Malianwa station

Malianwa

马连洼
Beijing Subway
Line 16 platform

Line 18 platform
General information
LocationYuanmingyuan West Road (圆明园西路) and Malianwa North Road (马连洼北路)
Haidian District, Beijing
China
Coordinates40°01′57″N 116°16′21″E / 40.032637°N 116.27252°E / 40.032637; 116.27252
Operated byBeijing MTR Metro Line 16 Corp., Ltd.
Lines
Platforms4 (2 island platforms)
Tracks4
Construction
Structure typeUnderground
AccessibleYes
History
Opened
  •      Line 16: December 31, 2016; 9 years ago (2016-12-31)
  •      Line 18: December 27, 2025; 2 months ago (2025-12-27)
Services
Preceding station Beijing Subway Following station
Xibeiwang
towards Bei'anhe
Line 16 Nongda Nanlu
towards Wanpingcheng
Terminus Line 18 Shangdi Software Park
Location
Malianwa is located in Beijing
Malianwa
Malianwa
Location in Beijing

Malianwa station (simplified Chinese: 马连洼站; traditional Chinese: 馬連窪站; pinyin: Mǎliánwā zhàn) is an interchange station between Line 16 and Line 18 of the Beijing Subway. Line 16 opened at this station on December 31, 2016. Line 18 opened at this station on December 27, 2025, and serves as its western terminus.

Schedule

As of December 2016:[1]

Destination First Train Last Train
Line 16
to Bei'anhe 6:02 am 11:41 pm
to Wanpingcheng 5:34 am 10:55 pm

Station features

The station has underground island platforms for both Line 16 and Line 18.

Exits

There are 4 exits, lettered A, C, E and F. Exits A and F are accessible via elevators.

Future development

The Line 18 station initially opened on December 27, 2025, as a part of Line 13 split project. In December 2027, the station will be transferred to become part of the new Line 13.[2]

References

  1. ^ 京港地铁公布地铁16号线北段首末班车时间 (in Chinese). Beijing MTR Corporation Limited. 13 December 2016. Archived from the original on 20 December 2016. Retrieved 20 December 2016.
  2. ^ "施工中标候选人公示". Beijing Municipal Commission of Housing and Urban-Rural Development. 2021-04-28. Archived from the original on 2021-04-28. Retrieved 2021-05-05. 工程名称:北京轨道交通13号线扩能提升工程土建施工14合同段 建筑规模:1站2区间(13B起点~马连洼站区间、马连洼站、马连洼站~软件园站暗挖区间