National Route 33 (South Korea)
33 | |
|---|---|
| 국도 제33호선 | |
| Route information | |
| Length | 226.1 km (140.5 mi) |
| Existed | 14 March 1981–present |
| Major junctions | |
| South end | Goseong, South Gyeongsang Province |
| North end | Gumi, North Gyeongsang Province |
| Location | |
| Country | South Korea |
| Highway system | |
National Route 33 is a national highway in South Korea connects Goseong to Gumi. It was established on 14 March 1981.[1]
History
- March 14, 1981: New construction of ‘’'National Highway Route 33'‘’ Goseong ~ Seonsan Line[2]
- May 8, 1981: Opening of the 92 km section from Hapga-dong, Ssangnim-myeon, Goryeong-gun to Saenggok-dong, Seonsan-eup, Seonsan-gun, upgraded to a national highway[3]
- May 12, 1981: Opening of the 110.745 km section from Songhak-dong, Goseong-eup, Goseong-gun to Wari, Yulgok-myeon, Hapcheon-gun, upgraded to a national highway[4]
- May 30, 1981: Designated as a new 172km section under the amended Presidential Decree No. 10247 on the Designation of General National Highway Routes[5]
- January 12, 1996: 900m section expansion and opening of the road between Yakmok and Gumi City Boundary (Yul-ri, Buksam-myeon, Chilgok-gun ~ Inpyeong-ri)[6]
- July 1, 1996: Terminus changed from ‘Seonsan-eup, Seonsan-gun, Gyeongsangbuk-do’ to ‘Seonsan-eup, Gumi-si, Gyeongsangbuk-do’. Consequently, it became the ‘Goseong ~ Gumi Line’.[7]
- May 8, 1998: Expansion and opening of the 3.2 km section from Gwanho-ri, Yakmok-myeon, Chilgok-gun to Yeongri, Gisan-myeon; existing 2.1 km section abolished[8]
- July 20, 1999: Opening of the 2.04 km section of the Daeyang Bypass Road (Deokjeong-ri, Daeyang-myeon, Hapcheon-gun ~ Daemok-ri), closing the existing 1.72 km section[9]
- September 3, 1999: Opening of the 2.4 km section of the Daeui Bypass Road (Chusan-ri, Daeui-myeon, Uiryeong-gun ~ Masang-ri)[10]
- December 21, 1999: Opening of the 1.74 km section of the Ssangbaek Bypass Road (from Pyeonggu-ri to Hasin-ri, Ssangbaek-myeon, Hapcheon-gun), with the existing 1.02 km section closed[11]
- November 22, 2003: Expansion and opening of the 4.56 km section of the Goseong Bypass Road (from Sinwol-ri to Gyosa-ri, Goseong-eup, Goseong-gun)[12][13]
- December 31, 2003: Goseong ~ Jaeun-gan Road (Goseong-gun, Goseong-eup, Gyosa-ri ~ Sangri-myeon, Musan-ri) section, 8.47km expansion and opening[14] and abolition of the existing 1.02 km section in Idang-ri, Goseong-eup, Goseong-gun[15]
- January 1, 2004: Opening of the 3.0 km section of Gwanho Bridge (Gwanho-ri, Yakmok-myeon, Chilgok-gun ~ Muri-ri) at Gwanho Intersection; expansion and opening of the 7.8 km section of the Waegwan ~ Gumi Road (Gwanho-ri, Yakmok-myeon, Chilgok-gun ~ Imun-dong, Gumi-si)[16]
- November 19, 2004: Hapcheon Bypass Road, Partial section of Hapcheon ~ Ssangnim Road (Jeongyang-ri, Daeyang-myeon, Hapcheon-gun ~ Yuljin-ri, Yulgok-myeon) 5.5km section expanded and opened,[17] Abolition of the existing 4.1km section from Jeongyang-ri, Daeyang-myeon, Hapcheon-gun to Geumyang-ri, Hapcheon-eup[18]
- December 28, 2004: Expansion and opening of the 8.0km section of the Jaeun ~ Sangri Road (Maseon-ri, Sangri-myeon, Goseong-gun ~ Hakchon-ri, Jeongdong-myeon, Sacheon-si),[19] Abolition of the 270m section in Sinchon-ri, Sangri-myeon, former Goseong-gun[20][21]
- July 1, 2005: Sanhwa Bridge access ramp section opened[22]
- November 9, 2005: Designated the 9.64 km section from Bonggang-ri, Jiphyeon-myeon, Jinju-si to Pyeonggeo-dong as an expressway[23]
