National Route 33 (South Korea)

33
nr 33
National Route 33
국도 제33호선
Route information
Length226.1 km (140.5 mi)
Existed14 March 1981–present
Major junctions
South endGoseong, South Gyeongsang Province
North endGumi, North Gyeongsang Province
Location
CountrySouth Korea
Highway system

National Route 33 is a national highway in South Korea connects Goseong to Gumi. It was established on 14 March 1981.[1]

History

  • March 14, 1981: New construction of ‘’'National Highway Route 33'‘’ Goseong ~ Seonsan Line[2]
  • May 8, 1981: Opening of the 92 km section from Hapga-dong, Ssangnim-myeon, Goryeong-gun to Saenggok-dong, Seonsan-eup, Seonsan-gun, upgraded to a national highway[3]
  • May 12, 1981: Opening of the 110.745 km section from Songhak-dong, Goseong-eup, Goseong-gun to Wari, Yulgok-myeon, Hapcheon-gun, upgraded to a national highway[4]
  • May 30, 1981: Designated as a new 172km section under the amended Presidential Decree No. 10247 on the Designation of General National Highway Routes[5]
  • January 12, 1996: 900m section expansion and opening of the road between Yakmok and Gumi City Boundary (Yul-ri, Buksam-myeon, Chilgok-gun ~ Inpyeong-ri)[6]
  • July 1, 1996: Terminus changed from ‘Seonsan-eup, Seonsan-gun, Gyeongsangbuk-do’ to ‘Seonsan-eup, Gumi-si, Gyeongsangbuk-do’. Consequently, it became the ‘Goseong ~ Gumi Line’.[7]
  • May 8, 1998: Expansion and opening of the 3.2 km section from Gwanho-ri, Yakmok-myeon, Chilgok-gun to Yeongri, Gisan-myeon; existing 2.1 km section abolished[8]
  • July 20, 1999: Opening of the 2.04 km section of the Daeyang Bypass Road (Deokjeong-ri, Daeyang-myeon, Hapcheon-gun ~ Daemok-ri), closing the existing 1.72 km section[9]
  • September 3, 1999: Opening of the 2.4 km section of the Daeui Bypass Road (Chusan-ri, Daeui-myeon, Uiryeong-gun ~ Masang-ri)[10]
  • December 21, 1999: Opening of the 1.74 km section of the Ssangbaek Bypass Road (from Pyeonggu-ri to Hasin-ri, Ssangbaek-myeon, Hapcheon-gun), with the existing 1.02 km section closed[11]
  • November 22, 2003: Expansion and opening of the 4.56 km section of the Goseong Bypass Road (from Sinwol-ri to Gyosa-ri, Goseong-eup, Goseong-gun)[12][13]
  • December 31, 2003: Goseong ~ Jaeun-gan Road (Goseong-gun, Goseong-eup, Gyosa-ri ~ Sangri-myeon, Musan-ri) section, 8.47km expansion and opening[14] and abolition of the existing 1.02 km section in Idang-ri, Goseong-eup, Goseong-gun[15]
  • January 1, 2004: Opening of the 3.0 km section of Gwanho Bridge (Gwanho-ri, Yakmok-myeon, Chilgok-gun ~ Muri-ri) at Gwanho Intersection; expansion and opening of the 7.8 km section of the Waegwan ~ Gumi Road (Gwanho-ri, Yakmok-myeon, Chilgok-gun ~ Imun-dong, Gumi-si)[16]
  • November 19, 2004: Hapcheon Bypass Road, Partial section of Hapcheon ~ Ssangnim Road (Jeongyang-ri, Daeyang-myeon, Hapcheon-gun ~ Yuljin-ri, Yulgok-myeon) 5.5km section expanded and opened,[17] Abolition of the existing 4.1km section from Jeongyang-ri, Daeyang-myeon, Hapcheon-gun to Geumyang-ri, Hapcheon-eup[18]
  • December 28, 2004: Expansion and opening of the 8.0km section of the Jaeun ~ Sangri Road (Maseon-ri, Sangri-myeon, Goseong-gun ~ Hakchon-ri, Jeongdong-myeon, Sacheon-si),[19] Abolition of the 270m section in Sinchon-ri, Sangri-myeon, former Goseong-gun[20][21]
  • July 1, 2005: Sanhwa Bridge access ramp section opened[22]
