| General information | |
| Status | Under construction |
| Type | Mixed-use |
| Architectural style | Neo-futurism |
| Location | Jeddah, Mecca Province, Saudi Arabia |
| Coordinates | 21°44′02.4″N 39°04′58.5″E / 21.734000°N 39.082917°E |
| Construction started | 1 April 2013 |
| Estimated completion | August 2028 |
| Cost | US$1.2 billion |
| Owner | Kingdom Holding Company |
| Management | CBRE Group |
| Height | |
| Architectural | At least 1,008 m (3,307 ft) |
| Roof | At least 1,008 m (3,307 ft) |
| Top floor | 638 m (2,093 ft) |
| Observatory | 630 and 638 m (2,067 and 2,093 ft) (sky terrace at 630 m (2,067 ft)) |
| Technical details | |
| Structural system | Reinforced concrete and steel, all-glass facade |
| Floor count | 167 floors; 252 levels |
| Floor area | 243,866 m2 (2,624,950 sq ft) |
| Lifts/elevators | 57 (50 single-decked, 7 double-decked) made by Kone[3] + 1 workmen's lift |
| Design and construction | |
| Architect | Adrian Smith |
| Architecture firm | Adrian Smith + Gordon Gill Architecture |
| Developer | Jeddah Economic Company[5] |
| Engineer | Langan International (sub-grade and transportation planning)[4] |
| Structural engineer | Thornton Tomasetti |
| Main contractor | Saudi Binladin Group |
| References | |
| [1][2] | |
Jeddah Tower[a] is a megatall skyscraper under construction in Jeddah, Saudi Arabia. Located in the north of the city, it is the centrepiece of the Jeddah Economic City project.[6] Jeddah Tower is planned to be the first 1-kilometre-tall (1,000 m; 3,300 ft) building and, upon completion, would become the world’s tallest building or structure, standing at least 180 metres (590 ft) taller than the Burj Khalifa.[7][8]
The design, created by American architect Adrian Smith, who also designed the Burj Khalifa, incorporates numerous unique structural and aesthetic features. The creator and leader of the project is Saudi Arabian prince Al-Waleed bin Talal,[9] who is the chairman of Kingdom Holding Company (KHC). KHC is a partner in the Jeddah Economic Company (JEC), which was formed in 2009 for the development of Jeddah Tower and City.[10]
Construction progress was halted in January 2018, when building owner JEC stopped structural concrete work. At the time, approximately one third of the tower had been completed. The halt resulted from labor issues with a contractor following the 2017–2019 Saudi Arabian purge and the COVID-19 pandemic. In September 2023, a new request for proposals was issued for completion of the delayed project.[11] After nearly five years of inactivity, development work resumed in 2023.[12] Construction restarted in January 2025, and the building is expected to be completed as early as 2028.[13]
Site
Jeddah Tower's 50-hectare (120-acre) plot, along with surrounding buildings, will be the first of a three-phase Jeddah Economic City development. The three-phase project was proposed for a large area of undeveloped waterfront land with an area of 5.2 square kilometres (2.0 sq mi).[14] The area is located roughly 20 kilometres (12 mi) north of the port city of Jeddah. Jeddah Economic City was designed by HOK Architects,[15] and is estimated to cost at least SR75 billion (US$20 billion) and take around ten years to build.[16]
The development is envisioned to grow into a new district of Jeddah.[17] The second phase of the project will be the infrastructure development needed to support the city, and the third phase has not yet been revealed.[18]
The focal point of the development and Jeddah Tower's primary use will be to house a Four Seasons hotel, Four Seasons short-rental apartments, Class A office space, and luxury condominiums. The tower will also have the world's highest observation deck.[19] Although the Jeddah Economic City plot is nearly isolated from the current urban core of Jeddah, no land tracts of such size were available closer to the city.[18] Northward is generally considered the direction in which the city will spread in the future.
Construction history
In May 2008, soil testing in the area cast doubt over whether the proposed location could support a skyscraper of the proposed one-mile (1,600 metres, 5,250 ft) height, and MEED reported that the project had been scaled back, making it "up to 500 metres (1,640 ft) shorter".[20] Work on the foundation was scheduled to begin towards the end of 2012.[21] Statements that construction would soon begin were made starting in 2008. In August 2011, the start of construction was slated as "no later than December".[22] This meant the tower was expected to be completed in 2017, though at that time it was also possible that it could still have been completed by the date the media continued to publish, which was the prior estimate of late 2016.[23] Only if construction had begun promptly and gone smoothly could completion in late 2016 have been achieved.[15]
Reports in 2009 suggested that the project had been put on hold due to the 2008 financial crisis and that Bechtel (the initial engineering firm for this project) was "in the process of ending its involvement with the project".[24][25] Kingdom Holding Company quickly criticized the news reports, insisting that the project had not been shelved.[26]
Architect selected
In March 2010, Adrian Smith of Adrian Smith + Gordon Gill Architecture (AS + GG) was selected as the preliminary architect[27] (though the firm deny involvement in the earlier, mile-high design[28][29]). Later, when the proposal was more serious, they won a design competition between eight leading architectural firms, including Kohn Pedersen Fox, Pickard Chilton, Pelli Clarke Pelli, and Foster + Partners, as well as the firm Smith formerly worked for, Skidmore, Owings and Merrill,[30] which was the final competitor in the competition before AS + GG was chosen.[31] In addition to Burj Khalifa, Adrian Smith has designed several other recent towers; the Zifeng Tower in Nanjing, China, the Trump International Hotel & Tower in Chicago, and the Jin Mao Tower in Shanghai,[32] as well as the Pearl River Tower in Guangzhou, China.[33] The four buildings are all among the forty tallest in the world. Furthermore, the Pearl River Tower is a unique tower that was originally designed to use zero net energy by drawing all its needed power from wind, sunlight, and geothermal mass,[34] though this design goal was not fully achieved.[35]
In October 2010, the owners (Kingdom Holding Company) signed a development agreement with Emaar Properties PJSC. The final height of the building was questionable, but it was still listed to be over 1 kilometre.[36] Kingdom Holding said construction was progressing.[37][38]