- December 27, 2005: Sacheon Bypass Road (6.21 km section from Pungjeong-ri, Jeongdong-myeon, Sacheon-si to Baechun-ri, Chukdong-myeon) expansion opened to traffic,[24] Abolition of the existing 3.18km section from Pungjeong-ri, Jeongdong-myeon, Sacheon-si to Suseok-ri, Sacheon-eup[25]
- December 19, 2006: Expansion and opening of the 10.2 km section of the Jinju ~ Jipyeon Road (Jangjae-dong, Jinju-si ~ Jeongsu-ri, Jipyeon-myeon),[26] Abolition of the existing 13.2 km section[27]
- December 26, 2006: Expansion and opening of the 5.4 km section of the Hapcheon ~ Ssangnim Road (Wari, Yulgok-myeon, Hapcheon-gun ~ Hapga-ri, Ssangnim-myeon, Goryeong-gun),[28] Abolition of the existing 6.6 km section[29]
- September 21, 2007: Expansion and opening of the 10.98 km section of the Seongju–Whaegwan Road (Sam-san-ri, Seongju-eup, Seongju-gun ~ Yeong-ri, Gisan-myeon, Chilgok-gun),[30] Abolition of Existing Section[31]
- February 4, 2008: Expansion and opening of the 3.74 km section of the Ssangbaek ~ Hapcheon Road (Daemok-ri ~ Jeongyang-ri, Daeyang-myeon, Hapcheon-gun),[32] Abolition of Existing Section[33]
- September 10, 2008: Expansion and opening of the 2.6 km section of the Hapcheon ~ Ssangnim Road (Yuljin-ri, Yulgok-myeon, Hapcheon-gun ~ Wari),[34] Abolition of the existing 2.7 km section[35]
- December 30, 2008: Expansion and opening of the 5.0 km section of the Sangri ~ Sacheon Road (Hakchon-ri ~ Daegok-ri, Jeongdong-myeon, Sacheon-si),[36] Abolition of Existing Sections[37]
- June 9, 2009: Expansion and opening of the 5.8 km section of the Sangri ~ Sacheon Road (Hakchon-ri ~ Pungjeong-ri, Jeongdong-myeon, Sacheon-si),[38] Abolition of the existing 5.68 km section[39]
- September 25, 2009: Expansion and opening of the 2.84 km section of the Hapcheon ~ Ssangnim Road (Hapga-ri ~ Maechon-ri, Ssangnim-myeon, Goryeong-gun),[40] Abolition of the existing 2.9 km section[41]
- December 10, 2009: Expansion and opening of the 4.641 km section of the Seonsan ~ Dogae Road (Gumi-si, Seonsan-eup, Gyori ~ Dogae-myeon, Sillim-ri),[42] Abolition of the existing 2.4 km section[43]
- December 30, 2009: Expansion and opening of the 7.82 km section of the Jiphyun ~ Saengbiryang Road (Jeongsu-ri, Jiphyun-myeon, Jinju-si ~ Gage-ri, Saengbiryang-myeon, Sancheong-gun),[44] Abolition of the existing 8.48 km section[45]
- December 31, 2009: Expansion and opening of the 8.6 km section of the Ssangbaek ~ Hapcheon Road Section 1 (Jangjeon-ri, Ssangbaek-myeon ~ Deokjeong-ri, Daeyang-myeon, Hapcheon-gun),[46] Abolition of Existing Section[47]
- February 29, 2012: Expansion and opening of the 3.4 km section of the Jinju City National Highway Bypass Road between Yugok and Jeongchon (Doksan-ri, Naedong-myeon, Jinju City ~ Hwagae-ri, Jeongchon-myeon)[48]
- June 29, 2012: Expansion and opening of the 3.3 km section of the Jinju City National Highway Bypass Road between Yugok and Jeongchon (Ihyeon-dong, Jinju City ~ Doksan-ri, Naedong-myeon)[49]
- February 10, 2015: Opening of the 8.65 km section expansion of the Jipyeon ~ Yugok section of the Jinju City National Highway Bypass Road (Ihyeon-dong, Jinju City ~ Naengjeong-ri, Jipyeon-myeon)[50]
- September 21, 2015: Expansion and opening of the 7.8 km section of the Saengbiryang ~ Ssangbaekgan Road (from Masang-ri, Daeui-myeon, Uiryeong-gun to Pyeonggu-ri, Ssangbaek-myeon, Hapcheon-gun), with the existing 6.6 km section discontinued[51]
- November 20, 2015: Expansion and opening of the 1.0 km section of the Saengbiryang ~ Ssangbaekgan Road (Masang-ri, Daeui-myeon, Uiryeong-gun ~ Eojeon-ri, Samga-myeon, Hapcheon-gun)[52]