  • November 9, 2005: Designated the 9.64 km section from Bonggang-ri, Jiphyeon-myeon, Jinju-si to Pyeonggeo-dong as an expressway[23]
  • December 27, 2005: Sacheon Bypass Road (6.21 km section from Pungjeong-ri, Jeongdong-myeon, Sacheon-si to Baechun-ri, Chukdong-myeon) expansion opened to traffic,[24] Abolition of the existing 3.18km section from Pungjeong-ri, Jeongdong-myeon, Sacheon-si to Suseok-ri, Sacheon-eup[25]
  • December 19, 2006: Expansion and opening of the 10.2 km section of the Jinju ~ Jipyeon Road (Jangjae-dong, Jinju-si ~ Jeongsu-ri, Jipyeon-myeon),[26] Abolition of the existing 13.2 km section[27]
  • December 26, 2006: Expansion and opening of the 5.4 km section of the Hapcheon ~ Ssangnim Road (Wari, Yulgok-myeon, Hapcheon-gun ~ Hapga-ri, Ssangnim-myeon, Goryeong-gun),[28] Abolition of the existing 6.6 km section[29]
  • September 21, 2007: Expansion and opening of the 10.98 km section of the Seongju–Whaegwan Road (Sam-san-ri, Seongju-eup, Seongju-gun ~ Yeong-ri, Gisan-myeon, Chilgok-gun),[30] Abolition of Existing Section[31]
  • February 4, 2008: Expansion and opening of the 3.74 km section of the Ssangbaek ~ Hapcheon Road (Daemok-ri ~ Jeongyang-ri, Daeyang-myeon, Hapcheon-gun),[32] Abolition of Existing Section[33]
  • September 10, 2008: Expansion and opening of the 2.6 km section of the Hapcheon ~ Ssangnim Road (Yuljin-ri, Yulgok-myeon, Hapcheon-gun ~ Wari),[34] Abolition of the existing 2.7 km section[35]
  • December 30, 2008: Expansion and opening of the 5.0 km section of the Sangri ~ Sacheon Road (Hakchon-ri ~ Daegok-ri, Jeongdong-myeon, Sacheon-si),[36] Abolition of Existing Sections[37]
  • June 9, 2009: Expansion and opening of the 5.8 km section of the Sangri ~ Sacheon Road (Hakchon-ri ~ Pungjeong-ri, Jeongdong-myeon, Sacheon-si),[38] Abolition of the existing 5.68 km section[39]
  • September 25, 2009: Expansion and opening of the 2.84 km section of the Hapcheon ~ Ssangnim Road (Hapga-ri ~ Maechon-ri, Ssangnim-myeon, Goryeong-gun),[40] Abolition of the existing 2.9 km section[41]
  • December 10, 2009: Expansion and opening of the 4.641 km section of the Seonsan ~ Dogae Road (Gumi-si, Seonsan-eup, Gyori ~ Dogae-myeon, Sillim-ri),[42] Abolition of the existing 2.4 km section[43]
  • December 30, 2009: Expansion and opening of the 7.82 km section of the Jiphyun ~ Saengbiryang Road (Jeongsu-ri, Jiphyun-myeon, Jinju-si ~ Gage-ri, Saengbiryang-myeon, Sancheong-gun),[44] Abolition of the existing 8.48 km section[45]
  • December 31, 2009: Expansion and opening of the 8.6 km section of the Ssangbaek ~ Hapcheon Road Section 1 (Jangjeon-ri, Ssangbaek-myeon ~ Deokjeong-ri, Daeyang-myeon, Hapcheon-gun),[46] Abolition of Existing Section[47]
  • February 29, 2012: Expansion and opening of the 3.4 km section of the Jinju City National Highway Bypass Road between Yugok and Jeongchon (Doksan-ri, Naedong-myeon, Jinju City ~ Hwagae-ri, Jeongchon-myeon)[48]
  • June 29, 2012: Expansion and opening of the 3.3 km section of the Jinju City National Highway Bypass Road between Yugok and Jeongchon (Ihyeon-dong, Jinju City ~ Doksan-ri, Naedong-myeon)[49]
  • February 10, 2015: Opening of the 8.65 km section expansion of the Jipyeon ~ Yugok section of the Jinju City National Highway Bypass Road (Ihyeon-dong, Jinju City ~ Naengjeong-ri, Jipyeon-myeon)[50]
