Hongasandra (also known as Garvebhavi Palya) is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bengaluru, India.

As per latest reports, the Yellow Line is slated to be operational around April 2025[1] instead of January 2025[2] with four trainsets which will be ready for operations after arriving from Titagarh Rail Systems in Kolkata.[3]

History

In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Hongasandra metro station along the 6.385 km Reach 5 – Package 2 section (Hosa Road - Bommanahalli) of the 18.825 km Yellow Line of Namma Metro. On 25 April 2017, ITD-ITD Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[4] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.

Station layout

Station Layout (TBC)

Hongasandra track layout (TBC)
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Delta Electronics - Bommasandra
Next Station: Kudlu Gate
Platform 1
Northbound
Towards ← Rashtreeya Vidyalaya Road
Next Station: Bommanahalli
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits

See also

References

No tags for this post.