
Line 6 Branch (simplified Chinese: 六号线支线; traditional Chinese: 六號線支線; pinyin: Liùhào Xiàn Zhīxiàn) of Shenzhen Metro, also known as Branch Line 6, is a metro line in Shenzhen. Despite being nominally the branch of Line 6, it is actually a separate line, whose color, train type and train numbers are all different from those of the main line of Line 6.
Sections
Phase 1
Phase 1 of Line 6 Branch has a length of 6.13 km (3.81 mi) with four stations, from SIAT to Guangming. Phase 1 from Shenzhen Institute of Advanced Technology to Guangming opened on 28 November 2022.[1]
Phase 2
Phase 2 has a length of 4.9 km (3.0 mi) with three more stations, from Guangming to Guangmingcheng. Phase 2 from Guangming to Guangmingcheng is expected to be opened in 2025.[2]
Northern extension
A reserved northern extension from SIAT, currently under planning and not submitted to National Development and Reform Commission, will connect Line 6 Branch with Dongguan Rail Transit Line 1.[3][4]
Stations
Station name | Connections | Nearby bus stops | Distance km |
Location | |||
---|---|---|---|---|---|---|---|
English | Chinese | ||||||
SIAT | 深理工 | Dongguan 747(莞747) | Guangming | ||||
Sun Yat-sen University | 中大 | M356 Dongguan 747(莞747) | |||||
Zhenmei | 圳美 | 325 B901 E3 M356 M411 M490 M596 Peak-time 149(高峰149)Dongguan 747(莞747) | |||||
Guangming | 光明 | 6 | |||||
Biyan | 碧眼 | ||||||
Hongqiao Park | 虹桥公园 | ||||||
Guangmingcheng | 光明城 | 13 ![]() |
|||||
References
- ^ a b "车站配置艺术品 每站都是打卡地 地铁6号线支线迎来首批市民试乘,11月28日正式开通". 2022-11-04. Archived from the original on 2022-11-05.
全长约6.13公里,共设4站4区间,分别为光明站、圳美站、中大站和深理工站
- ^ 深圳地铁四期调整路线五个项目开工 预计2025年陆续通车
- ^ 大手笔!明日深圳5条新地铁齐开工,6号线直通中大深圳校区. 中山大学. Archived from the original on 2018-06-21. Retrieved 2018-07-15.
- ^ 黄淳. 深莞惠城际轨道联网指日可待_焦点新闻_深圳新闻网. news.sznews.com. Archived from the original on 2013-12-13. Retrieved 2016-12-11.