- December 22, 2015: Expansion and opening of the 10.64 km section of the Goryeong ~ Seongju Intercity Road Section 1 (Kwaebin-ri, Goryeong-eup, Goryeong-gun ~ Gyejeong-ri, Suryeon-myeon, Seongju-gun); closure of the existing 140 m section in Wolsan-ri, Unsu-myeon, Goryeong-gun,[53] Abolition of the existing 8.3km section (Kwaebin-ri, Daegaya-eup, Goryeong-gun ~ Gyejeong-ri, Suryeon-myeon)[54]
- March 15, 2016: The existing 16.68 km section within Jinju City (Hwagae-ri, Jeongchon-myeon ~ Naengjeong-ri, Jiphyeon-myeon, Jinju-si) was abolished upon completion of the Jinju City National Highway Bypass Road.[55]
- April 8, 2016: The section within Jinju City was removed and the route was changed to the National Highway Bypass Road section following the opening of the Jinju City National Highway Bypass Road.[56]
- August 9, 2016: The 6.77 km section from Gupo-dong to Gupyeong-dong in Gumi City designated as an automobile-only road,[57] Designated as an expressway for the 7.41 km section from Gupyeong-dong, Gumi-si to Deoksan-ri, Yakmok-myeon, Chilgok-gun,[58] designating the 8.57 km section from Geogido-dong, Gumi-si to Songnim-ri, Goa-eup as an automobile-only road,[59] designating the 11.2 km section from Songnim-ri, Goa-eup, Gumi-si to Wonjeom-ri, Seonsan-eup as an expressway[60]
- November 23, 2016: Temporary opening of a 1.78 km section (Ponam-ri, Seokjeok-eup, Chilgok-gun ~ O-pyeong-ri, Buksam-eup) within the Gumi City National Highway Bypass Road (Gupo ~ Deoksan section) for resident convenience[61]
- December 29, 2016: Expansion and opening of the 21.05 km section of the Goryeong ~ Seongju Intercity Road, Sections 2 and 3 (Gyejeong-ri, Suryeon-myeon, Seongju-gun ~ Daeheung-ri, Seongju-eup), abolishing the existing 6.1 km section from Gyejeong-ri to Sinjeong-ri, Suryeon-myeon, Seongju-gun[62]
- September 28, 2017: Expansion and opening of the 2.2 km section of the Ssangnim ~ Goryeong Road (Annim-ri, Ssangnim-myeon, Goryeong-gun ~ Goari, Daegaya-eup)[63] and the existing 9.0 km section from Gwewon-ri, Ssangnim-myeon, Goryeong-gun to Heonmun-ri, Daegaya-eup will be abolished[64]
- December 27, 2019: Expansion and opening of the 2.2 km section of the Ssangnim ~ Goryeong Road (Annim-ri ~ Gwewon-ri, Ssangnim-myeon, Goryeong-gun)[65]
- January 17, 2020: New 7.41 km section of Gumi City National Highway Bypass Road, Section 2 (Gupo ~ Deoksan) (Gupyeong-dong, Gumi City ~ Deoksan-ri, Yakmok-myeon, Chilgok-gun) opened to traffic[66][67]
- March 9, 2020: The existing 2.8 km section from the Deoksan Intersection in O-pyeong-ri, Buk-sam-eup, Chilgok-gun to the boundary of O-tae-dong, Gumi-si was abolished due to the opening of the Gumi City National Highway Bypass Road between Gupo and Deoksan. [68]
- March 17, 2020: The total length was reduced from 227.2 km to 211.3 km through a road route change notice[69]
- June 30, 2020: New opening of the 6.95 km section of the Gumi City National Highway Bypass Road, Section 1 (Gupo ~ Deoksan) (Gumi City Geogido ~ Gupyeong-dong).[70]
- June 30, 2021: New opening of the 9.7 km section of the Gumi City National Highway Bypass Road, Section 1 (Gumi City Geogido ~ Goaeup Songnim-ri) between Gupo and Saenggok[71]
- December 17, 2021: New opening of the 11.86 km section of the Gumi City National Highway Bypass Road, Section 2 (Songnim-ri, Goa-eup, Gumi City ~ Imun-ri, Seonsan-eup, Gumi City) between Gupo and Saenggok[72]
- December 29, 2021: The existing 11.7 km section of the Gumi City National Highway Bypass Road between Munseong-ri, Goa-eup and Dongbu-ri, Seonsan-eup was abolished due to the opening of the new Gupo ~ Saenggok section of the bypass road.[73]
