ADtranz low floor tram: Difference between revisions

Content deleted Content added
m Adding local short description: "German low floor tram model", overriding Wikidata description "tram model" (Shortdesc helper)
Lillywho301 (talk | contribs)
m Fixing grammatical errors, along with a factual error about the nature of the bogeys being linked. If they're linked by a universal joint, then that's surely a mechanical connection. Some sentences however in the "Second generation" section I can't fix because I don't even know what the original sentence means to say. It doesn't make sense.
Line 4: Line 4:
[[File:Straßenbahn Berlin GT6N.jpg|thumb|GT6N in [[Berlin]]]]
[[File:Straßenbahn Berlin GT6N.jpg|thumb|GT6N in [[Berlin]]]]


The '''ADtranz low floor tram''' was introduced in the 1990s as the world's first [[tram]] with a completely [[low floor]]. This tram was developed by [[MAN SE|MAN]] for the [[Bremen]] urban transport system. The prototype, tram number 3801, was first publicly introduced on 9 February 1990. From 1991 to 1993, it was tested in many European cities. Ten German cities have purchased this type. [[Adtranz]] took over the rail division of MAN in 1990.
The '''ADtranz low floor tram''' was introduced in the 1990s as the world's first [[tram]] with a completely [[low floor|low floor design]]. This tram was developed by [[MAN SE|MAN]] for the [[Bremen]] urban transport system. The prototype, tram number 3801, was first publicly introduced on 9 February 1990. From 1991 to 1993, it was being tested in many European cities. Ten German cities have purchased this type. [[Adtranz]] took over the rail division of MAN in 1990.


The naming scheme is GTxN/M/S/K from German {{lang|de|'''G'''elenk-'''T'''riebwagen}} (articulated propelled railcar) with '''x''' axles for a specific gauge ({{lang|de|'''N'''ormalspur}} - standard gauge, {{lang|de|'''M'''eterspur}} - meter gauge, {{lang|de|'''S'''chmalspur}} - narrow gauge, {{lang|de|'''K'''apspur}} - cape gauge). Delivered models include the standard-gauge version that was named '''GT6N''' or '''GT8N''' and the metre-gauge version that was called '''GT6M'''.
The naming scheme is GTxN/M/S/K from German {{lang|de|'''G'''elenk-'''T'''riebwagen}} (articulated propelled railcar) with '''x''' axles for a specific gauge ({{lang|de|'''N'''ormalspur}} - standard gauge, {{lang|de|'''M'''eterspur}} - meter gauge, {{lang|de|'''S'''chmalspur}} - narrow gauge, {{lang|de|'''K'''apspur}} - cape gauge). Delivered models include the standard-gauge version that was named '''GT6N''' or '''GT8N''' and the metre-gauge version that was called '''GT6M'''.


Adtranz [[low floor]] [[tram]]s come in lengths of three or four modules, all of which are approximately the same length. Under each module lies a [[bogie]]; the low floor, however, constrains the bogie's movement. Two of the axles are [[electrified]] linked to the bogie truck by means of a [[universal joint]]. Characteristic of this tram is its ability to follow curves, which requires a special track layout. This occurs when the first or last module drives through an arc and drags the other two modules (which are on the straight) after it.
Adtranz [[low floor]] [[tram]]s come in lengths of three or four modules, all of which are approximately the same length. Under each module lies a [[bogie]]; the low floor, however, constrains the bogie's movement. Two of the axles are mechanically linked to the bogie truck by means of a [[universal joint]]. Characteristic of this tram is its ability to follow curves, which requires a special track layout. This occurs when the first or last module drives through a curve and drags the other two modules (which are on the straight) after it.


