Shawmut Branch in the 1920s.[10]: 96 A rapid transit extension to Braintree had been proposed by regional plans in 1926 and 1945.[29][30] That plan was overwhelmingly rejected by Quincy and Braintree voters in 1948.[23]: 10–12 Not until Old Colony service ended did the plan gain traction.[24]: 29 [28]: 1
- ^ Unlike the other two lines, the Greenbush Line involved reactivation of abandoned right-of-way, and it proved more controversial. The MBTA moved forward with the Middleborough and Plymouth lines; after significant controversy, the Greenbush Line ultimately opened in 2007.[37]: 5 [24]: 37 [5]
- ^ Amtrak and the Long Island Rail Road also had to replace large numbers of ties from that batch.[53]
- ^ For the 2013 season, the service ran until Columbus Day weekend in mid-October.[60]
References
- ^ a b Poftak, Steve (October 27, 2022). "GM Report" (PDF). Massachusetts Bay Transportation Authority. p. 6.
- ^ a b c d e f g h i VHB/HNTB (January 31, 2018). "Chapter 2 – Alternatives Analysis". South Coast Rail Draft Supplemental Environmental Impact Report. Massachusetts Department of Transportation.
- ^ a b c Modernizing the Old Colony Lines (PDF) (Report). TransitMatters. May 2021.
- ^ a b "Fall River / New Bedford Line Spring/Summer Schedule" (PDF). Massachusetts Bay Transportation Authority. March 24, 2025.
- ^ a b c d e Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
- ^ a b c d e f g h Karr, Ronald Dale (2017). The Rail Lines of Southern New England (2 ed.). Branch Line Press. ISBN 9780942147124.
- ^ "Chapter 259: An Act to change the Name of the United Corporation of the Middleborough Rail-road Corporation with the Fall River Branch Rail-road Company, and the Randolph and Bridgewater Rail-road Corporation, and for other purposes.". Acts and Resolves Passed by the General Court of Massachusetts, 1846, 1847, 1848. Massachusetts General Court. 1848. pp. 190–191.
- ^ Report of the Board of Railroad Commissioners, the Tax Commissioner and the Bank Commissioner, sitting as a commission, relative to the assets and liabilities of the New York, New Haven & Hartford Railroad Company. Massachusetts Joint Commission on the New York, New Haven & Hartford Railroad Company. February 15, 1911. pp. 408–409.
- ^
- "Fall River Railroad". The Brooklyn Daily Eagle. June 5, 1845. p. 2 – via Newspapers.com.
- "Rail Road". Fall River Monitor. December 26, 1846. p. 2 – via Newspapers.com.
- Fall River Railroad (December 24, 1846). "New Notice". Herald of the Times. p. 3 – via Newspapers.com.
- ^ a b c d e f g h i j k l m n o p q r s t u Humphrey, Thomas J.; Clark, Norton D. (1985). Boston's Commuter Rail: The First 150 Years. Boston Street Railway Association.
- ^
- Nineteenth Annual Report of the Old Colony Railroad Co. to the Stockholders. Old Colony Railroad Company. November 1882. p. 7.
- Twentieth Annual Report of the Old Colony Railroad Co. to the Stockholders. Old Colony Railroad Company. November 1883. p. 9.
- Twenty-First Annual Report of the Old Colony Railroad Co. to the Stockholders. Old Colony Railroad Company. November 1884. p. 8.
- Twenty-Second Annual Report of the Old Colony Railroad Co. to the Stockholders. Old Colony Railroad Company. November 1885. p. 8.
- ^
- Twenty-Ninth Annual Report of the Old Colony Railroad Co. to the Stockholders. Old Colony Railroad Company. September 1892. p. 8.
- Thirtieth Annual Report of the Old Colony Railroad Co. to the Stockholders. Old Colony Railroad Company. September 1893. p. 8.
- ^ Snow, F. Herbert; Rollins, James W. Jr. (1895). "III. Abolition of Grade Crossings in the City of Brockton". Journal of the Association of Engineering Societies. Vol. 14. pp. 435–446.
