Malianwa station
| General information | ||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Location | Yuanmingyuan West Road (圆明园西路) and Malianwa North Road (马连洼北路) Haidian District, Beijing China | |||||||||||||||
| Coordinates | 40°01′57″N 116°16′21″E / 40.032637°N 116.27252°E | |||||||||||||||
| Operated by | Beijing MTR Metro Line 16 Corp., Ltd. | |||||||||||||||
| Lines | ||||||||||||||||
| Platforms | 4 (2 island platforms) | |||||||||||||||
| Tracks | 4 | |||||||||||||||
| Construction | ||||||||||||||||
| Structure type | Underground | |||||||||||||||
| Accessible | Yes | |||||||||||||||
| History | ||||||||||||||||
| Opened | ||||||||||||||||
| Services | ||||||||||||||||
| ||||||||||||||||
| ||||||||||||||||
Malianwa station (simplified Chinese: 马连洼站; traditional Chinese: 馬連窪站; pinyin: Mǎliánwā zhàn) is an interchange station between Line 16 and Line 18 of the Beijing Subway. Line 16 opened at this station on December 31, 2016. Line 18 opened at this station on December 27, 2025, and serves as its western terminus.
Schedule
As of December 2016:[1]
| Destination | First Train | Last Train | ||||
|---|---|---|---|---|---|---|
| Line 16 | ||||||
| to Bei'anhe | 6:02 am | 11:41 pm | ||||
| to Wanpingcheng | 5:34 am | 10:55 pm | ||||
Station features
The station has underground island platforms for both Line 16 and Line 18.
-
Line 16 concourse
-
Line 18 concourse
Exits
There are 4 exits, lettered A, C, E and F. Exits A and F are accessible via elevators.
-
Exit A, Line 16
-
Exit A (elevator exit)
-
Exit C, Line 16
-
Exit E, Line 18
-
Exit F, Line 18
-
Exit F (elevator exit)
Future development
The Line 18 station initially opened on December 27, 2025, as a part of Line 13 split project. In December 2027, the station will be transferred to become part of the new Line 13.[2]
References
- ^ 京港地铁公布地铁16号线北段首末班车时间 (in Chinese). Beijing MTR Corporation Limited. 13 December 2016. Archived from the original on 20 December 2016. Retrieved 20 December 2016.
- ^ "施工中标候选人公示". Beijing Municipal Commission of Housing and Urban-Rural Development. 2021-04-28. Archived from the original on 2021-04-28. Retrieved 2021-05-05.
工程名称:北京轨道交通13号线扩能提升工程土建施工14合同段 建筑规模:1站2区间(13B起点~马连洼站区间、马连洼站、马连洼站~软件园站暗挖区间