Zero Mile metro station
| General information | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Location | Pahadi Road, New Bypass, Transport Nagar, Patna-800026, Bihar | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Coordinates | 25°35′8.87″N 85°11′11.12″E / 25.5857972°N 85.1864222°E | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| System | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Operated by | Patna Metro Rail Corporation Ltd | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Tracks | Double track | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Construction | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Structure type | Elevated | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Other information | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Status | operational | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Opened | 06 October 2025 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Electrified | Single-phase 25 kV 50 Hz AC through overhead catenary | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Services | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Zero Mile is an elevated metro station on the Blue Line of Patna Metro in Patna, Bihar, India. It serves as one of the three stations in the Priority Corridor, which became operational on 6 October 2025.[1]
Overview
The station was inaugurated by Chief Minister Nitish Kumar on 6 October 2025, as part of the launch of the first operational stretch of the Patna Metro. Public services commenced the following day, 7 October 2025. The Zero Mile lies on a 3.6 kilometre elevated corridor that connects Bhootnath and Patliputra Bus Terminal metro stations. This corridor is the first phase of the Blue Line, which will eventually span 14.5 Kms, linking Patna Junction to Patliputra Bus Terminal through a combination of elevated and underground sections.[1]
This metro station serves the Transport Nagar and adjoining areas.
Infrastructure and facilities
The station features:
- Three-coach trains with a capacity of 158 seated and up to 940 standing passengers
- Bi-parting sliding doors and front emergency exits
- CCTV surveillance and bilingual announcements in Hindi and English
- Charging points for mobile devices and laptops
- Reserved seating for women and disabled passengers
Trains operate between 8:00 AM and 10:00 PM, with a frequency of every 20 minutes, totaling approximately 40–42 trips per day. Fares starts from ₹15, depending on the travel distance.[2]
Station layout
Zero Mile track layout | ||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms
| ||||||||||||||||||||||||||||||||||||||||||
| G | Street level | Exit/Entrance |
| L1 | Concourse | Station agent, ticket counters, information kiosks, public announcement systems, check-in/out facilities, food courts, retail shops, and accessibility features, etc |
| L2 | Side platform | Doors will open on the left | |
| Platform 2 Eastbound |
Towards → Patliputra Bus Terminal Next Station: Patliputra Bus Terminal | |
| Platform 1 Westbound |
Towards ← Patna Junction Next Station: Bhootnath | |
| Side platform | Doors will open on the left | ||
See also
References
- ^ a b "Nitish to inaugurate first phase of Patna metro on Oct 6, to open for public from Oct". The Times of India. 5 October 2025. Retrieved 6 October 2025.
- ^ "Bihar Elections 2025: CM Nitish Kumar inaugurates Patna Metro first phase; check route, stations, fare - CNBC TV18". CNBCTV18. 6 October 2025. Retrieved 6 October 2025.