Designs for the foundation were in place by early August 2011 and the contract for the piling was tendered.[39] On 16 August 2011, Langan International officially announced their involvement and that the foundation and piling had to be uniquely designed to overcome subsurface issues such as soft bedrock and porous coral rock, which normally could not support a skyscraper without settling.[40] The foundation is similar to that of the Burj Khalifa, but larger; it is expected to average around 4.5 m (15 ft) deep with a concrete pad of area around 7,500 m2 (81,000 ft2). The concrete must have low permeability to keep out corrosive salt water from the Red Sea. Its depth and size are also considered to be an indicator of what the tower's final height will be.[41] The piles will be up to 200 m (660 ft) deep and the pad over 90 m (300 ft) across, yet the building, which will weigh over 900,000 tonnes (890,000 long tons; 990,000 short tons), is expected to settle. The idea is that it settles evenly enough so that the building does not tip or put undue stress on the superstructure. Computer modelling programmes performed tests at the site to confirm that the foundation design would work.[42] A later design for the foundation, to be constructed by Bauer in 2013, calls for 270 bored piles up to 110 m (360 ft) deep, which have to be installed into the difficult ground conditions.[21] Some materials needed for the structure are 500,000 m3 (18,000,000 cu ft) of concrete and 80,000 t (79,000 long tons; 88,000 short tons) of steel.[43]
Approvals
In March and April 2011, several news agencies reported that the Mile-High Tower design had been approved at that height and that the building would cost almost US$30 billion (SR112.5 billion).[28][29][44] This design was going to be drastically larger than the current design, with a floor area of 3,530,316 m2 (38,000,000 ft2), and would have used futuristic wind-aversion and energy-producing technology for sustainability. It and the surrounding city would have had the ability to accommodate 80,000 residents and one million visitors, according to RIA Novosti.[44]
On 2 August 2011, it was publicly announced by Kingdom Holding, the investment company, that a contract had been signed by Saudi Binladin Group (SBG), that construction was going to start soon, and that the tower was expected to take 63 months to complete.[45][46][47] While the official construction estimate was (at the time) expected to take five years and three months (63 months), others calculated that it will take over seven years, based on the duration of Burj Khalifa's construction.[48]
Contractors selected
In early August 2011, the Binladin Group was chosen as the main construction contractor with the signing of an SR4.6 billion (US$1.23 billion) contract,[49] which is less than it cost to build the Burj Khalifa (US$1.5 billion).[50] New renderings were revealed, and on 2 August it was widely reported that the project was a go at the 1,000-metre (3,300 ft) height[A] with a building area of 530,000 square metres (5,704,873 ft2),[B][51][52] and will take 63 months to complete.[53] The announcement of the main construction contract signing caused Kingdom Holding Company's stock to jump 3.2% in one day,[54] in addition to KHC already having reported a 21% rise in second-quarter net profit.[55] Gordon Gill and Adrian Smith were also confirmed as the architect.[56] The landscaping contract for the Jeddah Tower was awarded to Landtech Designs, a US-based company, which was tasked with irrigating 3.4 hectares (8.5 acres) of green space, to be collected through rainwater.[57][58]
Financing for the Jeddah Tower was complete by September 2012; Talal Al Maiman, chief executive officer and managing director of Kingdom Real Estate Development Co., said it had taken 20 months to gather all the investors.[59] The next month, Kingdom Holding awarded contracts totalling $98 million, and Subul Development Company paid $66.5 million for some land on the site. The Kingdom Riyadh Land project, a mixed-use commercial and residential development, will generate more than $5.33 billion of total investment and will house up to 75,000 people. The final master plan contract was awarded to Omrania & Associates and Barton Willmore.[60] Bauer, a German Foundations equipment manufacturer and contractor, was awarded a $32 million contract to support the initial phases of construction of the Jeddah Tower, including the installation of 270 bored piles measuring 1.5 and 1.8 metres (4 ft 11 in and 5 ft 11 in) in diameter.[61]
The Jeddah Economic Company (JEC) appointed the joint venture of EC Harris and Mace to manage the project in early 2013.[62][63] The Saudi Water Company also signed a 2.2 billion-riyal ($587 million), 25-year deal with JEC to supply 156,000 cubic metres (5,500,000 cu ft)of treated and drinking water per day.[64]
Construction begins and delays
Construction started on 1 April 2013.[65] The pilings were completed that December,[66] allowing above-ground construction to commence in September 2014.[67]

In late 2017, the owner of Kingdom Holding Co, which owns 33% of the tower, and the chairman of the Saudi Binladen Group, which owns 17% and is the primary contractor, were both arrested as part of the 2017 Saudi Arabian purge. Construction of the tower continued,[68] although some senior managers at Kingdom Holding were redirected to other projects.[69] In February 2018, Mounib Hammoud, CEO of Jeddah Economic City, said that construction was continuing and that they hoped to open the tower by 2020.[70] The walls had risen to 248 m (814 ft) by October, with the core reaching 60 storeys;[71] at the end of the year, the reported height was 252 m (827 ft).[72]
Building owner JEC halted structural concrete work in January 2018, with the tower about one-third completed, due to labour issues with a contractor following the Saudi Arabian purge. As a result, work on the tower became stalled (after it reached 63rd floor in 2018).[73] Two months later, Kingdom Holding Company signed a deal with Orange Business Services to provide information and communication technology (ICT) infrastructure to Jeddah Tower,[70] and construction resumed moved forward after the delay.[74] Work was also stalled in 2020 due to the COVID-19 pandemic, which ultimately led to a years-long delay.[75]
Restart

In September 2023, the Middle East Economic Digest (MEED) reported that Jeddah Economic City had restarted the project and a request for proposals had been issued for a contract to complete the construction of the tower. Fourteen construction contractors from the region, Europe, and China were given three months to prepare their bids.[76] In May 2024, the architect confirmed that construction would resume, and construction officially restarted in January 2025.[77] Work progressed at a relatively slow rate due to the observation of Ramadan in Saudi Arabia, but soon sped up after the festivities with Jeddah Tower reaching its 66th floor by April 2025.[78] During the restarted construction, a new crane was installed on the core part of the tower in order to accelerate the construction.[79] The Jeddah Tower was estimated to be topped out in 2 years.[80][13] By January 2026, work had reached the 80th floor[81][82] and was progressing so quickly that the Jeddah Tower is expected to reach its 100th floor by March 2026.[83]