<!--===Typ R===
<!--===Typ R===
Line 20: Line 20:
[[File:AEG-1G.png|thumb|First Generation, in curves the articulation between the centre and trailing sections bends in the opposite direction to the other articulation, this requires a special track layout]]
[[File:AEG-1G.png|thumb|First Generation, in curves the articulation between the centre and trailing sections bends in the opposite direction to the other articulation, this requires a special track layout]]
[[File:Dach einer Jenaer Straßenbahn in der Betriebshalle Burgau.JPG|thumb|Roof of a GT6M in Jena]]
[[File:Dach einer Jenaer Straßenbahn in der Betriebshalle Burgau.JPG|thumb|Roof of a GT6M in Jena]]
The company [[Hansa Waggonbau]] in Bremen had been among the first to introduce the concept of articulated railcars which was delivered to customers with the [[GT4 (Bremen)|GT4 model]] since 1959 (''[[:File:Strab_Brem_1963_419_2_Gr%C3%B6pelingen.jpg|example]]'') The fading interest in tram operation in the 1970s led to a bankruptcy of the company in 1975. Renewed interest in the concept sprang up in the late 1980s with Bremen and Munich to look for modernized versions of the GT type series. This included the wish for a low floor variant and all rail cars to be propelled. MAN took over the task to create a test model (number 561) in 1985 which had 3 units (instead of the 2 units of the GT4). The first model be on delivery (GT6N) was a three part electrical multiple unit (EMU) as well.
The company [[Hansa Waggonbau]] in Bremen had been among the first to introduce the concept of articulated railcars which had been delivered to customers with the [[GT4 (Bremen)|GT4 model]] since 1959 (''[[:File:Strab_Brem_1963_419_2_Gr%C3%B6pelingen.jpg|example]]'') The fading interest in tram operation in the 1970s however led to a bankruptcy of the company in 1975. Renewed interest in the concept sprang up in the late 1980s with Bremen and Munich to look for modernized versions of the GT type series. This included the wish for a low floor variant and all rail cars to supply traction. MAN took over the task to create a test model (number 561) in 1985 which consisted of 3 units (instead of the 2 units of the GT4). The first model to be delivered (GT6N) was a three part electrical multiple unit (EMU) as well.


Tram operation includes:
Tram operation includes:
Line 40: Line 40:
* Fukui: 12 GT6K, 2 GT4K
* Fukui: 12 GT6K, 2 GT4K


On the small tramnet in the Swedish city [[Norrköping]] they have four second-hand [[Adtranz]]-[[tram]] services since the end of the millennium. The different trams is the prototype "Bremen" (tram 3801) and three trams from Munich.
On the small tramnet in the Swedish city [[Norrköping]] there have been operating four second-hand [[Adtranz]]-[[tram]] services since the end of the millennium. The selection of stock consists of the prototype "Bremen" (tram 3801) and three units from Munich.


===Berlin===
===Berlin===
On 20 October 1992, the framework conditions for the procurement of 120 trams were adopted. The first car with the number 1001 was delivered to the [[Berliner Verkehrsbetriebe]] (BVG) on 23 August 1994. As problems were encountered in the first passenger cars, the next scheduled deployment was not until 14 November 1994. The first series included 29 trams; The second series consisted of 41 trams. The third series consisted of 60 trams. The fourth series comprises 30 trams. On 2 April 2003 the last car was delivered. The last series had the following changes compared to the previous deliveries:
On 20 October 1992, the framework conditions for the procurement of 120 trams were adopted. The first car with the number 1001 was delivered to the [[Berliner Verkehrsbetriebe]] (BVG) on 23 August 1994. As problems were encountered in the first passenger cars, the next scheduled deployment was not until 14 November 1994. The first series included 29 trams; The second series consisted of 41 trams. The third series consisted of 60 trams. The fourth series comprises 30 trams. The last unit had been delivered on the 2nd of April 2003. The last series had the following changes compared to the previous deliveries:
* Air conditioning also for the passenger compartment
* Air conditioning extended to the passenger compartment
* Tinted windows in the passenger compartment
* Tinted windows in the passenger compartment
* Raised roof panel around the entire car
* Raised roof panel around the entire car
* Glass cab rear wall
* Glass cab rear wall
* Fully glazed doors
* Fully glazed doors
* [[Liquid Crystal Display|LCD]] - Train target display with cameras for video surveillance
* [[Liquid Crystal Display|LCD]] - Train destination display
* Cameras for video surveillance
* Sound absorbing mats in the entire underbody area
* Sound absorbing mats in the entire underbody area
* Electrically height-adjustable foot switches in the driver's compartment
* Electrically height-adjustable foot switches in the driver's compartment


In February 2004 the tram Norrköping (Sweden) made the offer for 9 million euros five low-floor vehicles, of which two were of type GT6N and three of type GT6N-ZR. But Berlin rejected the sale.
In February 2004 the tram Norrköping (Sweden) made the offer for 9 million euros for five units, two of which were of type GT6N and three of type GT6N-ZR. But Berlin rejected the sale.