- ^ "Track Elevation at Brockton, Mass.: N.Y., N.H. & H. R.R." Engineering News and American Railway Journal. Vol. 37, no. 12. March 25, 1897. pp. 178–179 – via Google Books.
- ^ Time Tables East of New London and Willimantic. New York, New Haven and Hartford Railroad. September 28, 1924. pp. 20–22.
- ^ a b Rood, Armistead B. (1940). "Protecting the User Interest in Railroad Reorganization". Law and Contemporary Problems. 7 (3). Duke University School of Law: 495–508. doi:10.2307/1189708. JSTOR 1189708.
- ^ a b c d e f g Reidy, Bill (1996). "Old Colony Commuter Service: The New Haven's Problem Child". Shoreliner. Vol. 27, no. 1. New Haven Railroad Historical and Technical Association. pp. 6–35. LCCN 78-16543.
- ^ "New Haven Announces Changes in Timetables". Boston Globe. July 13, 1938. pp. 1, 2 – via Newspapers.com. (part 2, part 3)
- ^ "Would Close 93 Stations". Boston Globe. June 28, 1938. p. 13 – via Newspapers.com.
- ^ "Hearings Set Next Week on Old Colony Offer". Boston Globe. September 20, 1939. p. 7 – via Newspapers.com.
- ^ "Old Colony Cars Jammed as New Service Starts". Boston Globe. April 1, 1940. p. 12 – via Newspapers.com.
- ^ Special Commission to Investigate Railroad Transportation Facilities within the Commonwealth (December 2, 1942). Report Of The Special Commission To Investigate Railroad Transportation Facilities Within The Commonwealth Under Chapter 43, Resolves Of 1941. Commonwealth of Massachusetts. p. 12.
- ^ a b Reidy, Bill (1996). "Old Colony Commuter Service: The New Haven's Problem Child: Part 2". Shoreliner. Vol. 27, no. 2. New Haven Railroad Historical and Technical Association. pp. 6–29. LCCN 78-16543.
- ^ a b c d e f g h i j k l Reidy, Bill (1996). "Old Colony Commuter Service: The New Haven's Problem Child: Part 3". Shoreliner. Vol. 27, no. 3. New Haven Railroad Historical and Technical Association. pp. 6–39. LCCN 78-16543.
- ^ "Yes, Old Colony's Gone". The Boston Globe. July 1, 1959. pp. 1, 10 – via Newspapers.com.
- ^ a b Lynch, Peter E. (2005). New Haven Railroad Passenger Trains. MBI Publishing Company. pp. 119–122. ISBN 978-0-7603-2288-8.
- ^ "Quincy Blaze Fells Trestle, Blocks Traffic". The Boston Globe. July 23, 1960. p. 43 – via Newspapers.com.
- ^ a b c d e Clarke, Bradley H. (1972). South Shore Quincy-Boston. Boston Street Railway Association. p. 22.
- ^ Report on Improved Transportation Facilities in Boston. Division of Metropolitan Planning. December 1926. hdl:2027/mdp.39015049422689.
- ^
- Boston Elevated Railway; Massachusetts Department of Public Utilities (April 1945), Air View: Present Rapid Transit System – Boston Elevated Railway and Proposed Extensions of Rapid Transit into Suburban Boston – via Wikimedia Commons
- Lyons, Louis M. (April 29, 1945). "El on Railroad Lines Unified Transit Plan". Boston Globe. pp. 1, 14 – via Newspapers.com.
- Metropolitan Transit Recess Commission (April 1, 1947). Report of the Metropolitan Transit Recess Commission. Commonwealth of Massachusetts – via Internet Archive.
- ^ Carr, Robert (July 29, 1965). "MBTA Buys Old Colony Line For a South Shore Express". Boston Globe – via Newspapers.com.
- ^ Carr, Robert B. (January 25, 1973). "MBTA gets $19.5m to buy rail lines". The Boston Globe. p. 3 – via Newspapers.com.
