Dahong Men station
Line 8 platform | ||||||||||||||||
| General information | ||||||||||||||||
| Location | Nanyuan Road and Linhong Road (临泓路) Fengtai District, Beijing China | |||||||||||||||
| Coordinates | 39°50′43″N 116°23′57″E / 39.845383°N 116.399154°E | |||||||||||||||
| Operated by | Beijing Mass Transit Railway Operation Corporation Limited | |||||||||||||||
| Lines | Line 8 Line 10 | |||||||||||||||
| Platforms | 4 (2 island platforms) | |||||||||||||||
| Tracks | 4 | |||||||||||||||
| Construction | ||||||||||||||||
| Structure type | Underground | |||||||||||||||
| Accessible | Yes | |||||||||||||||
| History | ||||||||||||||||
| Opened | 30 December 2012 (Line 10) 8 November 2025[1] (Line 8) | |||||||||||||||
| Services | ||||||||||||||||
| ||||||||||||||||
| ||||||||||||||||
Dahong Men station[1] (simplified Chinese: 大红门站; traditional Chinese: 大紅門站; pinyin: Dàhóng Mén zhàn) is an interchange station between Line 8 and Line 10 of the Beijing Subway.[2]
The Line 10 station opened on December 30, 2012.[3]
The Line 8 station opened on November 8, 2025.[1] Only one new exit (Exit E of Line 8) opened, and Exit F of Line 8 will be a reserved exit in long-term plan.
Station layout
The Line 8 and Line 10 stations both have underground island platforms.
Exits
There are 5 exits, lettered A1, A2, C, D and E. Exits A1, C and D are accessible.
Gallery
-
Line 8 concourse
-
Line 8 concourse (alternate view)
-
Line 10 concourse
-
Line 10 platform
History
When the southern section of Line 8 was opened in 2018, this station was unable to open due to obstruction of the demolition of Buildings 1 and 2 of Miaopu Xili (a resident area) within the block where the transfer passageway is located (as there were still 21 households that have not signed a contract for relocation). In July 2021, the demolition of Building 1 of Miaopu Xili began,[4] but the demolished plot was vacant until December 2023.[5] At the start of February 2024, construction of the transfer passageway began.[6][7] Dahong Men station of Line 8 (including Exit E) opened on November 8, 2025.[1]
References
- ^ a b c d e "北京地铁线路图". 北京地铁. Archived from the original on 2025-11-07. Retrieved 2025-11-08.
- ^ 地铁10号线二期I段设计方案敲定 [Metro Line 10 Phase 2 Section I finalizing the design]. Capital Construction News (in Chinese). January 28, 2008. Archived from the original on 2014-11-01.
- ^ 轨道交通四条新线12月30日开通试运营 [Four new rail transit line December 30 opening of trial operation] (in Chinese). Beijing Municipal Transportation Administration Bureau. Archived from the original on May 11, 2013. Retrieved December 29, 2012.
- ^ "打通关键节点,8号线10号线大红门站明年将实现换乘" [Open up key nodes, Line 8 and Line 10 Dahong Men station will be able to transfer next year] (in Simplified Chinese). Beijing Daily. 2021-07-22. Archived from the original on 2024-04-18. Retrieved 2025-02-01.
- ^ "北京丰台缘何屡列"接诉即办"排名榜尾?记者调查→" [Why is Fengtai District in Beijing often ranked last in the “handle complaints immediately” ranking? Reporter’s investigation →] (in Simplified Chinese). China CNR. 2023-12-23. Archived from the original on 2024-04-18. Retrieved 2025-02-01.
- ^ "地铁8号线大红门站换乘通道实现施工进场" [Construction begins on the transfer passage of Metro Line 8 at Dahong Men Station.]. 2024-02-09. Archived from the original on 2024-04-18.
- ^ "8号线大红门站" [Line 8 Dahong Men Station]. 2024-03-08. Archived from the original on 2024-03-13. Retrieved 2024-03-13.