Line 2 (Hangzhou Metro)

Line 2
 2 
A train of Hangzhou Metro Line 2
Overview
StatusOperational
OwnerCity of Hangzhou
LocaleHangzhou, Zhejiang, China
Termini
Stations33
Service
TypeRapid transit
SystemHangzhou Metro
Operator(s)Hangzhou Metro Corporation
Depot(s)Shushan Depot
Shuangqiao Stabling Yard
Rolling stockPM066[1]
PM098
PM134
PM138
Daily ridership747,800 (2020 peak)
History
Opened24 November 2014; 11 years ago (2014-11-24)[2]
Technical
Line length42.85 km (26.63 mi)[3]
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead, 1500 V DC
Operating speed80 km/h (50 mph)
SignallingAnsaldo STS CBTC[4]
Route map

Shushan Depot
1
Chaoyang
2
Caojiaqiao
3
Panshui
4
Renmin Road
5
Hangfachang
6
People's Square
 5 
7
Jiansheyi Road
8
Jianshesan Road
 7 
9
Zhenning Road
10
Feihong Road
11
Yingfeng Road
12
Qianjiang Century City
 6 
Line 4 interconnection
13
Qianjiang Road
 4   9 
14
Qingchun Square
15
Qingling Road
16
North Jianguo Road
 5 
17
North Zhonghe Road
18
Fengqi Road
 1 
19
Wulinmen
 3 
district Gongshu / Xihu
20
Shentangqiao
 19 
21
Xianing Bridge
22
Xueyuan Road
 10 
23
Gucui Road
24
Fengtan Road
25
Wenxin
26
Sanba
 5 
27
Xialongwei
28
Sandun
district
Xihu
Gongshu
29
Dunxiang Street
district
Gongshu
Yuhang
30
Jinjiadu
 4 
31
Baiyang
32
Dufucun
33
Liangzhu
Shuangqiao Stabling Yard

Line 2 of the Hangzhou Metro (Chinese: 杭州地铁二号线; pinyin: Hángzhōu Dìtiě Èr Hào Xiàn) is a north-south rapid transit line, connecting the downtown with the districts of Xiaoshan and Yuhang in Hangzhou.[5][6]

The first phase of the line, between Qianjiang Road and Chaoyang stations, entered operation on 24 November 2014 after six years of construction. It was extended to Gucui Road on 3 July 2017, and then to Liangzhu on 27 December in the same year.[6]

During the day, Automatic Train Operation (ATO) is used on the line, which does not require train operators to control the speed of the train manually, however, every night between the hours of 20:30 and 22:30, operators are required to drive the train manually to ensure they still have the ability to drive the train manually in case of exceptional circumstances when ATO is not functional.[7]

Opening timeline

Segment Commencement Length Station(s) Name
Chaoyang — Qianjiang Road 24 November 2014 18.3 km (11.37 mi) 12 Phase 1 (southeastern section)
Qianjiang Century City 28 April 2016 Infill station 1
Qianjiang Road — Gucui Road 3 July 2017 11.3 km (7.02 mi) 9 Phase 1 (northwestern section)
Gucui Road — Liangzhu 27 December 2017 13.32 km (8.28 mi) 10 Phase 2 & 3
Xianing Bridge 30 June 2020[8] Infill station 1

Stations

Station name Connections Location
English Chinese
Chaoyang 朝阳 Xiaoshan
Caojiaqiao 曹家桥
Panshui 潘水
Renmin Road 人民路
Hangfachang 杭发厂
People's Square 人民广场  5 
Jiansheyi Road 建设一路
Jianshesan Road 建设三路  7 
Zhenning Road 振宁路
Feihong Road 飞虹路
Yingfeng Road 盈丰路
Qianjiang Century City 钱江世纪城  6 
Qianjiang Road 钱江路  4   9  Shangcheng
Qingchun Square 庆春广场
Qingling Road 庆菱路
North Jianguo Road 建国北路  5  Gongshu
North Zhonghe Road 中河北路
Fengqi Road 凤起路  1 
Wulinmen 武林门  3  Gongshu / Xihu
Shentangqiao 沈塘桥  19 
Xianing Bridge 下宁桥 Xihu
Xueyuan Road 学院路  10 
Gucui Road 古翠路
Fengtan Road 丰潭路
Wenxin 文新
Sanba 三坝  5 
Xialongwei 虾龙圩
Sandun 三墩
Dunxiang Street 墩祥街 Gongshu
Jinjiadu 金家渡  4  Yuhang
Baiyang 白洋
Dufucun 杜甫村
Liangzhu 良渚
To scale map of Hangzhou Metro Line 2

Rolling stock

Stock Class Year built Builder Number built Numbers Formation Depots Line assigned Notes
PM066 B 2013-2015 CSR Nanjing Puzhen 162 (27 sets) 02 001 - 02 027 (020011-020276) Tc+Mp+M+M+Mp+Tc Shushan Depot
Shuangqiao Yard
 2 
PM098 2016-2017 CRRC Nanjing Puzhen 102 (17 sets) 02 028 - 02 044 (020281-020446)
PM134 2018 12 (2 sets) 02 045 - 02 046 (020451-020466)
PM138 2019-2020 120 (20 sets) 02 047 - 02 066 (020471-020666)

References