Main stopovers
Major intersections
- (■): Motorway
IS: Intersection, IC: Interchange
| Name [74] | Hangul name | Connection | Location | Note | |
|---|---|---|---|---|---|
| Sinwol IC | 신월 나들목 | National Route 14 Prefectural Route 1018 (Namhaean-daero) |
Goseong County | Goseong-eup | Terminus |
| Manlim IC | 만림 나들목 | Nampo-ro 79beon-gil | |||
| No name | (이름 없음) | Songhakgobun-ro | |||
| Bupo IS | 부포사거리 | Prefectural Route 1016 (Bupo-ro) |
Sangni-myeon | Prefectural Route 1016 overlap | |
| Cheokjeong IS | 척정 교차로 | Prefectural Route 1016 (Samsang-ro) | |||
| Sangri IS | 상리 교차로 | Osan 3-gil Cheokbeonjeong 7-gil |
|||
| Gobong IS | 고봉 교차로 | Gobong-ro | |||
| Sogok IS | 소곡삼거리 | Sogok-gil | Sacheon City | Jeongdong-myeon | |
| Idong IS | 이동삼거리 | Soesil-gil | |||
| Hakchon IS | 학촌 교차로 | Hakchon-gil | |||
| Geonjeom IS | 건점 교차로 | Geonjeom 1-gil | |||
| Jeongdong IS | 정동 교차로 | Nocheon-gil | |||
| Daegok IS | 대곡 교차로 | ||||
| Singi IS | 신기 교차로 | Sucheong-gil Jangsam-gil |
|||
| Pungjeong IS | 풍정삼거리 | ||||
| Pungjeong IS | 풍정사거리 | Pungjeong-gil | |||
| Pungjeong IS | 풍정 교차로 | 옥산로 | |||
| Hwaam Tunnel | 화암터널 | Approximately 505m | |||
| Banggok IS | 방곡 교차로 | Prefectural Route 30 Prefectural Route 1002 (Guamdumun-ro) |
Sacheon-eup | ||
| Guam IS | 구암 교차로 | Prefectural Route 1002 (Duryang-ro) |
|||
| Baechun IS | 배춘삼거리 | National Route 3 (Sacheon-daero) |
National Route 3 overlap | ||
| Suseok Bridge | |||||
| Chukdong-myeon | |||||
| No name | (이름 없음) | Prefectural Route 1002 (Seosam-ro) |
National Route 3 overlap | ||
| Ungye IS | 운계 교차로 | Prefectural Route 1002 (Ungye-gil) |
National Route 3 overlap Prefectural Route 1002 overlap | ||
| Sacheon IC IS | 사천IC사거리 | Prefectural Route 1002 (Seosam-ro) Gilpyeong-gil | |||
| Sacheon IC IS | 사천IC 교차로 | Namhae Expressway | National Route 3 overlap | ||
| Yeha IS | 예하 교차로 | Gangju-gil | Jinju City | Jeongchon-myeon | |
| Yeha 1 Overpass | 예하1육교 | Daechuk-gil | |||
| No name | (이름 없음) | Jeongchon-ro | |||
| Hwagae IS | 화개 교차로 | National Route 2 (Jeongchon Bypass Road) Jinji-daero |
National Route 2 and National Route 3 overlap | ||
| Naedong IS | 내동 교차로 | National Route 2 (Gyeongseo-daero) |
Naedong-myeon | ||
| Namgang Bridge (South end) | (남강대교 남단) | Manggyeong-ro | National Route 3 overlap | ||
| Namgang Bridge (Huimang Bridge) |
남강대교 (희망교) |
||||
| Pyeonggeo-dong | |||||
| Huimang Bridge IS | 희망교 교차로 | Namgang-ro | |||
| No name | (이름 없음) | Pyeonggeo-ro Saepyeonggeo-ro |
National Route 3 overlap | ||
| 10 Square IS | 10호광장 교차로 | Jinnyangho-ro | |||
| Daesa IS | 대사 교차로 | Seojang-daero Sunhwan-ro 676beon-gil |
Ihyeon-dong | ||
| Nabulcheon Bridge | 나불천교 | ||||
| Myeongseok IS | 명석 교차로 | National Route 3 (Jinju-daero) | |||
| Hakgan Bridge | 각한교 | ||||
| Jiphyeon-myeon | |||||
| Gakhan Tunnel | 각한터널 | Right tunnel: Approximately 348m Left tunnel: Approximately 313m | |||
| Sachon 1 Bridge | 사촌1교 | ||||
| Sachon Tunnel | 사촌터널 | Right tunnel: Approximately 223m Left tunnel: Approximately 248m | |||
| Sachon 2 Bridge | 사촌2교 | ||||
| Sachon IS | 사촌 교차로 | Hanchigol-gil | |||
| Gwandong Bridge Gidong Bridge |
관동교 기동교 |
||||
| Gwanji Tunnel | 관지터널 | Approximately 246m | |||
| Bonggang 1 Bridge Bonggang 2 Bridge |
봉강1교 봉강2교 |
||||
| Jiphyeon IS | 집현 교차로 | Daesin-ro | |||
| Naengjeong IS | 냉정 교차로 | Naengjeong-gil 279beon-gil | |||
| Jiphyeon Tunnel | 집현터널 | Approximately 130m | |||
| Daeam IS | 대암 교차로 | Prefectural Route 1007 (Jinsan-ro) |
Prefectural Route 1007 overlap | ||
| Naedong IS | 내동 교차로 | Jinsan-ro Jinsan-ro 1372beon-gil | |||
| Cheolsu IS | 철수 교차로 | Jinsan-ro Jinsan-ro 1497beon-gil | |||