Development team
The primary designer of Jeddah Tower is Chicago-based architect Adrian Smith of Adrian Smith + Gordon Gill Architecture (AS + GG),[8] the same architect who designed the Burj Khalifa while at Skidmore, Owings & Merrill (SOM),[37] where he worked for almost 40 years.[34] The development of the tower is being managed by Emaar Properties PJSC.[84] Thornton Tomasetti is the structural engineering firm,[81][82] and Environmental Systems Design, Inc. (ESD)[85] is a part of the AS + GG design team that serves as the building services engineering consultants.[86] The main construction firm, Saudi Binladin Group (SBG), is owned by the family of Osama bin Laden;[87][88] Adrian Smith emphasized the company’s size and experience make it suitable for large projects.[31]
Besix Group (Belgian Six Construct), which constructed the Burj Khalifa, was previously considered for the contract, but did not win, partially because SBG invested in Jeddah Economic Company (JEC),[89] contributing SR1.5 billion (US$400 million) towards the development of the project.[90] Besix admitted in 2010 that they expected Binladin Group to win the contract.[91] Jeddah Economic Company is a closed joint stock company (PJSC) formed in 2009 as a financial entity for Jeddah Tower and Jeddah Economic City. It is made up primarily of financiers (stakeholders) Kingdom Holding Company (33.35%), Abrar Holding Company (33.35%), which is owned by Samaual Bakhsh and businessman Abdulrahman Hassan Sharbatly (16.67%), as well as SBG (16.63%).[92] JEC's assets have a book value of nearly SR9 billion, broken down between a land bank of over 5,300,000 m2 (57,048,725 ft2) (the Jeddah Economic City plot) with a value of SR7.3 billion that will be used as collateral to attain bank loans, and SR1.5 billion in cash.[18] Kingdom Holding is an investment company founded in 1980 and 95% owned by Al-Waleed bin Talal[93] that has assets valued at over $25 billion, with interests in many major companies such as Walt Disney, PepsiCo, Kodak, Apple, Hewlett-Packard, Motorola, Time Warner, News Corporation, Pinnacle Infotech Solutions, and Citigroup, as well as real estate in London through its Songbird Estates division.[87]
Architecture

The building has been designed to a height of at least 1,008.2 metres (3,308 ft) (the exact height is being kept private while in development, similar to the Burj Khalifa).[A][53] At about one kilometre,[94] Jeddah Tower would be the tallest building or structure in the world,[7] standing 180 m (591 ft) taller than the Burj Khalifa in Dubai, United Arab Emirates.[8]
Structural design
The Jeddah Tower uses a bearing wall structural system in reinforced concrete based on a buttressed core configuration, refined from the system developed for the Burj Khalifa. The structure consists of a closed triangular central core with intersecting concrete walls radiating outward to form three wings that buttress the core and provide lateral stiffness under wind loading. Unlike many other supertall buildings, the structural concept does not rely on outrigger trusses or perimeter mega-columns, with lateral forces resisted primarily through the integrated wall system.
The concept and its antecedents can be traced to earlier concrete tower forms, including three legged structures such as the CN Tower in Toronto, completed in 1976. As the tower rises, the wings progressively taper, with inclined perimeter walls that contribute to aerodynamic stability and reduced wind induced forces. Above the occupied levels, the structure transitions into a predominantly closed wall spire with a different internal layout.[95][96]
Tuned mass dampers
The Jeddah Tower incorporates an auxiliary tuned mass damping system within the spire to control wind-induced motion at extreme elevations. Wind-tunnel testing and sensitivity studies indicated that the main tower structure is robust with respect to adverse wind effects and is predicted to remain within acceptable comfort criteria for occupants without the need for supplemental damping. However, while the spire is uninhabited, predicted wind-induced accelerations increase significantly toward the upper portions of the spire due to the non-linear behavior of the fundamental mode shape, requiring specific mitigation measures.
To address this condition, an auxiliary two-staged damping system was specified to limit motion within the spire only. According to the project description, the system consists of two tuned mass damper units with approximate masses of 870 tonnes and 260 tonnes, positioned at levels 206 (826 m) and 218 (874 m), respectively. The system is designed to reduce wind-induced movements in the spire by approximately 30 percent.[97][98]
Building systems
Lessons from Burj Khalifa informed Jeddah Tower’s structural design and planning of mechanical, electrical, and plumbing (MEP) systems, while meeting local regulations and international building codes.[99][100] Adrian Smith noted that practical considerations are often a greater challenge than structural durability, with the tower’s form primarily based on intended functions.[31] Orange Group is responsible for the building's information and communications systems.[101] ESD provides mechanical, plumbing, electrical, and fire protection engineering,[10] as well as teledata, audio/visual, security, and acoustics systems.[85] Langan International handles geotechnical engineering and some ground-level site work including transportation engineering and parking,[4] including the proposed 3,000–4,700 car underground garage near the tower.[102][31]
Vertical transportation
The elevator system will be located within the central structural core of the tower and will comprise approximately 8.025 kilometres of elevator hoistways. It will include 57 elevators, including 7 double-deck units, and 8 escalators, all supplied by the Finnish company Kone; vertical circulation is organized through three sky lobbies, segmenting elevator service through transfer levels rather than a single continuous run, with elevator efficiency and sky lobbies addressing vertical transportation challenges by allowing transfers without overloading individual elevators.[31][96][2]
The elevator system is designed to limit cable weight for efficiency.[103]
The tower will feature the world's highest observation deck, served by two dedicated high-speed shuttle elevators operating directly from ground level to the highest occupied floor. These shuttles will travel at speeds of up to 10 metres per second (36.0 km/h; 22.4 mph) in both directions, covering a vertical distance of approximately 640 metres, with a travel time of about 66 seconds from door close to door open.