== Second generation ==
== Second generation ==
[[File:AEG-2G.png|thumb|]]
[[File:AEG-2G.png|thumb|]]
[[File:Tram olympiapark sued.jpeg|thumb|R3.3 tram in Munich]]
[[File:Tram olympiapark sued.jpeg|thumb|R3.3 tram in Munich]]
The response on the Adtranz's second generation trams was not successful on the market. Only Munich and Nuremberg ordered this type. Except for being renewed with the latest technology, it also featured a larger distance between the axles knows to this material (2 meters instead of 1.85 meter) so that the leg space on top of the bogies could be increased. Another difference is, which there here really talk is not of a 4-moduled tram (as the one provided to Bremen), but previously of two double-modulated trams. In the middle, the articulation has been lengthened and redesigned, so that the movements of the first and last two modules couldn't influence each other. Because of this swinging the modules is limited at - and driving out the arcs.
The response on the Adtranz's second generation trams was not successful on the market. Only Munich and Nuremberg ordered this type. Aside from being updated with the latest technology, it also featured a larger distance between the axles (2 meters instead of 1.85 meter) so that the leg space on top of the bogies could be increased. Another difference is, that where the previous generation had technically been a false bidirectional unit, in that it technically consisted of two front lead for each end respectively, it is now a true singular bidirectional multiple-unit. In the middle, the articulation has been lengthened and redesigned, so that the movements of the front and rear sets of modules couldn't influence each other. Because of this, any notable "snaking" only occurs whilst going in or out of curves.


Tram operation includes:
Tram operation includes:
Line 67: Line 68:
When [[Bombardier Transportation]] bought Adtranz, it ceased production of the GTx-trams; however, the concept of articulated railcars for low floor trams was carried forward to its [[Bombardier Incentro|Incentro]] model, which was eventually replaced by Bombardier's standardized [[Bombardier Flexity|Flexity]] family of vehicles. Of these, the [[Bombardier Flexity Berlin|Flexity Berlin]] was specially designed with a layout similar to the Incentro and GTx-series and can be considered to be among its immediate successors. These trams entered revenue service in 2011.
When [[Bombardier Transportation]] bought Adtranz, it ceased production of the GTx-trams; however, the concept of articulated railcars for low floor trams was carried forward to its [[Bombardier Incentro|Incentro]] model, which was eventually replaced by Bombardier's standardized [[Bombardier Flexity|Flexity]] family of vehicles. Of these, the [[Bombardier Flexity Berlin|Flexity Berlin]] was specially designed with a layout similar to the Incentro and GTx-series and can be considered to be among its immediate successors. These trams entered revenue service in 2011.


Competing manufacturer [[Siemens Mobility|Siemens Transportation Systems]] had been offering the [[Combino]] models with articulated railcars until some [[Combino#2004 - Recall due to flaws in construction|Combino construction flaws]] were observed. The new [[Siemens Avenio|Avenio]] family of tram models features a double articulation join similar to the second generation of ADtranz low floor trams. These have already been sold to Budapest and Almada (Portugal).
Competing manufacturer [[Siemens Mobility|Siemens Transportation Systems]] had been offering the [[Combino]] models with articulated railcars until some [[Combino#2004 - Recall due to flaws in construction|Combino construction flaws]] were observed. The new [[Siemens Avenio|Avenio]] family of tram models features a double articulation joint similar to the second generation of ADtranz low floor trams. These have already been sold to Budapest and Almada (Portugal).


Similar trams are the [[Alstom Citadis]], [[Sirio|AnsaldoBreda Sirio]] and [[CAF Urbos]], among others.
Similar trams are the [[Alstom Citadis]], [[Sirio|AnsaldoBreda Sirio]] and [[CAF Urbos]], among others.

Revision as of 11:45, 30 January 2022

GT6N in Berlin

The ADtranz low floor tram was introduced in the 1990s as the world's first tram with a completely low floor design. This tram was developed by MAN for the Bremen urban transport system. The prototype, tram number 3801, was first publicly introduced on 9 February 1990. From 1991 to 1993, it was being tested in many European cities. Ten German cities have purchased this type. Adtranz took over the rail division of MAN in 1990.

The naming scheme is GTxN/M/S/K from German Gelenk-Triebwagen (articulated propelled railcar) with x axles for a specific gauge (Normalspur - standard gauge, Meterspur - meter gauge, Schmalspur - narrow gauge, Kapspur - cape gauge). Delivered models include the standard-gauge version that was named GT6N or GT8N and the metre-gauge version that was called GT6M.

Adtranz low floor trams come in lengths of three or four modules, all of which are approximately the same length. Under each module lies a bogie; the low floor, however, constrains the bogie's movement. Two of the axles are mechanically linked to the bogie truck by means of a universal joint. Characteristic of this tram is its ability to follow curves, which requires a special track layout. This occurs when the first or last module drives through a curve and drags the other two modules (which are on the straight) after it.