  • September 21, 2015: Expansion and opening of the 7.8 km section of the Saengbiryang ~ Ssangbaekgan Road (from Masang-ri, Daeui-myeon, Uiryeong-gun to Pyeonggu-ri, Ssangbaek-myeon, Hapcheon-gun), with the existing 6.6 km section discontinued[51]
  • November 20, 2015: Expansion and opening of the 1.0 km section of the Saengbiryang ~ Ssangbaekgan Road (Masang-ri, Daeui-myeon, Uiryeong-gun ~ Eojeon-ri, Samga-myeon, Hapcheon-gun)[52]
  • December 22, 2015: Expansion and opening of the 10.64 km section of the Goryeong ~ Seongju Intercity Road Section 1 (Kwaebin-ri, Goryeong-eup, Goryeong-gun ~ Gyejeong-ri, Suryeon-myeon, Seongju-gun); closure of the existing 140 m section in Wolsan-ri, Unsu-myeon, Goryeong-gun,[53] Abolition of the existing 8.3km section (Kwaebin-ri, Daegaya-eup, Goryeong-gun ~ Gyejeong-ri, Suryeon-myeon)[54]
  • March 15, 2016: The existing 16.68 km section within Jinju City (Hwagae-ri, Jeongchon-myeon ~ Naengjeong-ri, Jiphyeon-myeon, Jinju-si) was abolished upon completion of the Jinju City National Highway Bypass Road.[55]
  • April 8, 2016: The section within Jinju City was removed and the route was changed to the National Highway Bypass Road section following the opening of the Jinju City National Highway Bypass Road.[56]
  • August 9, 2016: The 6.77 km section from Gupo-dong to Gupyeong-dong in Gumi City designated as an automobile-only road,[57] Designated as an expressway for the 7.41 km section from Gupyeong-dong, Gumi-si to Deoksan-ri, Yakmok-myeon, Chilgok-gun,[58] designating the 8.57 km section from Geogido-dong, Gumi-si to Songnim-ri, Goa-eup as an automobile-only road,[59] designating the 11.2 km section from Songnim-ri, Goa-eup, Gumi-si to Wonjeom-ri, Seonsan-eup as an expressway[60]
  • November 23, 2016: Temporary opening of a 1.78 km section (Ponam-ri, Seokjeok-eup, Chilgok-gun ~ O-pyeong-ri, Buksam-eup) within the Gumi City National Highway Bypass Road (Gupo ~ Deoksan section) for resident convenience[61]
  • December 29, 2016: Expansion and opening of the 21.05 km section of the Goryeong ~ Seongju Intercity Road, Sections 2 and 3 (Gyejeong-ri, Suryeon-myeon, Seongju-gun ~ Daeheung-ri, Seongju-eup), abolishing the existing 6.1 km section from Gyejeong-ri to Sinjeong-ri, Suryeon-myeon, Seongju-gun[62]
  • September 28, 2017: Expansion and opening of the 2.2 km section of the Ssangnim ~ Goryeong Road (Annim-ri, Ssangnim-myeon, Goryeong-gun ~ Goari, Daegaya-eup)[63] and the existing 9.0 km section from Gwewon-ri, Ssangnim-myeon, Goryeong-gun to Heonmun-ri, Daegaya-eup will be abolished[64]
  • December 27, 2019: Expansion and opening of the 2.2 km section of the Ssangnim ~ Goryeong Road (Annim-ri ~ Gwewon-ri, Ssangnim-myeon, Goryeong-gun)[65]
  • January 17, 2020: New 7.41 km section of Gumi City National Highway Bypass Road, Section 2 (Gupo ~ Deoksan) (Gupyeong-dong, Gumi City ~ Deoksan-ri, Yakmok-myeon, Chilgok-gun) opened to traffic[66][67]
  • March 9, 2020: The existing 2.8 km section from the Deoksan Intersection in O-pyeong-ri, Buk-sam-eup, Chilgok-gun to the boundary of O-tae-dong, Gumi-si was abolished due to the opening of the Gumi City National Highway Bypass Road between Gupo and Deoksan. [68]
  • March 17, 2020: The total length was reduced from 227.2 km to 211.3 km through a road route change notice[69]
  • June 30, 2020: New opening of the 6.95 km section of the Gumi City National Highway Bypass Road, Section 1 (Gupo ~ Deoksan) (Gumi City Geogido ~ Gupyeong-dong).[70]