To overcome the weight limitations of conventional steel hoisting ropes used in earlier supertall buildings, the observatory shuttle elevators will use KONE UltraRope, a carbon-fiber-based hoisting technology with a rectangular profile. During the design of the Burj Khalifa, practical limits of conventional steel ropes were reached at travel distances of around 500 metres due to rope self-weight. UltraRope is significantly lighter than traditional steel cables and is designed to support extreme travel distances exceeding one kilometre and very high operating speeds, beyond 20 metres per second.[2][96]
In addition, a dedicated workmen's lift will serve multiple technical levels within the spire, operating between level 169 (680 m) and level 230 (922 m).[2]
-
2nd proposed design of the sky terrace
-
3rd proposed design of the sky terrace
Economic viability
The building will include retail and other amenities to operate as a semi-self-sustaining "vertical city".[104] The estimated construction cost of US$1.23 billion is lower than Burj Khalifa’s US$1.5 billion, partly due to lower labor costs and three-shift construction.[50][105]
The 23 hectares (57 acres) area around the tower will include public space, a shopping mall, and residential and commercial developments, forming the Jeddah Tower Water Front District,[30] with the tower site covering 500,000 m2 (5,381,955 ft2).[106] Like other iconic skyscrapers, the tower is intended to be symbolic and to raise surrounding land values rather than its own profitability.[22] Adrian Smith said the design "evokes a bundle of leaves shooting up from the ground; a burst of new life that heralds more growth all around it."[107] The tower and Jeddah Economic City are designed to be interdependent.[31] Talal Al Maiman, board member of Jeddah Economic Company, said the tower will significantly increase the value of surrounding properties.[106]
The development model follows Burj Khalifa, where surrounding malls, hotels, and condominiums in Downtown Dubai generated the majority of project revenue,[108][106] while the tower itself had minimal profit.[109] In 2011, consultancy EC Harris reported Saudi Arabia is the least expensive Middle Eastern country for construction, cheaper than Bahrain and United Arab Emirates.[110] The tower’s proximity to King Abdulaziz International Airport may affect airspace.[104] Experts noted that buildings over one kilometre, including those approaching two kilometres (6,600 feet), are technically feasible but present practical and sustainability challenges.[111][112]
Impact
Saudi Arabia has experienced increased demand in its real estate market, accompanied by rising property prices, which some analysts have described as indicative of a potential real estate bubble. These trends have been linked to rapid population growth and a limited supply of housing. Demand has also extended to high-end residential developments, including projects such as the Jeddah Tower. In response to housing shortages, the Saudi government announced plans to invest US$67 billion (SR251 billion) in the construction of approximately 500,000 homes nationwide as part of broader economic and social development initiatives.[113] Saudi officials have stated that roughly 900 new housing units per day are required to meet the needs of the growing population, which has nearly quadrupled over the past four decades.[23]
The Jeddah Tower is planned as a central component of the wider Jeddah Economic City development. In parallel, multiple infrastructure and urban redevelopment projects have been undertaken or proposed across Saudi Arabia. Among these is the US$7.2 billion (SR27.1 billion) expansion of King Abdulaziz International Airport, which is intended to support increased capacity and regional development.[114]
According to a representative from Standard Chartered, which invested US$75 million in the Saudi Binladin Group, Saudi Arabia is expected to allocate more than US$400 billion (SR1.5 trillion) toward infrastructure projects over several years.[115] Analysis by Citigroup reported that approximately US$220 billion in development spending, representing 36 percent of total construction expenditure in the Middle East and North Africa, could directly or indirectly affect the Jeddah Tower project.[116] The Jeddah Tower and its surrounding development have also been presented by planners as an example of environmentally conscious construction, incorporating modern technologies aimed at reducing their overall carbon footprint relative to projected occupancy levels.[117]
Reception
Developers have suggested that large-scale landmark developments and the international visibility associated with constructing the world’s tallest building could contribute to gentrification and increased foreign interest in the country.[118] Architect Adrian Smith, the tower’s designer, described the project as a symbol of Saudi Arabia’s economic ambitions and technological capabilities.[119] In contrast, Bob Sinn, a principal engineer at Thornton Tomasetti, noted that the primary difficulties associated with constructing buildings of extreme height are often related to practical and operational considerations rather than structural feasibility alone.[120]
Talal Al Maiman, a board member of both Kingdom Holding Company and Jeddah Economic Company, stated that the tower is intended to function as both an economic catalyst and a symbolic representation of the kingdom’s position in the global economy.[121] Businessman Al-Waleed bin Talal characterized the development as a political and economic statement emphasizing domestic investment priorities.[122]
Floor plan
It is estimated that the Jeddah Tower will have 167 floors, with the total number of levels reaching 252, many of which will not be full slab-separated floors but merely practical vertical subdivisions.[E][31][123][124]
| Floor | Purpose |
|---|---|
| Levels 240 - 252 (Spire) | Steel top Spire |
| Level 250 (Spire) | Building Maintenance Unit (BMU) |
| Level 206 - 218 (Spire) | Tuned mass dampers (870 + 260 Tons) |
| Level 204 (Spire) | BMU |
| Level 186 (Spire) | BMU |
| Level 168 (Spire) | BMU |
| Level 167 (Spire) | Sky Raft (Four-meter-thick Spire Transfer Slab) |
| Levels 161 - 166 | Mechanical, Electrical and Plumbing (MEP) / BMU / Medium Voltage (MV) electrical equipment / Water Tanks Floors |