- ^ "Certificate" (PDF). Massachusetts Bay Transportation Authority. January 1973.
- ^ Conrail Trackage Rights Agreement (PDF). Massachusetts Bay Transportation Authority. July 1, 1985. p. 2. Archived from the original (PDF) on March 17, 2025.
- ^ Massachusetts General Court Legislative Research Council (1974). Report relative to railroad service from Boston to Brockton and Cape Cod. p. 10 – via Internet Archive.
- ^ Humphrey, Thomas J. & Clark, Norton D. (1986). Boston's Commuter Rail: Second Section. Boston Street Railway Association. p. 25. ISBN 9780938315025.
- ^ a b c d "Executive Summary". Old Colony Railroad Rehabilitation Project from Boston to Lakeville, Plymouth and Scituate, Massachusetts: Final Environmental Impact Statement/Report. United States Department of Transportation Urban Mass Transportation Administration. March 1992 – via Internet Archive.
- ^ Farson, Robert H. (1993). Cape Cod Railroads Including Martha's Vineyard and Nantucket. Cape Cod Historical Publications. pp. 276–277. ISBN 0-9616740-1-6.
- ^ Pillsbury, Fred (June 30, 1984). "Passenger train service to Cape Cod begins anew: Hyannis, Falmouth—All aboard!". The Boston Globe. p. 23 – via Newspapers.com.
- ^ Cape Cod & Hyannis Railroad Spring Schedule, Cape Cod and Hyannis Railroad, May 27, 1988 – via Wikimedia Commons
- ^ Old Colony Railroad Rehabilitation Project from Boston to Lakeville, Plymouth and Scituate, Massachusetts: Draft Environmental Impact Statement/Report. United States Department of Transportation Urban Mass Transportation Administration. May 1990 – via Google Books.
- ^ United States Environmental Protection Agency (October 4, 1994). "Approval and Promulgation of Air Quality Implementation Plans; Massachusetts—Amendment to Massachusetts' SIP (for Ozone and for Carbon Monoxide) for Transit Systems Improvements and High Occupancy Vehicle Facilities in the Metropolitan Boston Air Pollution Control District)". Federal Register. 59 FR 50498.
- ^ Old Colony Railroad Rehabilitation Project from Boston to Lakeville, Plymouth and Scituate, Massachusetts: Final Environmental Impact Statement/Report. United States Department of Transportation Urban Mass Transportation Administration. 1992 – via Google Books.
- ^ Preer, Robert (March 27, 1994). "New routes foretell a new boom". The Boston Globe. p. South 6 – via Newspapers.com.
- ^ "Weld delays train decision". The Boston Globe. September 9, 1995. p. 19 – via Newspapers.com.
- ^ Preer, Robert (December 10, 1995). "Braintree, Quincy look for rail boost". The Boston Globe. pp. South 1, South 4 – via Newspapers.com.
- ^ a b Kahn, Ric (July 1, 2001). "T trains bypass new JFK stop". The Boston Globe City Weekly. pp. 1, 9 – via Newspapers.com. (second page, third page)
- ^ Palmer, Thomas C. Jr. (September 30, 1997). "Old Colony commuter service gets back on track". The Boston Globe. p. 26 – via Newspapers.com.
- ^ "Old Colony begins service". The Boston Globe. September 28, 1997. p. B7 – via Newspapers.com.
- ^ "MBTA will expand Old Colony service". The Boston Globe. AP. November 26, 1997. p. B2 – via Newspapers.com.
- ^ Palmer, Thomas C. Jr. (November 29, 1997). "MBTA ready to expand Old Colony rail service". The Boston Globe. p. B3 – via Newspapers.com.
- ^ "MBTA Old Colony Commuter Rail Tie Replacement Project Overview" (PDF). Massachusetts Bay Transportation Authority. March 2011. Archived from the original (PDF) on May 26, 2012.
- ^ a b Sullivan, Jack (April 9, 2010). "T to spend millions replacing ties". Commonwealth Beacon. Archived from the original on March 11, 2025.