  • June 30, 2021: New opening of the 9.7 km section of the Gumi City National Highway Bypass Road, Section 1 (Gumi City Geogido ~ Goaeup Songnim-ri) between Gupo and Saenggok[71]
  • December 17, 2021: New opening of the 11.86 km section of the Gumi City National Highway Bypass Road, Section 2 (Songnim-ri, Goa-eup, Gumi City ~ Imun-ri, Seonsan-eup, Gumi City) between Gupo and Saenggok[72]
  • December 29, 2021: The existing 11.7 km section of the Gumi City National Highway Bypass Road between Munseong-ri, Goa-eup and Dongbu-ri, Seonsan-eup was abolished due to the opening of the new Gupo ~ Saenggok section of the bypass road.[73]


Main stopovers

South Gyeongsang Province

North Gyeongsang Province

Major intersections

IS: Intersection, IC: Interchange

Name [74] Hangul name Connection Location Note
Sinwol IC 신월 나들목 National Route 14
Prefectural Route 1018
(Namhaean-daero)
Goseong County Goseong-eup Terminus
Manlim IC 만림 나들목 Nampo-ro 79beon-gil
No name (이름 없음) Songhakgobun-ro
Bupo IS 부포사거리 Prefectural Route 1016
(Bupo-ro)
Sangni-myeon Prefectural Route 1016 overlap
Cheokjeong IS 척정 교차로 Prefectural Route 1016
(Samsang-ro)
Sangri IS 상리 교차로 Osan 3-gil
Cheokbeonjeong 7-gil
Gobong IS 고봉 교차로 Gobong-ro
Sogok IS 소곡삼거리 Sogok-gil Sacheon City Jeongdong-myeon
Idong IS 이동삼거리 Soesil-gil
Hakchon IS 학촌 교차로 Hakchon-gil
Geonjeom IS 건점 교차로 Geonjeom 1-gil
Jeongdong IS 정동 교차로 Nocheon-gil
Daegok IS 대곡 교차로
Singi IS 신기 교차로 Sucheong-gil
Jangsam-gil
Pungjeong IS 풍정삼거리
Pungjeong IS 풍정사거리 Pungjeong-gil
Pungjeong IS 풍정 교차로 옥산로
Hwaam Tunnel 화암터널 Approximately 505m
Banggok IS 방곡 교차로 Prefectural Route 30
Prefectural Route 1002
(Guamdumun-ro)
Sacheon-eup
Guam IS 구암 교차로 Prefectural Route 1002
(Duryang-ro)
Baechun IS 배춘삼거리 National Route 3
(Sacheon-daero)
National Route 3 overlap
Suseok Bridge
Chukdong-myeon
No name (이름 없음) Prefectural Route 1002
(Seosam-ro)
National Route 3 overlap
Ungye IS 운계 교차로 Prefectural Route 1002
(Ungye-gil)
National Route 3 overlap
Prefectural Route 1002 overlap
Sacheon IC IS 사천IC사거리 Prefectural Route 1002
(Seosam-ro)
Gilpyeong-gil
Sacheon IC IS 사천IC 교차로 Namhae Expressway National Route 3 overlap
Yeha IS 예하 교차로 Gangju-gil Jinju City Jeongchon-myeon
Yeha 1 Overpass 예하1육교 Daechuk-gil
No name (이름 없음) Jeongchon-ro
Hwagae IS 화개 교차로 National Route 2
(Jeongchon Bypass Road)
Jinji-daero
National Route 2 and National Route 3 overlap
Naedong IS 내동 교차로 National Route 2
(Gyeongseo-daero)
Naedong-myeon
Namgang Bridge (South end) (남강대교 남단) Manggyeong-ro National Route 3 overlap
Namgang Bridge
(Huimang Bridge)
남강대교
(희망교)
Pyeonggeo-dong
Huimang Bridge IS 희망교 교차로 Namgang-ro
No name (이름 없음) Pyeonggeo-ro
Saepyeonggeo-ro
National Route 3 overlap
10 Square IS 10호광장 교차로 Jinnyangho-ro
Daesa IS 대사 교차로 Seojang-daero
Sunhwan-ro 676beon-gil
Ihyeon-dong
Nabulcheon Bridge 나불천교
Myeongseok IS 명석 교차로 National Route 3
(Jinju-daero)
Hakgan Bridge 각한교
Jiphyeon-myeon
Gakhan Tunnel 각한터널 Right tunnel: Approximately 348m
Left tunnel: Approximately 313m
Sachon 1 Bridge 사촌1교
Sachon Tunnel 사촌터널 Right tunnel: Approximately 223m
Left tunnel: Approximately 248m
Sachon 2 Bridge 사촌2교
Sachon IS 사촌 교차로 Hanchigol-gil
Gwandong Bridge
Gidong Bridge
관동교
기동교
Gwanji Tunnel 관지터널 Approximately 246m
Bonggang 1 Bridge
Bonggang 2 Bridge
봉강1교
봉강2교
Jiphyeon IS 집현 교차로 Daesin-ro
Naengjeong IS 냉정 교차로 Naengjeong-gil 279beon-gil
Jiphyeon Tunnel 집현터널 Approximately 130m