| Levels 157 - 159 | Observatory & Sky Terrace (630 m) |
| Level 155 | MEP / BMU Floors |
| Level 154 | Refuge Floor |
| Levels 126 - 153 | Void Space with Electric / Mechanical Rooms / Future Flexible Space |
| Level 124 (double height) | Refuge Floor |
| Levels 121 - 123 | MEP / BMU Floors |
| Levels 106 - 120 | Residential Group 4 Apartments (37 Units) |
| Level 104 (double height) | Refuge Floor |
| Levels 99 - 103 | Residential Group 4 Apartments (28 Units) |
| Levels 95 - 96 | MEP Floors |
| Levels 87 - 94 | Residential Group 3 Apartments (40 Units) |
| Level 86 | Refuge Floor |
| Level 84 (double height) | Residents Sky Lobbies Groups 3 & 4 |
| Levels 73 - 83 | Residential Group 2 Apartments (61 Units) |
| Level 71 (double height) | Refuge Floor |
| Levels 68 - 69 | MEP / BMU Floors |
| Levels 58 - 67 | Residential Group 1 Apartments (57 Units) |
| Level 56 (double height) | Refuge Floor |
| Levels 43 - 55 | Residential Group 1 Apartments (102 Units) |
| Levels 42 - 43 | Residents Sky lobbies Groups 1 & 2 |
| Levels 39 - 40 | MEP / BMU Floors |
| Level 38 | Refuge Floor |
| Levels 27 - 37 | Four Seasons Private Residences (97 Units) |
| Levels 20 - 26 | Four Seasons Hotel (182 Keys) |
| Level 18 | Refuge Floor |
| Levels 15 - 16 | MEP Floors |
| Levels 7 - 13 | Offices (sellable areas Core and Shell) |
| Level 4-6 (Podium) | Hotel Spa, Pools, Fitness ..... |
| Level 2 (Podium) | Residential group 2 Lobby, Hotel amenities |
| Level 1 (Podium) | Lobby and Drop-offs (Residential, Hotel and Offices) |
| Basement 1 Mezz (Podium) | Observatory Lobby, Security |
| Basement 1 (Podium) | Parking, Security, Hotel Administration |
| Basement 2 (Podium) | Ballroom, Restaurants, Parking, MEP, Back Of House (BOH), Facility Management (FM) service areas |
| Basement 3 (Podium) | Car Parking, Facilities Management, MEP |
| Below Podium | Pile raft foundation
Total number of 270 circular bored piles ranging from 45 to 105 meters depth and 1,5-1,8 m diameter. |
See also
- List of tallest buildings
- List of tallest buildings in Saudi Arabia
- List of tallest structures in the Middle East
- List of tallest buildings in Asia
Notes
- A. ^ a b c The actual height of the Burj Khalifa was not revealed until the opening ceremony. The developers of Jeddah Tower are similarly keeping the final height secret, stating only that it will be at least 1,000 metres (3,300 ft) high. In a television interview for WTTW in Chicago, architect Adrian Smith stated that the tower will be a little over twice the height of the Burj Khalifa, which is 828 metres (2,717 ft) high counting the antennas, suggesting that Jeddah Tower may be closer to 1,600 metres (5,200 ft); one mile high. Some sources have suggested that Jeddah Tower will break Burj Khalifa's record by over 740 metres (2,430 ft).[18] In 2014, online sources were using the number 1,008 m (3,307 ft).[125]
- B. ^ a b This figure has been referred to as the "total building area" in publications, which is probably another term for gross floor area; the actual usable floor space, which is what buildings are typically measured by, will presumably be less. This area has also been reported as 540,000 m2 (5,800,000 ft2).[14]
- C. ^ a This assumes a 2012 start date and the estimated completion time of 63 months.
- D. ^ a Figure attained using the formula for the area of a circle (πr2) and the given value of 30 m (98 ft) as the diameter.
- E. ^ a b No official floor count has been given; however, Adrian Smith said it will be about 50 floors taller than the (163-floor) Burj Khalifa.[126] In November 2010, an older kilometre-high design was said to contain over 200 floors.[91]
References
- ^ "Jeddah Tower – The Skyscraper Center". Council on Tall Buildings and Urban Habitat. Retrieved 2 March 2022.
- ^ a b c d Weismantle, Peter A. (2018). "Challenges in the Architectural Technical Design of the New Generation of Supertall Buildings". International Journal of High-Rise Buildings. 7 (1). doi:10.21022/IJHRB.2018.7.1.85.
- ^ "KONE wins order for Saudi Arabia's Kingdom Tower, the world's tallest building". KONE Corporation. Archived from the original on 23 August 2017. Retrieved 23 August 2017.
- ^ a b "Langan Website". Langan International. 2011. Archived from the original on 6 August 2011. Retrieved 5 August 2011.
- ^ Nambiar, Sona (2 August 2011). "Kingdom Tower to pip reigning champ Burj Khalifa by 173 m". Emirates 24/7. Dubai Media Incorporated. Retrieved 3 August 2011.
- ^ "Jeddah Tower: The tallest tower of the world". Jeddah Tower. Retrieved 11 November 2025.
- ^ a b AFP (13 March 2008). "Saudi mile-high tower plan raises bar". The Australian. Archived from the original on 7 March 2009. Retrieved 3 August 2011.
- ^ a b c "Kingdom Tower: Tallest of the tall". The Chicago Tribune. 2 August 2011. Retrieved 2 August 2011.
- ^ Farid, Sonia (4 April 2011). "Bin Talal remains richest Arab in 2011: report". Alarabiya.net. Archived from the original on 23 November 2011. Retrieved 10 August 2011.
- ^ a b "ESD Designing Building Systems for Kingdom Tower". Business Wire. 5 August 2011. Retrieved 5 August 2011.
- ^ Fakharany, Nour (4 October 2023). "World's Tallest Skyscraper Resumes Construction After a 5-Year Hiatus in Jeddah, Saudi Arabia". ArchDaily. Retrieved 4 October 2023.
- ^ "Jeddah developer restarts world's tallest tower". MEED. 13 September 2023. Retrieved 15 September 2023.
- ^ a b "Jeddah Tower: Construction officially restarts on world's tallest skyscraper". Construction Briefing. 4 October 2024. Retrieved 7 April 2025.
- ^ a b "Saudi skyscraper: facts and figures". London: The Daily Telegraph. 11 August 2011. Retrieved 11 August 2011.
- ^ a b Carr, Robert (11 August 2011). "JEC ASSEMBLES TEAM FOR $1.2B TOWER". Globest.com. Archived from the original on 27 September 2011. Retrieved 11 August 2011.
- ^ Devi, Kanchana (6 August 2011). "World's tallest tower to be built for $1.2 bn in Saudi Arabia". TruthDive. Archived from the original on 21 March 2012. Retrieved 6 August 2011.
- ^ Radnedge, Aidan (11 August 2011). "Kingdom Tower in Saudi Arabia to be world's next tallest building". Metro.co.uk. Archived from the original on 6 April 2012. Retrieved 11 August 2011.
- ^ a b c d Roberts, Ben (13 August 2011). "Crown of the Kingdom". ConstructionWeekOnline. Retrieved 13 August 2011.
