Biocon Hebbagodi (formerly known as Hebbagodi) is an upcoming elevated metro station on the Yellow Line of the Namma Metro serving the Hebbagodi suburban area of Bengaluru.
In 2020, Biocon Group signed an agreement with the Bangalore Metro Rail Corporation Ltd to contribute ₹65 crore towards the construction of the metro station and donated land worth ₹30 crore for the project. Consequently, Biocon obtained the naming rights for the station for 30 years, and the station was renamed from Hebbagodi to Biocon Hebbagodi.[1][2]
This will also be the depot for all the Yellow Line Namma Metro trains for maintenance purposes. As per latest reports, the Yellow Line is slated to be operational around May 2025[3][4] instead of April 2025[5] which was announced by the Karnataka Deputy Chief Minister and Bengaluru Development Minister DK Shivakumar and with four trainsets which will be ready for operations after arriving from Titagarh Rail Systems in Kolkata.
History
In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Biocon Hebbagodi metro station along the 6.418 km Reach 5 – Package 1 section (Bommasandra - Hosa Road) of the 18.825 km Yellow Line of Namma Metro. On 25 March 2017, ITD-ITD Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[6] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.
Station layout
Station Layout (TBC)
Biocon Hebbagodi track layout (TBC) | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms
|
G | Street level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left ![]() | |
Platform 2 Southbound |
Towards → Delta Electronics - Bommasandra | |
Platform 1 Northbound |
Towards ← Rashtreeya Vidyalaya Road Next Station: Huskur Road | |
Side platform | Doors will open on the left ![]() | ||
L2 |
Entry/Exit
See also
References
- ^ "'Biocon Hebbagodi' station name to remain same: BMRCL MD". The New Indian Express. 11 January 2024. Retrieved 2 May 2024.
- ^ "Biocon to fund Hebbagodi metro station". Deccan Herald. Retrieved 2 May 2024.
- ^ "Bengaluru Metro Yellow Line To Become Operational By May 2025, Pink Line To Be Ready For Public Use By..." Times Now. 2025-03-11. Retrieved 2025-03-12.
- ^ "Bengaluru: Namma Metro Yellow Line From RV Road To Bommasandra, Connecting Electronics City, Set To Open By May 2025". English Jagran. 2025-03-10. Retrieved 2025-03-12.
- ^ "Bengaluru Metro plans to open yellow line in April with 4 trains, 30-min headway". Deccan Herald. Retrieved 2025-01-07.
- ^ "ITD-ITD Cem JV Lowest Bidder for B'lore Metro's Bomasandra-HosaRd". The Metro Rail Guy. 2017-03-25. Retrieved 2024-10-23.
You must be logged in to post a comment.