- ^ a b "Old Colony Commuter Rail Tie Replacement Project". Massachusetts Bay Transportation Authority. Archived from the original on June 1, 2011.
- ^ "Old Colony Commuter Rail Tie Replacement Project". Massachusetts Bay Transportation Authority. Archived from the original on July 28, 2011.
- ^
- "Weekend Work along the Middleborough Line Continues" (Press release). Massachusetts Bay Transportation Authority. March 6, 2012.
- "Providence, Greenbush & Old Colony Line schedule changes" (Press release). Massachusetts Bay Transportation Authority. April 13, 2012.
- "Old Colony Commuter Rail Tie Replacement Project". Massachusetts Bay Transportation Authority. Archived from the original on December 21, 2011.
- ^ Sullivan, Jack (April 26, 2010). "T confirms $91m pricetag to fix ties". Commonwealth Beacon. Archived from the original on November 28, 2023.
- ^ "Old Colony Commuter Rail Tie Replacement Project". Massachusetts Bay Transportation Authority. Archived from the original on June 12, 2012.
- ^ a b "Patrick–Murray Administration Announces Return of Rail Service to Cape Cod" (Press release). Massachusetts Bay Transportation Authority. April 2, 2013.
- ^ "Governor Announces Cape Flyer Permanent Seasonal Service" (Press release). Massachusetts Department of Transportation. October 29, 2013. Archived from the original on November 5, 2013.
- ^ "CapeFLYER Service Begins Memorial Day Weekend" (Press release). Massachusetts Bay Transportation Authority. May 13, 2015.
- ^ DiAdamo, Rob (September 14, 2020). "Fall 2020 Commuter Rail Schedule Changes" (PDF). Massachusetts Bay Transportation Authority.
- ^ "Commuter Rail to Temporarily Operate Reduced Service Schedule Starting December 14" (Press release). Massachusetts Bay Transportation Authority. December 10, 2021.
- ^ "Reminder: Spring 2021 Commuter Rail Schedules Take Effect April 5" (Press release). Keolis Commuter Services. April 1, 2021. Archived from the original on June 3, 2021.
- ^ Howe, Peter J. (January 24, 1988). "MBTA plans for big increase in rail service". Boston Globe. p. B1 – via Newspapers.com.
- ^ Massachusetts Bay Transportation Authority (March 1995). "Expanded Feasibility Study: Draft Report" (PDF). New Bedford/Fall River Commuter Rail Project. Archived from the original (PDF) on July 28, 2014.
- ^ Southeastern Massachusetts Metropolitan Planning Organization and Southeastern Regional Planning and Economic Development District (2012). "Commuter Rail" (PDF). 2012 Regional Transportation Plan. Archived from the original (PDF) on November 12, 2011.
- ^ Vanasse Hangen Brustlin, Inc. (September 2009). "Analysis of South Coast Rail Alternatives: Phase 2 Report" (PDF). Massachusetts Executive Office of Transportation and Public Works. Archived from the original (PDF) on August 27, 2011.
- ^ "Draft Environmental Impact Statement/ Draft Environmental Impact Report on the South Coast Rail Project proposed by the Massachusetts Department of Transportation" (PDF). U.S. Army Corps of Engineers New England District. February 2011. Archived from the original (PDF) on October 7, 2011.
- ^ "Final Environmental Impact Statement/ Final Environmental Impact Report on the South Coast Rail Project proposed by the Massachusetts Department of Transportation". U.S. Army Corps of Engineers New England District. August 2013.
- ^ Dungca, Nicole (June 28, 2016). "South Coast rail could cost $1b more than estimated". Boston Globe. pp. A1, A5.
- ^ Lawrence, Mike (October 8, 2016). "Dukakis: 'Stick with Stoughton' for South Coast Rail route". The Enterprise. Archived from the original on January 12, 2017.
- ^ Dungca, Nicole (March 22, 2017). "State changes gears on Middleborough commuter rail plan". Boston Globe. Archived from the original on April 11, 2017.