- ^ Etherington, Rose (2 August 2011). "First image of world's tallest building, to be built in Jeddah". Dezeen. Retrieved 2 August 2011.
- ^ "Mile High Tower (working name) – Jeddah". Tallest Building in the World.com. Archived from the original on 16 July 2011. Retrieved 3 August 2011.
- ^ a b "BAUER Group again provides foundations for world's tallest building in Saudi Arabia". Bauer group. Archived from the original on 13 October 2012. Retrieved 14 October 2012.
- ^ a b Ryan Haggerty (21 October 2018). "Chicago firm's design towers over the rest". The Chicago Tribune. Retrieved 3 August 2011.
- ^ a b Mahbubani, Rhea (10 August 2011). "The Kingdom Tower To Overtake Burj Khalifa As Dubai's Tallest Tower". Haute Living. Retrieved 10 August 2011.
- ^ Singh, Timon. "Has the Mile High Tower been shelved?". MENA Infrastructure. GDS Publishing Ltd. Archived from the original on 28 January 2013. Retrieved 11 January 2011.
- ^ "Saudi mile-high tower latest skyscraper to stall". New Civil Engineer (Emap). Retrieved 23 February 2009.
- ^ "Kingdom Holding says tower not on hold". Arabian Business. Archived from the original on 26 November 2009. Retrieved 23 February 2009.
- ^ "US firm to design world's tallest tower in Saudi". AMEnfo. 16 March 2010. Archived from the original on 22 March 2010. Retrieved 11 May 2010.
- ^ a b Mark Brown (11 April 2011). "Saudi Arabia's mile-high Kingdom Tower gets green-lit". Wired.co.uk. Archived from the original on 23 July 2011. Retrieved 6 August 2011.
- ^ a b Wong, Raymond (7 April 2011). "Kingdom Tower will make the Burj Khalifa look short, reach one mile up". Dvice.com. Archived from the original on 12 January 2015. Retrieved 15 August 2011.
- ^ a b Joel Scanlon (4 August 2011). "Kingdom Holding Contracts Construction of World's Tallest Tower". AZoBuild. Retrieved 4 August 2011.
- ^ a b c d e f g "4 August 2011 -Architect Adrian Smith -Chicago Tonight Video -WTTW". WTTW. 4 August 2011. Retrieved 6 August 2011.
- ^ Janelle Zara (5 August 2011). "Bin Laden Group Plans to Build the World's Tallest Super Skyscraper in Jeddah". Art Info. Archived from the original on 10 August 2011. Retrieved 5 August 2011.
- ^ "Kingdom Tower Jeddah, Saudi Arabia: to be the world's tallest building". e-architect. 2 August 2011. Retrieved 5 August 2011.
- ^ a b Ephgrave, Oliver (13 August 2011). "King of skyscrapers". Retrieved 14 August 2011.
- ^ Frechette, R; Gilchrist, R (March 2008). "Towards Zero Energy: A case study of the Pearl River Tower, Guangzhou, China". Council on Tall Buildings and Urban Habitat: 9. Archived from the original on 26 May 2016. Retrieved 30 March 2015.
- ^ "Emaar Sign Agreement For 1000 m Tower". Skyscrapernews. 22 October 2010. Archived from the original on 28 November 2010. Retrieved 2 August 2011.
- ^ a b "Tallest tower plan in Jeddah on track". Gulf News. 22 October 2010. Archived from the original on 27 October 2010. Retrieved 31 October 2010.
- ^ Blair Kamin (22 October 2010). "Saudi mega-tower designed by Chicago architects moving ahead". The Chicago Tribune. Archived from the original on 27 October 2010. Retrieved 31 October 2010.
- ^ Chris Sleight (4 August 2011). "AS+GG named as architect for 1 km Kingdom Tower". KHL Group. Archived from the original on 6 October 2011. Retrieved 4 August 2011.
- ^ "Langan designs foundation for Kingdom Tower". Construction Week Online. 17 August 2011. Retrieved 22 January 2026.
- ^ White, Stephen (14 August 2011). "Higher and faster". ConstructionWeekOnline. Retrieved 14 August 2011.
- ^ Slevin, Jacob (25 August 2011). "Kingdom Tower: World's Newest Tallest Building for 2016". Huffington Post. Retrieved 25 August 2011.
- ^ "Kingdom Tower: How The World's Next Tallest Building Will Be Built". Gizmodo. Retrieved 1 May 2014.
- ^ a b "The tallest building in the world". The Sydney Morning Herald. 17 April 2011. Retrieved 21 April 2011.
- ^ "Kingdom's Alwaleed: Tallest Tower To Provide Sustainable Profit". The Wall Street Journal. 2 August 2011. Archived from the original on 5 January 2012. Retrieved 2 August 2011.
- ^ Saudi Prince Alwaleed To Build World's Tallest Tower With Binladen Group Kerry A. Dolan, Forbes, 2 August 2011 @ 01:04 pm
- ^ Building a landmark: Kingdom Tower, The world's tallest building Kingdom Holding Company. 26 December 2011
- ^ Stuart Matthews (3 August 2011). "How long will Kingdom Tower take to construct?". ConstructionWeekOnline. Retrieved 7 August 2011.
- ^ El-Tablawy, Tarek (2 August 2011). "Saudis plan world's tallest tower". The Seattle Times. Retrieved 4 January 2023.
- ^ a b CW Staff (4 August 2011). "Kingdom Tower cheaper to build than Burj Khalifa". ConstructionWeekOnline. Retrieved 6 August 2011.
- ^ "Kingdom Holding Co signs US$1.2 billion deal with Saudi Binladen Group to build world's tallest tower". The Economic Times. 2 August 2011. Retrieved 2 August 2011.
- ^ "Binladen Group Awarded $1.2bn Contract Awarded to Build World's Tallest Tower". Trade Newswire. 2 August 2011. Archived from the original on 19 April 2012. Retrieved 2 August 2011.
- ^ a b Khan, Ghazanfar Ali; Abbas, Maher (3 August 2011). "Kingdom Holding to build world's tallest tower in Jeddah". Arab News. Archived from the original on 19 March 2012. Retrieved 10 August 2011.
- ^ Zahra Hankir (2 August 2011). "Kingdom Holding's Stock Jumps on Contract for Record-High Tower". Bloomberg. Retrieved 2 August 2011.