Daeam IS 대암 교차로 Prefectural Route 1007
(Jinsan-ro)
Prefectural Route 1007 overlap
Naedong IS 내동 교차로 Jinsan-ro
Jinsan-ro 1372beon-gil
Cheolsu IS 철수 교차로 Jinsan-ro
Jinsan-ro 1497beon-gil
Naerigok IS 내리곡 교차로 Jinsan-ro
Angan IS 안간 교차로 Prefectural Route 1007
(Angan-gil)
Micheon-myeon
Jeongchon Tunnel 정촌터널 Approximately 40m
Banghwa IS 방화 교차로 Jinsan-ro
Taebong-ro
Sancheong County Saengbiryang-myeon
Sadae IS 사대 교차로 Jinsan-ro
Saengbiryang IS 생비량 교차로 National Route 20
(Jirisan-daero)
Jirisan-daero 4763beon-gil
National Route 20 overlap
Songgye Bridge 송계교
Daeui IS 대의 교차로 National Route 20
(Uiryeong-daero)
Daeui-ro
Uiryeong County Daeui-myeon
Sinpyeong IS 신평 교차로 Moui-ro Hapcheon County Samga-myeon
Samga 1 Tunnel 삼가1터널 Approximately 690m
Samga IS 삼가 교차로 Bongdu-gil
Samga 2 Tunnel 삼가2터널 Approximately 431m
Yangjeon IS 양전 교차로 Prefectural Route 60
(Samga-ro)
Prefectural Route 60 overlap
No name (이름 없음) Prefectural Route 60
(Ssangbaekjungang-ro)
Ssangbaek-myeon Prefectural Route 60 overlap
Ssangbaek Tunnel 쌍백터널 Approximately 175m
Ungok IS 운곡 교차로 Ssangbaekjungang-ro
Myeokgok IS 멱곡 교차로 Ssangbaekjungang-ro
Jangjeon 2-gil
Adeung IS 아등 교차로 Ssangbaekjungang-ro
Hamji IS 함지 교차로 Daeya-ro
Dori-gil
Hamji-gil
Daeyang-myeon
Baemidong IS
Hapcheon IC
배미동 교차로
합천 나들목
Hamyang-Ulsan Expressway
Daeya-ro
Hani IS 하니 교차로 Hani-gil
Jeongyang IS 정양 교차로
Hapcheon IS 합천 교차로 National Route 24
(Dongbu-ro)
National Route 24 overlap
Hapcheon Bridge 합천대교
Hapcheon-eup
Gyodong IS 교동 교차로 Gangbyeon-ro
Oksan-ro
National Route 24 overlap
Sinsoyang Bridge 신소양교 National Route 24 overlap
Geumyang IS 금양 교차로 National Route 24
Prefectural Route 1034
(Daeya-ro)
National Route 24 overlap
Prefectural Route 1034 overlap
Yuljin IS 율진 교차로 Prefectural Route 1034
(Jenae-ro)
Yulgok-myeon Prefectural Route 1034 overlap
Noyang IS 노양 교차로 Prefectural Route 1084
(Noyang-gil)
Daeya-ro
Jiritjae Tunnel 지릿재터널 Approximately 618m
Continuation into North Gyeongsang Province
Name [75] Hangul name Connection Location Note
Jiritjae Tunnel 지릿재터널 Goryeong County Ssangnim-myeon Approximately 618m
South Gyeongsang Province - North Gyeongsang Province border line
Hapga IS 합가 교차로 Daegaya-ro
Gagok-gil
Maechon IS 매촌 교차로
Guiwon Bridge 귀원교
Guiwon IS 귀원삼거리 National Route 26
(Yeongseo-ro)
National Route 26 overlap
Ssangnim-myeon Office
Ssangnim Elementary School
Ssangnim Middle School
쌍림면사무소
쌍림초등학교
쌍림중학교
Anrim IS 안림삼거리 Prefectural Route 907
(Ssangssang-ro)
Gogok IS 고곡삼거리 Prefectural Route 1036
(Misung-ro)
No name (이름 없음) Sinnam-ro Daegaya-eup
Kaya University
Goryeong Campus (Closed)
가야대학교
고령캠퍼스 (폐교)
Jisan IS
(Daegaya Museum)
지산삼거리
(대가야박물관)
Wangneung-ro
Goryeong Square
(Goryeong Intercity Bus Terminal)
고령광장
(고령시외버스터미널)
Daegaya-ro
Jungang-ro
Janggi IS 장기삼거리 Illyang-ro
Heonmun IS 헌문 교차로 Prefectural Route 67
Prefectural Route 79
(Seongsan-ro)
Jungang-ro
National Route 26 overlap
Prefectural Route 67, 79 overlap
Goryeong IS 고령 교차로 National Route 26
(Donggoryeong-ro)
Naegokcheon Bridge 내곡천교 Prefectural Route 67, 79 overlap
Bongwan IS 본관 교차로 Daegaya-ro
Wolsan IS 월산 교차로 Prefectural Route 67
Prefectural Route 79
(Unnyong-ro)
Unsu-myeon
Beopsan Bridge (South end) 법산교 남단 Nameun-gil Seongju County Suryun-myeon
Sinpa Bridge
Suryun Middle School
신파교
수륜중학교
Suryun IS 수륜삼거리 National Route 59
(Seongjugayasan-ro)
National Route 59 overlap
Suryun-myeon Office
Suryun Elementary School
수륜면사무소
수륜초등학교
Yangjeong IS