- ^ Laidler, John (June 16, 2017). "Sharp differences over latest plan for South Coast Rail". Boston Globe. Archived from the original on September 28, 2018.
- ^ "South Coast Rail Corridor Map" (PDF). South Coast Rail - Summer 2017 Fact Sheet. Massachusetts Department of Transportation. Summer 2017. p. 3. Archived from the original (PDF) on September 5, 2017.
- ^ "South Coast Rail Main Line Construction Contract Approved" (Press release). Massachusetts Department of Transportation. May 11, 2020. Archived from the original on May 16, 2020.
- ^ "FMCB Approves $403.5 Million Contract for South Coast Rail Main Line Construction" (Press release). Massachusetts Bay Transportation Authority. August 24, 2020.
- ^ "South Coast Rail Fall River Construction Update" (PDF). Massachusetts Bay Transportation Authority. October 13, 2022.
- ^ Medeiros, Dan (September 29, 2023). "South Coast Rail passenger service is being delayed. Here's why, explained in 60 seconds". The Herald News. Archived from the original on September 30, 2023.
- ^ Berke, Ben (April 11, 2024). "South Coast Rail delayed again, as MBTA parts ways with project's top manager". The Public's Radio. Retrieved May 1, 2024.
- ^ Medeiros, Dan (April 11, 2024). "Summer start to South Coast Rail looks 'unlikely' — but there's one bright spot for riders". The Herald News. Archived from the original on April 11, 2024.
- ^ Medeiros, Dan (June 13, 2024). "'MBTA owes this region an apology': South Coast Rail start is delayed another year". The Herald News. Archived from the original on June 14, 2024.
- ^ "MBTA General Manager Provides Update on Progress of South Coast Rail Project, Milestone Reached with New Testing Phase" (Press release). Massachusetts Bay Transportation Authority. June 14, 2024.
- ^ "MBTA Announces South Coast Rail Service Begins March 24, 2025" (Press release). Massachusetts Bay Transportation Authority. February 7, 2025.
- ^ "Healey-Driscoll Administration, MassDOT, MBTA Celebrate Launch of South Coast Rail" (Press release). Office of Governor Maura Healey and Lt. Governor Kim Driscoll. March 24, 2025.
- ^ "Middleborough / Lakeville Line Fall/Winter Schedule" (PDF). Massachusetts Bay Transportation Authority. November 18, 2024.
- ^ Humphrey, Thomas J. (January 2007). "Buzzards Bay Commuter Rail Extension Feasibility Study" (PDF). Boston Region Metropolitan Planning Organization. Archived from the original (PDF) on March 3, 2016 – via United States Department of Transportation National Transportation Library.
- ^ Kinsella, James (August 16, 2013). "Cape Commuter Rail Is A Real Possibility". Cape News. Archived from the original on August 19, 2013.
- ^ "Chamber: Bring on commuter rail to Wareham, Buzzards Bay". Wicked Local Wareham. September 25, 2013. Archived from the original on March 17, 2014.
- ^ "Commuter rail return to Buzzards Bay: viable, or romantic notion?". Bourne Courier. December 15, 2013. Archived from the original on March 15, 2025.
- ^ "Buzzards Bay Commuter Rail Extension Local Impact Report" (PDF). Cape Cod Commission. April 2015. Archived from the original (PDF) on March 5, 2016.
- ^ Vaccaro, Adam (February 15, 2016). "This Cape Cod town is paying for rail service that doesn't exist". The Boston Globe.
- ^ Rausch, Michael J. (February 26, 2016). "Details Expected Soon About Buzzards Bay Commuter Trains". Cape News. Archived from the original on November 30, 2019.
- ^ Mohl, Bruce (April 4, 2016). "T approves N. Quincy real estate deal". CommonWealth Beacon. Retrieved March 14, 2025.
- ^ VHB (September 2021). Cape Rail Study (PDF) (Report). Massachusetts Department of Transportation. pp. 26, 38.
- ^ "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
External links
Media related to Fall River/New Bedford Line at Wikimedia Commons
You must be logged in to post a comment.