- ^ Abeer Allam (2 August 2011). "Saudi Arabia plans world's tallest tower". Financial Times. Retrieved 4 August 2011.(subscription required)
- ^ "AS+GG Designs Kingdom Tower, to Be the World's Tallest Building" (Press release). Adrian Smith + Gordon Gill Architecture. 2 August 2011. Retrieved 3 August 2011.
- ^ CW Staff (21 August 2012). "Landtech wins Kingdom Tower irrigation contract".
- ^ "Landech to Design Irrigation System for Kingdom Tower, Soon to be the World's Tallest Building". Landtech Design. 13 August 2012.
- ^ "Kingdom Tower financing complete | GulfNews.com". Archived from the original on 1 October 2012. Retrieved 15 October 2012.
- ^ "Kingdom Holding Awards Contracts Worth $98 Million". U.S.-Saudi Arabian Business Council. 10 October 2012. Archived from the original on 8 November 2014. Retrieved 7 November 2014.
- ^ "Bauer awarded Kingdom Tower contract – KHL Group". Archived from the original on 16 March 2016. Retrieved 19 November 2023.
- ^ "We are now Arcadis". Retrieved 19 November 2023.
- ^ "EC Harris and Mace will manage Kingdom Tower project". 22 September 2022.
- ^ Deema Almashabi (29 April 2013). "Saudi Water Company Signs $587 Million Jeddah Tower Deal". Bloomberg. Retrieved 7 February 2015.
- ^ Staff (May 2013). "Emaar 'considering' tower higher than 1km-tall Kingdom Tower". Emirates 24-7.
- ^ "Jeddah Economic Company Board of Directors Appoints New CEO JEC Announces Completion of Pilling of Tallest Tower in the World". Kingdom Holdings. 4 December 2013. Archived from the original on 15 February 2015. Retrieved 9 December 2013.
- ^ "Jeddah's Kingdom Tower to use World's Tallest Construction Crane". CTBUH. 19 September 2014. Archived from the original on 20 December 2014. Retrieved 9 January 2015.
- ^ "Jeddah Tower going ahead after Saudi corruption purge". Arabian Business. ITP Media Group. Reuters. 8 February 2018. Retrieved 23 April 2018.
- ^ Parasie, Nicolas; Said, Summer (12 March 2018). "Crown Prince's Decision-Making Power Reaches Deep into Companies". Wall Street Journal. Retrieved 23 April 2018.
At his Kingdom Holding conglomerate, Prince al-Waleed and his team remain nominally in charge. But the Saudi government demonstrated its new influence in February when it ordered some of his senior managers to leave his biggest new project, Jeddah Tower, slated to be the tallest building in the world at over 3,000 feet high. The government directed them instead to work on construction of Neom, a new, high-tech Saudi city envisioned by Prince Mohammed, said people familiar with the directive, who understood it to be in line with the prince's wishes.
- ^ a b "Smart services deal signed for $1.5bn Jeddah Tower project". ArabianBusiness.com. 23 March 2018. Retrieved 11 June 2018.
- ^ McKeown, Renee (5 March 2020). "Jeddah Tower Progress: What Happened to the World's Tallest Tower?". The Urban Developer. Retrieved 1 July 2020.
- ^ Lo, Andrea (17 January 2018). "Jeddah Tower: What does the world's next tallest skyscraper look like now?". CNN. Retrieved 14 July 2020.
- ^ "Jeddah Tower construction restarts". www.concreteconnect.co.uk. 4 February 2025. Retrieved 2 September 2025.
- ^ "Construction of world's tallest tower restarts after delays". Dezeen. 12 March 2018. Retrieved 9 July 2018.
- ^ Dave Roos (14 June 2022). "Will the Jeddah Tower, World's Tallest Building, Ever Be Finished?". HowStuffWorks. Retrieved 8 July 2022.
- ^ Strahler, Steven R. (20 September 2023). "Chicago architect eyes restart of long-stalled tallest tower in the world". Crain's Chicago Business. Retrieved 4 October 2023.
- ^ "Kingdom Holding Resumes Construction of Jeddah Tower". spa.gov.sa. Retrieved 21 January 2025.
- ^ Khalid, Akram Bin (11 April 2025). "Jeddah Tower : The Future of Skyscrapers". ArchUp. Retrieved 2 May 2025.
- ^ ArchUp Newsroom Team (17 June 2025). "New Crane Installed on Jeddah Tower to Accelerate Construction Progress ArchUp News". ArchUp. Retrieved 7 July 2025.
- ^ Reporter, Jesus Mesa Live News (10 May 2024). "Construction restarts on world's tallest skyscraper". Newsweek. Retrieved 27 May 2024.
- ^ a b Goveas, Bina (7 January 2026). "Jeddah Tower achieves construction milestone; tops 80 floors". Gulf Construction. Retrieved 22 January 2026.
- ^ a b Hargreaves, Libby (12 January 2026). "World's Tallest: How Jeddah Tower Surpassed 80-Floor Mark". Construction Digital. Retrieved 22 January 2026.
- ^ Hargreaves, Libby (12 January 2026). "World's Tallest: How Jeddah Tower Surpassed 80-Floor Mark". Construction Digital. Retrieved 22 January 2026.
- ^ Sharif, Arif (22 October 2010). "Alwaleed Picks Burj Khalifa Architect Adrian Smith to Design Kingdom Tower". Bloomberg. Retrieved 22 October 2010.
- ^ a b Abdulla, Hannah-Farah (9 August 2011). "Kingdom Tower: ESD wins building systems contract". ConstructionWeekOnline. Retrieved 7 November 2014.
- ^ "Kingdom Tower World's Tallest Skyscraper in Jeddah". Urukia Magazine. 3 August 2011. Retrieved 5 August 2011.
- ^ a b CW staff (16 August 2011). "Roll call". ConstructionWeekOnline. Retrieved 16 August 2011.
- ^ "Saudi prince developing world's tallest building". NewsFeed Researcher. 3 August 2011. Archived from the original on 14 October 2014. Retrieved 9 August 2011.
- ^ Gerhard Hope (7 August 2011). "Besix: Kingdom Tower's big challenge is logistics". ConstructionWeekOnline. Retrieved 7 August 2011.