Hoeyeon Seowon
양정삼거리
회연서원
Prefectural Route 913
(Dongganghangang-ro)
No name (이름 없음) National Route 59
(Chambyeol-ro)
Daeseong Bridge 대성교
Daega-myeon
No name (이름 없음) Chambyeol-ro
No name (이름 없음) Daegeum-ro
Daega Elementary School 대가초등학교
Daega National Agricultural Cooperative Federation Bank 대가농협 Prefectural Route 913
(Dongganghangang-ro)
Seongju IC
(Seongju IC IS)
성주 나들목
(성주IC 교차로)
Jungbu Naeryuk Expressway
Anteo IS 안터 교차로 Chambyeol-ro Seongju-eup
Daehwang IS 대황삼거리 National Route 30
(Simsan-ro)
National Route 30 overlap
Gyeongsan IS 경산 교차로 Prefectural Route 905
(Sangseong-ro)
Seongju IS 성주 교차로 National Route 30
(Seongju-ro)
Seongsan 9-gil
Seongju Underpass 성주지하차도 Approximately 385m
Galmak IS 갈막 교차로 Jusan-ro
Haksan 1 Bridge 학산1교
Wolhang-myeon
Anpo IS 안포 교차로 Jusan-ro
Yuwol IS 유월 교차로 Yuwolgongdan-gil
Haengjeong IS 행정 교차로 Jusan-ro
Haengjeong 1-gil
Chilgok County Gisan-myeon
Jukjeon IS 죽전 교차로 National Route 4
(Chilgok-daero)
National Route 4 overlap
Chilgok Fire Station 칠곡소방서
Gwanho IS (5-way IS) 관호오거리 Jungang-ro
Gwanho 8-gil
Gwanho 10-gil
Yakmok-myeon
Chilgok Police Station 칠곡경찰서
Gwanho IS 관호 교차로 National Route 4
(Chilgok-daero)
Gyeonghocheon Bridge 경호천교
Deoksan IS 덕산 교차로 Dongdeok-ro Buksam-eup
Imo IS 임오삼거리 Nakdonggangbyeon-ro Gumi City Gongdan-dong Connect with South Gumi IC
South Gumi Bridge 남구미대교 서단 Namgumi-ro
Sanho-daero
Gumi Bridge 구미대교 서단 Prefectural Route 514
(Suchul-daero)
Bisan IS
(Sanho Bridge)
비산네거리
(산호대교 남단)
Sanho-daero Bisan-dong
Sinpyeong Bridge (South end) 신평교 남단 Yaeun-ro
Chilseong-ro
Wonpyeong-dong
Sinpyeong Bridge 신평교
Jisan-dong
Wonji Bridge 원지교 북단 Saneom-ro
Yaeun-ro
Jisan-dong Community Center
Gumi Public Health Center
Geumo Girls' High School
지산동주민센터
구미보건소
금오여자고등학교
Gumi Agricultural and Marine Products Market 구미농수산물시장 Goa-eup
Songrim IS 송림삼거리 Deulseong-ro
Songpyeong-ro
No name (이름 없음) Prefectural Route 927
(Songseon-ro)
Goa Intercity Bus Terminal
Goa-eup Office
고아시외버스정류장
고아읍사무소
Oro IS 오로삼거리 Prefectural Route 916
(Poa-ro)
Prefectural Route 916 overlap
Oro IS 오로사거리 Oro 2-gil
Seonju Bridge 선주교
Seonsan-eup
1st Square 1호 광장 National Route 59
Prefectural Route 68
Prefectural Route 916
(Seonsan-daero)
National Route 59 overlap
Prefectural Route 68, 916 overlap
Seonsan Terminal 선산터미널 National Route 59 overlap
Prefectural Route 68 overlap
Sinae IS 시내 교차로 선산중앙로
Gyori IS 교리삼거리 National Route 59
(Seonsangdong-ro)
Saenggok IS 생곡 교차로 Yuhak-gil Prefectural Route 68 overlap
Seonsan Bridge 선산대교
Dogae-myeon
Dogae IS 도개 교차로 National Route 25
(Nakdong-daero)
Prefectural Route 68
(Seonsan-daero)
Terminus
Prefectural Route 68 overlap
Prefectural Route 68 overlap

References

  1. ^ 대통령령 제10247호 일반국도노선지정령, 1981년 3월 14일 일부개정.
  2. ^ ancNo=10247&efYd=19810314&nwJoYnInfo=N&efGubun=Y&chrClsCd=010202#0000 Presidential Decree No. 10247 Designation of General National Highway Routes, partially amended March 14, 1981.
  3. ^ Daegu Regional Land Management Office Announcement No. 17, May 8, 1981.
  4. ^ Busan Regional Office of National Land Management Announcement No. 16, May 12, 1981.
  5. ^ Ministry of Construction Notice No. 191, May 30, 1981.
  6. ^ Busan Regional Office of National Land Management Announcement No. 1996-9, January 18, 1996.
  7. ^ ancNo=15101&efYd=19960701&nwJoYnInfo=N&efGubun=Y&chrClsCd=010202#0000 Presidential Decree No. 15101 Designation of General National Highway Routes, Partially amended July 1, 1996.