| Naerigok IS | 내리곡 교차로 | Jinsan-ro | |||
| Angan IS | 안간 교차로 | Prefectural Route 1007 (Angan-gil) |
Micheon-myeon | ||
| Jeongchon Tunnel | 정촌터널 | Approximately 40m | |||
| Banghwa IS | 방화 교차로 | Jinsan-ro Taebong-ro |
Sancheong County | Saengbiryang-myeon | |
| Sadae IS | 사대 교차로 | Jinsan-ro | |||
| Saengbiryang IS | 생비량 교차로 | National Route 20 (Jirisan-daero) Jirisan-daero 4763beon-gil |
National Route 20 overlap | ||
| Songgye Bridge | 송계교 | ||||
| Daeui IS | 대의 교차로 | National Route 20 (Uiryeong-daero) Daeui-ro |
Uiryeong County | Daeui-myeon | |
| Sinpyeong IS | 신평 교차로 | Moui-ro | Hapcheon County | Samga-myeon | |
| Samga 1 Tunnel | 삼가1터널 | Approximately 690m | |||
| Samga IS | 삼가 교차로 | Bongdu-gil | |||
| Samga 2 Tunnel | 삼가2터널 | Approximately 431m | |||
| Yangjeon IS | 양전 교차로 | Prefectural Route 60 (Samga-ro) |
Prefectural Route 60 overlap | ||
| No name | (이름 없음) | Prefectural Route 60 (Ssangbaekjungang-ro) |
Ssangbaek-myeon | Prefectural Route 60 overlap | |
| Ssangbaek Tunnel | 쌍백터널 | Approximately 175m | |||
| Ungok IS | 운곡 교차로 | Ssangbaekjungang-ro | |||
| Myeokgok IS | 멱곡 교차로 | Ssangbaekjungang-ro Jangjeon 2-gil |
|||
| Adeung IS | 아등 교차로 | Ssangbaekjungang-ro | |||
| Hamji IS | 함지 교차로 | Daeya-ro Dori-gil Hamji-gil |
Daeyang-myeon | ||
| Baemidong IS Hapcheon IC |
배미동 교차로 합천 나들목 |
Hamyang-Ulsan Expressway Daeya-ro |
|||
| Hani IS | 하니 교차로 | Hani-gil | |||
| Jeongyang IS | 정양 교차로 | ||||
| Hapcheon IS | 합천 교차로 | National Route 24 (Dongbu-ro) |
National Route 24 overlap | ||
| Hapcheon Bridge | 합천대교 | ||||
| Hapcheon-eup | |||||
| Gyodong IS | 교동 교차로 | Gangbyeon-ro Oksan-ro |
National Route 24 overlap | ||
| Sinsoyang Bridge | 신소양교 | National Route 24 overlap | |||
| Geumyang IS | 금양 교차로 | National Route 24 Prefectural Route 1034 (Daeya-ro) |
National Route 24 overlap Prefectural Route 1034 overlap | ||
| Yuljin IS | 율진 교차로 | Prefectural Route 1034 (Jenae-ro) |
Yulgok-myeon | Prefectural Route 1034 overlap | |
| Noyang IS | 노양 교차로 | Prefectural Route 1084 (Noyang-gil) Daeya-ro |
|||
| Jiritjae Tunnel | 지릿재터널 | Approximately 618m Continuation into North Gyeongsang Province | |||
| Name [75] | Hangul name | Connection | Location | Note | |
|---|---|---|---|---|---|
| Jiritjae Tunnel | 지릿재터널 | Goryeong County | Ssangnim-myeon | Approximately 618m South Gyeongsang Province - North Gyeongsang Province border line | |
| Hapga IS | 합가 교차로 | Daegaya-ro Gagok-gil |
|||
| Maechon IS | 매촌 교차로 | ||||
| Guiwon Bridge | 귀원교 | ||||
| Guiwon IS | 귀원삼거리 | National Route 26 (Yeongseo-ro) |
National Route 26 overlap | ||
| Ssangnim-myeon Office Ssangnim Elementary School Ssangnim Middle School |
쌍림면사무소 쌍림초등학교 쌍림중학교 |
||||
| Anrim IS | 안림삼거리 | Prefectural Route 907 (Ssangssang-ro) | |||
| Gogok IS | 고곡삼거리 | Prefectural Route 1036 (Misung-ro) | |||
| No name | (이름 없음) | Sinnam-ro | Daegaya-eup | ||
| Kaya University Goryeong Campus (Closed) |
가야대학교 고령캠퍼스 (폐교) |
||||
| Jisan IS (Daegaya Museum) |
지산삼거리 (대가야박물관) |
Wangneung-ro | |||
| Goryeong Square (Goryeong Intercity Bus Terminal) |
고령광장 (고령시외버스터미널) |
Daegaya-ro Jungang-ro | |||
| Janggi IS | 장기삼거리 | Illyang-ro | |||
| Heonmun IS | 헌문 교차로 | Prefectural Route 67 Prefectural Route 79 (Seongsan-ro) Jungang-ro |
National Route 26 overlap Prefectural Route 67, 79 overlap | ||
| Goryeong IS | 고령 교차로 | National Route 26 (Donggoryeong-ro) | |||
| Naegokcheon Bridge | 내곡천교 | Prefectural Route 67, 79 overlap | |||
| Bongwan IS | 본관 교차로 | Daegaya-ro | |||
| Wolsan IS | 월산 교차로 | Prefectural Route 67 Prefectural Route 79 (Unnyong-ro) |
Unsu-myeon | ||