- ^ "Kingdom eyes loans, cash to build world's tallest tower". Arabian Business. 7 August 2011. Retrieved 7 August 2011.
- ^ a b Broomhall, Elizabeth (21 November 2010). "Besix: we expect Binladin to win Kingdom Tower". ConstructionWeekOnline. Retrieved 15 August 2011.
- ^ DeFreitas, Susan (12 August 2011). "Planned Green Skyscraper Really, Really Tall". EarthTechling LLC. Retrieved 12 August 2011.
- ^ "Alwaleed bin Talal companies to build the tallest tower in the world". Al Bawaba. 8 August 2011. Retrieved 18 August 2011.
- ^ "Listerious – List of Jeddah Tower facts". Archived from the original on 26 September 2020. Retrieved 7 August 2011.
- ^ Smith, Adrian D.; Gill, Gordon; Irwin, H. P. A. H. (2022). "Jeddah Tower". Supertall/megatall: how high can we go?. Novato, CA: ORO Editions. p. 322-327. ISBN 978-1-954081-37-6.
- ^ a b c Going "Mega Tall" in Arabia (Project technical presentation). Jeddah Economic Company. 2016.
- ^ "4. Project Components". The Jeddah Tower - Annex A - Project Description Brief - August 2023. Jeddah Economic Company Ltd. 2023. p. 9.
- ^ Smith, Adrian D.; Gill, Gordon; Irwin, H. P. A. H. (2022). "Jeddah Tower". Supertall/megatall: how high can we go?. Novato, CA: ORO Editions. p. 315. ISBN 978-1-954081-37-6.
- ^ Oliver Ephgrave (10 August 2011). "Experts: tapered form of Kingdom Tower is ideal". ConstructionWeekOnline. Retrieved 11 August 2011.
- ^ Davids, Gavin (24 August 2011). "Burj Khalifa provides Kingdom Tower MEP template". ConstructionWeekOnline. Retrieved 24 August 2011.
- ^ Reporter, Naushad K. CherrayilStaff (12 April 2018). "Digital transformation is 'key to future development'". Gulfnews.com. Retrieved 2 June 2018.
- ^ "Portfolio (PDF)". Langan International. 2011. Archived from the original on 29 September 2011. Retrieved 5 August 2011.
- ^ "Mile-high tower wars: How tall is too tall?". The Independent. London. 18 June 2008. Retrieved 6 August 2011.
- ^ a b Jeffery Townson (3 August 2011). "Waleed's Saudi Mega Tower is Even Cooler Than You Think". The Business Insider. Retrieved 4 August 2011.
- ^ Staff writer (15 August 2011). "No hurdle to Kingdom Tower hitting 2 km". ArabianBusiness.com. Retrieved 15 August 2011.
- ^ a b c Matthews, Stuart (13 August 2011). "City of the hyper tall". ConstructionWeekOnline. Retrieved 13 August 2011.
- ^ Vrushti Mawani (5 August 2011). "Kingdom Tower by Bin Laden Group will be the World's Tallest Building". Industry Leaders Magazine. Retrieved 6 August 2011.
- ^ Hope, Gerhard (13 August 2011). "The Kingdom beckons". ConstructionWeekOnline. Retrieved 13 August 2011.
- ^ "Should the Kingdom Tower be built?". bdonline.com. 16 August 2011. Retrieved 16 August 2011.
- ^ "Kingdom Tower cheaper to build than Burj Khalifa". Arab Business. 4 August 2011. Retrieved 7 August 2011.
- ^ Oliver Ephgrave (4 August 2011). "Skyscraper experts say 2 km tower is now possible". ConstructionWeekOnline. Retrieved 4 August 2011.
- ^ Ephgrave, Oliver (13 August 2011). "Tall order". ConstructionWeekOnline. Retrieved 13 August 2011.
- ^ Aya Lowe (5 August 2011). "Saudi real estate market poised for boom". Gulf News. Retrieved 4 August 2011.
- ^ "Saudi begins building new $7.2 bn Jeddah airport". AFP. 11 January 2011. Retrieved 6 August 2011.
- ^ Bloomberg (8 August 2011). "Standard Chartered buys equity stake in Saudi Bin Laden unit". Gulf News. Retrieved 9 August 2011.
- ^ Construction Week (13 August 2011). "Kingdom beckons". Retrieved 13 August 2011.
- ^ BD Online (16 August 2011). "Green ambitions for Kingdom Tower". Retrieved 16 August 2011.
- ^ "'World's Tallest Building' Crown is Coming to Saudi Arabia". Arabianomics. 15 April 2011. Retrieved 6 August 2011.
- ^ Industry Leaders (5 August 2011). "Adrian Smith on Kingdom Tower". Retrieved 5 August 2011.
- ^ Oliver Ephgrave (11 August 2011). "Engineer: Kingdom Tower is practical challenge". ConstructionWeekOnline. Retrieved 11 August 2011.
- ^ "World's tallest building coming to Saudi Arabia". NBC News. 2 August 2011. Retrieved 5 August 2011.
- ^ "Alwaleed: Kingdom Tower a symbol of domestic investment". The Seattle Times. 2 August 2011. Retrieved 5 August 2011.
- ^ "2. Project Components". The Jeddah Tower - Annex A - Project Description Brief - August 2023. Jeddah Economic Company Ltd. 2023. p. 5.
- ^ Smith, Adrian D.; Gill, Gordon; Irwin, H. P. A. H. (2022). "Jeddah Tower". Supertall/megatall: how high can we go?. Novato, CA: ORO Editions. p. 278. ISBN 978-1-954081-37-6.
- ^ Gibbon, Gavin (14 May 2014). "Kingdom Tower to complete in December 2018". ConstructionWeekOnline. Retrieved 7 November 2014.
- ^ CW Staff (17 August 2011). "Kingdom Tower to be 50 storeys taller than Burj". ConstructionWeekOnline. Retrieved 17 August 2011.
External links
- Kingdom Holding Company website
- Jeddah Tower on the CTBUH Skyscraper Center
- Slideshow image gallery of renderings by Fox News
- Jeddah Tower on Twitter
- Construction on Jeddah Tower Resumes on YouTube