  8. ^ Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 19
  9. ^ Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcements No. 1999-135, No. 1999-136, June 21, 1999.
  10. ^ Busan Regional Office of National Land Management Announcement No. 1999-200, September 2, 1999.
  11. ^ Busan Regional Office of National Land Management Announcement No. 1999-278, December 17, 1999.
  12. ^ paging=ok&startPage=12&searchType=DATA_TITLE&keyword=%EB%8F%84%EB%A1%9C%EC%82%AC%EC%9A%A9&searchStartDt=2001-01-01& searchEndDt=2011-12-31&dataSid=5131122&command=update&fileSid=2315676 Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2003-336, November 20, 2003.
  13. ^ November 27, 2003 paging=ok&startPage=12&searchType=DATA_TITLE&keyword=%EB%8F%84%EB%A1%9C%EC%82%AC% EC%9A%A9&searchStartDt=2001-01-01&searchEndDt=2011-12-31&dataSid=5131174&command=update&fileSid=2315371 Notice Correction.
  14. ^ paging=ok&startPage=12&searchType=DATA_TITLE&keyword=%EB%8F%84%EB%A1%9C%EC%82%AC% EC%9A%A9&searchStartDt=2001-01-01&searchEndDt=2011-12-31&dataSid=5129858&command=update&fileSid=2311538 Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2003-402, January 2, 2004.
  15. ^ paging=ok&startPage=12&searchType=DATA_TITLE&keyword=%EB%8F%84%EB%A1%9C%EC%82%AC% EC%9A%A9&searchStartDt=2001-01-01&searchEndDt=2011-12-31&dataSid=5129857&command=update&fileSid=2311537 Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2003-401, January 2, 2004.
  16. ^ Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcements No. 2003-413, No. 2003-416, January 15, 2004.
  17. ^ A1%9C%EC%82%AC%EC%9A%A9&searchStartDt=2001-01-01&searchEndDt=2011-12-31&dataSid=5131901&command=update&fileSid=2312587 Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2004-285, November 4, 2004.
  18. ^ paging=ok&startPage=11&searchType=DATA_TITLE&keyword=%EB%8F%84%EB%A1%9C%EC%82%AC%EC%9A%A9&searchStartDt=2001-01-01& searchEndDt=2011-12-31&dataSid=5131902&command=update&fileSid=2312588 Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2004-286, November 4, 2004.
  19. ^ paging=ok&startPage=10&searchType=DATA_TITLE&keyword=%EB%8F%84%EB%A1%9C%EC%82%AC%EC%9A%A9&searchStartDt=2001-01-01& searchEndDt=2011-12-31&dataSid=5133850&command=update&fileSid=2309816 Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2004-578, December 23, 2004.
  20. ^ tocId=00000000000000001319033152859000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2004-579, December 22, 2004.
  21. ^ A1%9C%EC%82%AC%EC%9A%A9&searchStartDt=2001-01-01&searchEndDt=2011-12-31&dataSid=5133851&command=update&fileSid=2309817 Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2004-579, December 23, 2004.
  22. ^ Busan Regional Office of National Land Management Announcement No. 2005-96, July 11, 2005.
  23. ^ isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2005-177, Jinju City Announcement No. 2005-1058, November 9, 2005.
  24. ^ paging=ok&startPage=8&searchType=DATA_TITLE&keyword=%EB%8F%84%EB%A1%9C%EC%82%AC%EC%9A%A9&searchStartDt=2001-01-01& searchEndDt=2011-12-31&dataSid=5135167&command=update&fileSid=2326165 Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2005-219, December 22, 2005.
  25. ^ paging=ok&startPage=8&searchType=DATA_TITLE&keyword=%EB%8F%84%EB%A1%9C%EC%82%AC%EC%9A%A9&searchStartDt=2001-01-01& searchEndDt=2011-12-31&dataSid=5135168&command=update&fileSid=2326166 Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2005-220, December 22, 2005.
  26. ^ paging=ok&startPage=6&searchType=DATA_TITLE&keyword=%EB%8F%84%EB%A1%9C%EC%82%AC%EC%9A%A9&searchStartDt=2001-01-01& searchEndDt=2011-12-31&dataSid=5137562&command=update&fileSid=2325582 Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2006-210, December 21, 2006.
  27. ^ paging=ok&startPage=6&searchType=DATA_TITLE&keyword=%EB%8F%84%EB%A1%9C%EC%82%AC%EC%9A%A9&searchStartDt=2001-01-01& searchEndDt=2011-12-31&dataSid=5137563&command=update&fileSid=2325583 Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2006-211, December 21, 2006.
  28. ^ isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2006-226, December 22, 2006.
  29. ^ tocId=00000000000000001319075332108000&isTocOrder=N Busan Regional Office of the Ministry of Land, Transport and Maritime Affairs Announcement No. 2006-227, December 22, 2006.
  30. ^ tocId=00000000000000001319079097491000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2007-172, September 21, 2007.