| Beopsan Bridge (South end) | 법산교 남단 | Nameun-gil | Seongju County | Suryun-myeon | |
| Sinpa Bridge Suryun Middle School |
신파교 수륜중학교 |
||||
| Suryun IS | 수륜삼거리 | National Route 59 (Seongjugayasan-ro) |
National Route 59 overlap | ||
| Suryun-myeon Office Suryun Elementary School |
수륜면사무소 수륜초등학교 |
||||
| Yangjeong IS Hoeyeon Seowon |
양정삼거리 회연서원 |
Prefectural Route 913 (Dongganghangang-ro) | |||
| No name | (이름 없음) | National Route 59 (Chambyeol-ro) | |||
| Daeseong Bridge | 대성교 | ||||
| Daega-myeon | |||||
| No name | (이름 없음) | Chambyeol-ro | |||
| No name | (이름 없음) | Daegeum-ro | |||
| Daega Elementary School | 대가초등학교 | ||||
| Daega National Agricultural Cooperative Federation Bank | 대가농협 | Prefectural Route 913 (Dongganghangang-ro) |
|||
| Seongju IC (Seongju IC IS) |
성주 나들목 (성주IC 교차로) |
Jungbu Naeryuk Expressway | |||
| Anteo IS | 안터 교차로 | Chambyeol-ro | Seongju-eup | ||
| Daehwang IS | 대황삼거리 | National Route 30 (Simsan-ro) |
National Route 30 overlap | ||
| Gyeongsan IS | 경산 교차로 | Prefectural Route 905 (Sangseong-ro) | |||
| Seongju IS | 성주 교차로 | National Route 30 (Seongju-ro) Seongsan 9-gil | |||
| Seongju Underpass | 성주지하차도 | Approximately 385m | |||
| Galmak IS | 갈막 교차로 | Jusan-ro | |||
| Haksan 1 Bridge | 학산1교 | ||||
| Wolhang-myeon | |||||
| Anpo IS | 안포 교차로 | Jusan-ro | |||
| Yuwol IS | 유월 교차로 | Yuwolgongdan-gil | |||
| Haengjeong IS | 행정 교차로 | Jusan-ro Haengjeong 1-gil |
Chilgok County | Gisan-myeon | |
| Jukjeon IS | 죽전 교차로 | National Route 4 (Chilgok-daero) |
National Route 4 overlap | ||
| Chilgok Fire Station | 칠곡소방서 | ||||
| Gwanho IS (5-way IS) | 관호오거리 | Jungang-ro Gwanho 8-gil Gwanho 10-gil |
Yakmok-myeon | ||
| Chilgok Police Station | 칠곡경찰서 | ||||
| Gwanho IS | 관호 교차로 | National Route 4 (Chilgok-daero) | |||
| Gyeonghocheon Bridge | 경호천교 | ||||
| Deoksan IS | 덕산 교차로 | Dongdeok-ro | Buksam-eup | ||
| Imo IS | 임오삼거리 | Nakdonggangbyeon-ro | Gumi City | Gongdan-dong | Connect with South Gumi IC |
| South Gumi Bridge | 남구미대교 서단 | Namgumi-ro Sanho-daero |
|||
| Gumi Bridge | 구미대교 서단 | Prefectural Route 514 (Suchul-daero) |
|||
| Bisan IS (Sanho Bridge) |
비산네거리 (산호대교 남단) |
Sanho-daero | Bisan-dong | ||
| Sinpyeong Bridge (South end) | 신평교 남단 | Yaeun-ro Chilseong-ro |
Wonpyeong-dong | ||
| Sinpyeong Bridge | 신평교 | ||||
| Jisan-dong | |||||
| Wonji Bridge | 원지교 북단 | Saneom-ro Yaeun-ro |
|||
| Jisan-dong Community Center Gumi Public Health Center Geumo Girls' High School |
지산동주민센터 구미보건소 금오여자고등학교 |
||||
| Gumi Agricultural and Marine Products Market | 구미농수산물시장 | Goa-eup | |||
| Songrim IS | 송림삼거리 | Deulseong-ro Songpyeong-ro |
|||
| No name | (이름 없음) | Prefectural Route 927 (Songseon-ro) |
|||
| Goa Intercity Bus Terminal Goa-eup Office |
고아시외버스정류장 고아읍사무소 |
||||
| Oro IS | 오로삼거리 | Prefectural Route 916 (Poa-ro) |
Prefectural Route 916 overlap | ||
| Oro IS | 오로사거리 | Oro 2-gil | |||
| Seonju Bridge | 선주교 | ||||
| Seonsan-eup | |||||
| 1st Square | 1호 광장 | National Route 59 Prefectural Route 68 Prefectural Route 916 (Seonsan-daero) |
National Route 59 overlap Prefectural Route 68, 916 overlap | ||
| Seonsan Terminal | 선산터미널 | National Route 59 overlap Prefectural Route 68 overlap | |||
| Sinae IS | 시내 교차로 | 선산중앙로 | |||
| Gyori IS | 교리삼거리 | National Route 59 (Seonsangdong-ro) | |||
| Saenggok IS | 생곡 교차로 | Yuhak-gil | Prefectural Route 68 overlap | ||
| Seonsan Bridge | 선산대교 | ||||
| Dogae-myeon | |||||
| Dogae IS | 도개 교차로 | National Route 25 (Nakdong-daero) Prefectural Route 68 (Seonsan-daero) |
Terminus Prefectural Route 68 overlap | ||
| Prefectural Route 68 overlap | |||||
References
- ^ 대통령령 제10247호 일반국도노선지정령, 1981년 3월 14일 일부개정.
