Songgang station
Line 11 platform | |||||||||||||||||||||
| Chinese name | |||||||||||||||||||||
| Traditional Chinese | 松崗 | ||||||||||||||||||||
| Simplified Chinese | 松岗 | ||||||||||||||||||||
| |||||||||||||||||||||
| General information | |||||||||||||||||||||
| Location | Bao'an District, Shenzhen, Guangdong China | ||||||||||||||||||||
| Coordinates | 22°46′41″N 113°52′10″E / 22.77806°N 113.86944°E | ||||||||||||||||||||
| Operated by | SZMC (Shenzhen Metro Group) Shenzhen Line 12 Rail Transit Co., Ltd (Shenzhen Metro Group and PowerChina PPP) | ||||||||||||||||||||
| Lines | |||||||||||||||||||||
| Platforms | 8 (2 island platforms and 4 side platforms) | ||||||||||||||||||||
| Tracks | 6 | ||||||||||||||||||||
| Construction | |||||||||||||||||||||
| Structure type | Underground | ||||||||||||||||||||
| Accessible | Yes | ||||||||||||||||||||
| History | |||||||||||||||||||||
| Opened | Line 11: 28 June 2016 Line 6: 18 August 2020 Line 12: 28 December 2024 | ||||||||||||||||||||
| Services | |||||||||||||||||||||
| |||||||||||||||||||||
| |||||||||||||||||||||
Songgang station (simplified Chinese: 松岗站; traditional Chinese: 松崗; pinyin: Sōnggǎng; Jyutping: Cung4gong1; Cantonese Yale: Chùhnggōng) is an interchange station between Line 6, Line 11 and Line 12 of the Shenzhen Metro. Line 11 platforms opened on 28 June 2016, Line 6 platforms opened on August 18, 2020 and Line 12 platforms opened on 28 December 2024.[1]
Station layout
| G | - | Exits |
| B1F Concourse |
Lobby | Ticket Machines, Customer Service, Shops, Vending Machines |
| B2F 11 Platforms |
Platform | |
| Island platform, doors will open on the left | ||
| Platform | 11 towards Huaqiang South (Houting) | |
| B3F 6 Platforms |
Side platform, doors will open on the right | |
| Platform | ||
| Platform | 6 termination platform | |
| Side platform, doors will open on the right | ||
| B4F 12 Platforms | ||
| Side platform, doors will open on the right for alighting only | ||
| Platform | 12 towards Zuopaotai East (Langxia) | |
| Island platform, doors will open on the left or right for boarding only | ||
| Platform | 12 towards Zuopaotai East (Langxia) | |
| Side platform, doors will open on the left for alighting only | ||
Entrances/exits
The station had 6 points of entry/exit (A, C, D, E, F, G) when Line 6 and Line 11 opened. When Line 12 opened, 3 new points of entry/exit were constructed (H, K, L). The entrances for both parts are not connected. The station has bus stops at Exits C and G. Exits C, G, H and K are accessible via elevators.
- A: Bao'an Boulevard
B: Bao'an Boulevard (not open)- C: Bao'an Boulevard, Shajiang Road

- D: Xitou Industrial 4th Road
- E: Bao'an Boulevard
- F: Bao'an Boulevard
- G: Shajiang Road

- H: Shajiang Road

J: Shajiang Road (not open)- K: Shajiang Road

- L: Shajiang Road
-
Entrance K
-
Entrance L
Gallery
-
Line 6 terminating platform
-
Line 12 concourse
-
Line 12 island boarding platform
-
Line 12 side alighting platform
-
Line 6 platform culture wall 1
-
Line 6 platform culture wall 2
-
Line 12 transfer passage culture wall
References
External links
- Shenzhen Metro official page (Chinese)
- Shenzhen Metro official page (English)
- Street map