  31. ^ tocId=00000000000000001319079097842000&isTocOrder=N Busan Regional Land Management Office Announcement No. 2007-173, September 21, 2007.
  32. ^ tocId=00000000000000001319081449269000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2008-24, February 5, 2008.
  33. ^ tocId=00000000000000001319081449651000&isTocOrder=N Busan Regional Office of the Ministry of Land, Transport and Maritime Affairs Announcement No. 2008-25, February 5, 2008.
  34. ^ tocId=00000000000000001319084464854000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2008-203, September 10, 2008.
  35. ^ tocId=00000000000000001319084465168000&isTocOrder=N Busan Regional Office of the Ministry of Land, Transport and Maritime Affairs Announcement No. 2008-204, September 10, 2008.
  36. ^ paging=ok&startPage=3&searchType=DATA_TITLE&keyword=%EB%8F%84%EB%A1%9C%EC%82%AC%EC%9A%A9&searchStartDt=2001-01-01& searchEndDt=2011-12-31&dataSid=5143214&command=update&fileSid=2333415 Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2008-297, December 26, 2008.
  37. ^ paging=ok&startPage=3&searchType=DATA_TITLE&keyword=%EB%8F%84%EB%A1%9C%EC%82%AC%EC%9A%A9&searchStartDt=2001-01-01& searchEndDt=2011-12-31&dataSid=5143215&command=update&fileSid=2333416 Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2008-298, December 26, 2008.
  38. ^ tocId=00000000000000001319109596881000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2009-142, June 17, 2009.
  39. ^ tocId=00000000000000001319109597148000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2009-143, June 17, 2009.
  40. ^ tocId=00000000000000001319111210263000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2009-225, September 22, 2009.
  41. ^ tocId=00000000000000001319111210569000&isTocOrder=N Busan Regional Office of the Ministry of Land, Transport and Maritime Affairs Announcement No. 2009-226, September 22, 2009.
  42. ^ tocId=00000000000000001319108397071000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2009-295, December 11, 2009.
  43. ^ tocId=00000000000000001319108397339000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2009-296, December 11, 2009.
  44. ^ tocId=00000000000000001319108604580000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2009-312, December 24, 2009.
  45. ^ tocId=00000000000000001319108604962000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2009-313, December 24, 2009.
  46. ^ tocId=00000000000000001319108574918000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2009-310, December 23, 2009.
  47. ^ tocId=00000000000000001319108575209000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2009-311, December 23, 2009.
  48. ^ isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2012-31, February 24, 2012.
  49. ^ isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2012-109, June 22, 2012.
  50. ^ isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2015-11, February 9, 2015.
  51. ^ tocId=00000000000000001449461123622000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2015-160, September 21, 2015.
  52. ^ isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2015-213, November 20, 2015.
  53. ^ tocId=00000000000000001450339317900000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2015-239, December 21, 2015.
  54. ^ tocId=00000000000000001454373278077000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2016-9, February 3, 2016.
  55. ^ isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2016-42, March 15, 2016.
  56. ^ tocId=00000000000000001460000500162000&isTocOrder=N Ministry of Land, Infrastructure and Transport Notice No. 2016-172, April 8, 2016.
  57. ^ tocId=00000000000000001470382114374000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2016-143, August 9, 2016.
  58. ^ isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2016-144, August 9, 2016.
  59. ^ isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2016-145, August 9, 2016.
  60. ^ tocId=00000000000000001470382114819000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2016-146, August 9, 2016.
  61. ^ tocId=00000000000000001477553741400000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2016-185, October 31, 2016.
  62. ^ tocId=00000000000000001482365645777000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2016-233, December 23, 2016.
  63. ^ tocId=00000000000000001504744953041000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2017-167, September 8, 2017.
  64. ^ tocId=00000000000000001504744953150000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2017-168, September 8, 2017.
  65. ^ tocId=00000000000000001577088045838000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2019-231, December 26, 2019.
  66. ^ September 27, 2019 isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2019-554, but the opening was postponed to January 17, 2020.
  67. ^ Gumi City, ‘Gupo-Deoksan 2’ National Highway Bypass Road Opens on the 17th, Gyeongbuk Ilbo, January 15, 2020.
  68. ^ isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2020-77, March 9, 2020.
  69. ^ tocId=00000000000000001584317212847000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Notice No. 2020-83, March 17, 2020.
  70. ^ isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2020-102, June 29, 2020.
  71. ^ isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2021-90, June 14, 2021.
  72. ^ tocId=I0000000000000001638744608500000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2021-251, December 13, 2021.
  73. ^ tocId=I0000000000000001640247631363000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2021-268, December 29, 2021.
  74. ^ Intersection and interchange are also included, as well as buildings and facilities in the surrounding area
  75. ^ Intersection and interchange are also included, as well as buildings and facilities in the surrounding area