- ^ ancNo=10247&efYd=19810314&nwJoYnInfo=N&efGubun=Y&chrClsCd=010202#0000 Presidential Decree No. 10247 Designation of General National Highway Routes, partially amended March 14, 1981.
- ^ Daegu Regional Land Management Office Announcement No. 17, May 8, 1981.
- ^ Busan Regional Office of National Land Management Announcement No. 16, May 12, 1981.
- ^ Ministry of Construction Notice No. 191, May 30, 1981.
- ^ Busan Regional Office of National Land Management Announcement No. 1996-9, January 18, 1996.
- ^ ancNo=15101&efYd=19960701&nwJoYnInfo=N&efGubun=Y&chrClsCd=010202#0000 Presidential Decree No. 15101 Designation of General National Highway Routes, Partially amended July 1, 1996.
- ^ Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 19
- ^ Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcements No. 1999-135, No. 1999-136, June 21, 1999.
- ^ Busan Regional Office of National Land Management Announcement No. 1999-200, September 2, 1999.
- ^ Busan Regional Office of National Land Management Announcement No. 1999-278, December 17, 1999.
- ^ paging=ok&startPage=12&searchType=DATA_TITLE&keyword=%EB%8F%84%EB%A1%9C%EC%82%AC%EC%9A%A9&searchStartDt=2001-01-01& searchEndDt=2011-12-31&dataSid=5131122&command=update&fileSid=2315676 Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2003-336, November 20, 2003.
- ^ November 27, 2003 paging=ok&startPage=12&searchType=DATA_TITLE&keyword=%EB%8F%84%EB%A1%9C%EC%82%AC% EC%9A%A9&searchStartDt=2001-01-01&searchEndDt=2011-12-31&dataSid=5131174&command=update&fileSid=2315371 Notice Correction.
- ^ paging=ok&startPage=12&searchType=DATA_TITLE&keyword=%EB%8F%84%EB%A1%9C%EC%82%AC% EC%9A%A9&searchStartDt=2001-01-01&searchEndDt=2011-12-31&dataSid=5129858&command=update&fileSid=2311538 Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2003-402, January 2, 2004.
- ^ paging=ok&startPage=12&searchType=DATA_TITLE&keyword=%EB%8F%84%EB%A1%9C%EC%82%AC% EC%9A%A9&searchStartDt=2001-01-01&searchEndDt=2011-12-31&dataSid=5129857&command=update&fileSid=2311537 Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2003-401, January 2, 2004.
- ^ Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcements No. 2003-413, No. 2003-416, January 15, 2004.
- ^ A1%9C%EC%82%AC%EC%9A%A9&searchStartDt=2001-01-01&searchEndDt=2011-12-31&dataSid=5131901&command=update&fileSid=2312587 Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2004-285, November 4, 2004.
- ^ paging=ok&startPage=11&searchType=DATA_TITLE&keyword=%EB%8F%84%EB%A1%9C%EC%82%AC%EC%9A%A9&searchStartDt=2001-01-01& searchEndDt=2011-12-31&dataSid=5131902&command=update&fileSid=2312588 Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2004-286, November 4, 2004.
- ^ paging=ok&startPage=10&searchType=DATA_TITLE&keyword=%EB%8F%84%EB%A1%9C%EC%82%AC%EC%9A%A9&searchStartDt=2001-01-01& searchEndDt=2011-12-31&dataSid=5133850&command=update&fileSid=2309816 Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2004-578, December 23, 2004.
- ^ tocId=00000000000000001319033152859000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2004-579, December 22, 2004.
- ^ A1%9C%EC%82%AC%EC%9A%A9&searchStartDt=2001-01-01&searchEndDt=2011-12-31&dataSid=5133851&command=update&fileSid=2309817 Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2004-579, December 23, 2004.
- ^ Busan Regional Office of National Land Management Announcement No. 2005-96, July 11, 2005.
- ^ isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2005-177, Jinju City Announcement No. 2005-1058, November 9, 2005.
- ^ paging=ok&startPage=8&searchType=DATA_TITLE&keyword=%EB%8F%84%EB%A1%9C%EC%82%AC%EC%9A%A9&searchStartDt=2001-01-01& searchEndDt=2011-12-31&dataSid=5135167&command=update&fileSid=2326165 Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2005-219, December 22, 2005.
- ^ paging=ok&startPage=8&searchType=DATA_TITLE&keyword=%EB%8F%84%EB%A1%9C%EC%82%AC%EC%9A%A9&searchStartDt=2001-01-01& searchEndDt=2011-12-31&dataSid=5135168&command=update&fileSid=2326166 Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2005-220, December 22, 2005.
- ^ paging=ok&startPage=6&searchType=DATA_TITLE&keyword=%EB%8F%84%EB%A1%9C%EC%82%AC%EC%9A%A9&searchStartDt=2001-01-01& searchEndDt=2011-12-31&dataSid=5137562&command=update&fileSid=2325582 Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2006-210, December 21, 2006.
- ^ paging=ok&startPage=6&searchType=DATA_TITLE&keyword=%EB%8F%84%EB%A1%9C%EC%82%AC%EC%9A%A9&searchStartDt=2001-01-01& searchEndDt=2011-12-31&dataSid=5137563&command=update&fileSid=2325583 Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2006-211, December 21, 2006.