First generation

First Generation, in curves the articulation between the centre and trailing sections bends in the opposite direction to the other articulation, this requires a special track layout
Roof of a GT6M in Jena

The company Hansa Waggonbau in Bremen had been among the first to introduce the concept of articulated railcars which had been delivered to customers with the GT4 model since 1959 (example) The fading interest in tram operation in the 1970s however led to a bankruptcy of the company in 1975. Renewed interest in the concept sprang up in the late 1980s with Bremen and Munich to look for modernized versions of the GT type series. This included the wish for a low floor variant and all rail cars to supply traction. MAN took over the task to create a test model (number 561) in 1985 which consisted of 3 units (instead of the 2 units of the GT4). The first model to be delivered (GT6N) was a three part electrical multiple unit (EMU) as well.

Tram operation includes:

  • Augsburg: 12 GT6M
  • Frankfurt (Oder): 8 GT6M
  • Jena: 33 GT6M
  • Mainz: 16 GT6M
  • Zwickau: 12 GT6M
  • Berlin: 150 GT6N
  • Bremen: 78 GT8N
  • Munich: 70 GT6N
  • Norrköping: 4 GT6N (bought from Bremen and Munich)
  • Nuremberg: 14 GT6N
  • Kumamoto: 4 GT4N
  • Braunschweig: 12 GT6S
  • Takaoka: 4 GT4K
  • Okayama: 1 GT4K
  • Toyama: 7 GT4K
  • Fukui: 12 GT6K, 2 GT4K

On the small tramnet in the Swedish city Norrköping there have been operating four second-hand Adtranz-tram services since the end of the millennium. The selection of stock consists of the prototype "Bremen" (tram 3801) and three units from Munich.

Berlin

On 20 October 1992, the framework conditions for the procurement of 120 trams were adopted. The first car with the number 1001 was delivered to the Berliner Verkehrsbetriebe (BVG) on 23 August 1994. As problems were encountered in the first passenger cars, the next scheduled deployment was not until 14 November 1994. The first series included 29 trams; The second series consisted of 41 trams. The third series consisted of 60 trams. The fourth series comprises 30 trams. The last unit had been delivered on the 2nd of April 2003. The last series had the following changes compared to the previous deliveries:

  • Air conditioning extended to the passenger compartment
  • Tinted windows in the passenger compartment
  • Raised roof panel around the entire car
  • Glass cab rear wall
  • Fully glazed doors
  • LCD - Train destination display
  • Cameras for video surveillance
  • Sound absorbing mats in the entire underbody area
  • Electrically height-adjustable foot switches in the driver's compartment

In February 2004 the tram Norrköping (Sweden) made the offer for 9 million euros for five units, two of which were of type GT6N and three of type GT6N-ZR. But Berlin rejected the sale.

Second generation

R3.3 tram in Munich

The response on the Adtranz's second generation trams was not successful on the market. Only Munich and Nuremberg ordered this type. Aside from being updated with the latest technology, it also featured a larger distance between the axles (2 meters instead of 1.85 meter) so that the leg space on top of the bogies could be increased. Another difference is, that where the previous generation had technically been a false bidirectional unit, in that it technically consisted of two front lead for each end respectively, it is now a true singular bidirectional multiple-unit. In the middle, the articulation has been lengthened and redesigned, so that the movements of the front and rear sets of modules couldn't influence each other. Because of this, any notable "snaking" only occurs whilst going in or out of curves.

Tram operation includes:

  • Munich: 20 GT8N
  • Nuremberg: 26 GT8N

Successors

When Bombardier Transportation bought Adtranz, it ceased production of the GTx-trams; however, the concept of articulated railcars for low floor trams was carried forward to its Incentro model, which was eventually replaced by Bombardier's standardized Flexity family of vehicles. Of these, the Flexity Berlin was specially designed with a layout similar to the Incentro and GTx-series and can be considered to be among its immediate successors. These trams entered revenue service in 2011.

Competing manufacturer Siemens Transportation Systems had been offering the Combino models with articulated railcars until some Combino construction flaws were observed. The new Avenio family of tram models features a double articulation joint similar to the second generation of ADtranz low floor trams. These have already been sold to Budapest and Almada (Portugal).

Similar trams are the Alstom Citadis, AnsaldoBreda Sirio and CAF Urbos, among others.

References