- ^ isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2006-226, December 22, 2006.
- ^ tocId=00000000000000001319075332108000&isTocOrder=N Busan Regional Office of the Ministry of Land, Transport and Maritime Affairs Announcement No. 2006-227, December 22, 2006.
- ^ tocId=00000000000000001319079097491000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2007-172, September 21, 2007.
- ^ tocId=00000000000000001319079097842000&isTocOrder=N Busan Regional Land Management Office Announcement No. 2007-173, September 21, 2007.
- ^ tocId=00000000000000001319081449269000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2008-24, February 5, 2008.
- ^ tocId=00000000000000001319081449651000&isTocOrder=N Busan Regional Office of the Ministry of Land, Transport and Maritime Affairs Announcement No. 2008-25, February 5, 2008.
- ^ tocId=00000000000000001319084464854000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2008-203, September 10, 2008.
- ^ tocId=00000000000000001319084465168000&isTocOrder=N Busan Regional Office of the Ministry of Land, Transport and Maritime Affairs Announcement No. 2008-204, September 10, 2008.
- ^ paging=ok&startPage=3&searchType=DATA_TITLE&keyword=%EB%8F%84%EB%A1%9C%EC%82%AC%EC%9A%A9&searchStartDt=2001-01-01& searchEndDt=2011-12-31&dataSid=5143214&command=update&fileSid=2333415 Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2008-297, December 26, 2008.
- ^ paging=ok&startPage=3&searchType=DATA_TITLE&keyword=%EB%8F%84%EB%A1%9C%EC%82%AC%EC%9A%A9&searchStartDt=2001-01-01& searchEndDt=2011-12-31&dataSid=5143215&command=update&fileSid=2333416 Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2008-298, December 26, 2008.
- ^ tocId=00000000000000001319109596881000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2009-142, June 17, 2009.
- ^ tocId=00000000000000001319109597148000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2009-143, June 17, 2009.
- ^ tocId=00000000000000001319111210263000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2009-225, September 22, 2009.
- ^ tocId=00000000000000001319111210569000&isTocOrder=N Busan Regional Office of the Ministry of Land, Transport and Maritime Affairs Announcement No. 2009-226, September 22, 2009.
- ^ tocId=00000000000000001319108397071000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2009-295, December 11, 2009.
- ^ tocId=00000000000000001319108397339000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2009-296, December 11, 2009.
- ^ tocId=00000000000000001319108604580000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2009-312, December 24, 2009.
- ^ tocId=00000000000000001319108604962000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2009-313, December 24, 2009.
- ^ tocId=00000000000000001319108574918000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2009-310, December 23, 2009.
- ^ tocId=00000000000000001319108575209000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2009-311, December 23, 2009.
- ^ isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2012-31, February 24, 2012.
- ^ isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2012-109, June 22, 2012.
- ^ isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2015-11, February 9, 2015.
- ^ tocId=00000000000000001449461123622000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2015-160, September 21, 2015.
- ^ isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2015-213, November 20, 2015.
- ^ tocId=00000000000000001450339317900000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2015-239, December 21, 2015.
- ^ tocId=00000000000000001454373278077000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2016-9, February 3, 2016.
- ^ isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2016-42, March 15, 2016.
- ^ tocId=00000000000000001460000500162000&isTocOrder=N Ministry of Land, Infrastructure and Transport Notice No. 2016-172, April 8, 2016.
- ^ tocId=00000000000000001470382114374000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2016-143, August 9, 2016.
- ^ isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2016-144, August 9, 2016.
- ^ isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2016-145, August 9, 2016.
- ^ tocId=00000000000000001470382114819000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2016-146, August 9, 2016.
- ^ tocId=00000000000000001477553741400000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2016-185, October 31, 2016.
- ^ tocId=00000000000000001482365645777000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2016-233, December 23, 2016.
- ^ tocId=00000000000000001504744953041000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2017-167, September 8, 2017.
- ^ tocId=00000000000000001504744953150000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2017-168, September 8, 2017.
- ^ tocId=00000000000000001577088045838000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2019-231, December 26, 2019.
- ^ September 27, 2019 isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2019-554, but the opening was postponed to January 17, 2020.
- ^ Gumi City, ‘Gupo-Deoksan 2’ National Highway Bypass Road Opens on the 17th, Gyeongbuk Ilbo, January 15, 2020.
- ^ isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2020-77, March 9, 2020.
- ^ tocId=00000000000000001584317212847000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Notice No. 2020-83, March 17, 2020.
- ^ isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2020-102, June 29, 2020.
- ^ isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2021-90, June 14, 2021.
- ^ tocId=I0000000000000001638744608500000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2021-251, December 13, 2021.
- ^ tocId=I0000000000000001640247631363000&isTocOrder=N Busan Regional Office of the Ministry of Land, Infrastructure and Transport Announcement No. 2021-268, December 29, 2021.
- ^ Intersection and interchange are also included, as well as buildings and facilities in the surrounding area
- ^ Intersection and interchange are also included, as well as buildings and facilities in the surrounding area